D. Remer et al., Air Pollution Control: Estimate the Cost of Scale-up, Chemical Engineering. November 1994 [A-95-28-IV-J-61]
Other documents for the same rulemaking (all, by stage)
References: 6 extracted, 0 linked to papers
Leland T. & Tarnuin, AJ., "Engineerfrom the equipment itself. Hence, at low 2. Blank, ing Economy,* 3rd Ed., McGraw-Hill, 1989.
9. Remer, Donald S. and Chai, Lil., "Estimate capacity, increasing the size of the 3. "Encyclopedia of Cheinical Processing and DeCosts of Scaled-Up Process Plants,* Chem. Eng., Vol. 97, April 1990, p. 138. equipment may create only marginal sign,1 E i , McKetta, J. J., Marcel Dekker, Inc,
10. Remer, Donald S. and Idrovo, JJL, "Cost-Es"Process Equipment Cost, Biotechnology and cost increases. timating Factors for Biopharmaceutical Pharmaceutical," by Remer D.S., and Idrovo, Process Equipment,* BioPhorm, Vol 3., Sept J.H., VoL 43, pp. 294-306,1993. In addition to being aware ofthe limi1990, p. 36. tations of using the cost-capacity factors, 4. "Encyclopedia of Chemical Processing and De- 11. Thuesen, GJ . and Fabrvckv, WJ., "Engineersign, Ed., McKetta, J. J., Marcel Dekker, Inc., estimators must also be aware of potening Economy,* Prentice-Hall International Se"Process Equipment, Cost Scale-up," Remer, ries in Industiial and Systems Engineering, D.S., and Chai, LH., Vol. 43. pp. 306-317, tial errors fiom using inaccurate R val1984. 1993. ues. As mentioned before, when an R
12. Ulrich, Gael D., "A Guide to Cheinical Engi5. "Encyclopedia of Chemical Processing and Devalue is unknown, a rule of thumb is to neering Process Design and Economics," John sign,* Ed., McKetta, J. J., Marcel Dekker, Inc, Wiley 4 Sons, Inc., 1984. "Process Plants, Costs of Scale-up Units,* use R = 0.6 orR = 0.7 for estimating the
EPA 450/5-87-OO1A, 1987. ever, errors can arise if the actual R 6. Garrett, Donald E., "Chemical Engineering 14. Vatavuk, William M., "Estimating Costa of Air Economics," Van Nostrand Reinhold, 1989. PoUution Control," Lewis Publishers, 1990. value differs significantlyfrom0.6 or 0.7. Peters, Timmerhaus, K.D.. "Plant Vatavuk. William M., "Part V: Estimating the Figures 3 and 4 illustrate the potenDesign and Economics for Chemical EngiSize and Cost of Gas Conditioners," Chem. neers." Ed.. McGraw-Hill, 1991. Eng., Vol. 88, Feb. 1981, p. 127. tial error that may arise when 0.6 and = $36,04 55,000 f V 964^1 ' ^ 2 0 , 0 0 0 J 1.852 J
EE-16 CHEMICAL ENGINEERING/NOVEMBER 1994