BOF plant Secondary dedusting 2.1 Secondary dedusting 2.2 Unit 3 Unit 4 Power plant Unit 5 Gas and steam turbine Unit 6 X (1) Coke oven X ( 3) 15 % (1) Hourly average value. (2) According to the permit, Hg has to be monitored continuously at the reference plant due to local considerations (high content of Hg in the ore). Trials are still ongoing. (3) As of 06/2007, the current emission limit value was under revision. Continuous measurements should be performed for SO2 emissions.
NB: — Status 06/2007. Emissions which are measured discontinuously are not included in the table. Permit conditions might change in the course of the actual environmental impact assessment ‘Voestalpine L6’. — Where limit values have been set up, they are marked with an X (based on half-hourly average values).
NB: Dust used from an ESP of a sinter plant, working at 120 – 130 °C and containing three fields. Data are from the dust from the third field. Analysis by X-fluorescence and TOC. Source: [ 224, Xhrouet 2002 ] [ 231, Xhrouet et al. 2002 ] [ 234, Poland 2007 ] [ 387, Fisher et al. 2005 ]. 3.2.2.1.2.2 Heavy metals [ 7, Bothe 1993 ] [ 9, Fisher et al. 1998 ] [ 87, Medinger et al. 1996 ] [ 93, Matzke 1987 ] [ 143,
ESP dust Fuels Soluble chloride content (mg/kg) 27 – 159 51 – 125 22 – 3 800 2 500 – 34 074 78 – 629 Source: [ 387, Fisher et al. 2005 ]. Iron and Steel Production Chapter 3 3.2.2.1.2.4 Sulphur oxides (SOX) [ 4, Beer et al. 1991 ] [ 7, Bothe 1993 ] [ 65, InfoMil 1997 ] [ 200, Commission 2001 ] [ 256, Kasai et al. 2001 ] [ 263, Kasai et al. 2001 ] [ 300, Eurofer 2007 ] Sulphur oxides (mainly SO2) in the waste gas originate from the combustion of sulphur compounds in the sinter feed. These sulphur compounds are primarily introduced through the coke breeze. The contribution from iron ore is normally about ten times smaller. Total sulphur input varies between 0.28 and 0.81 kg/t sinter. The emissions concentrations for SO2 are normally between 200 and 1000 g SO2/t sinter (which equates to average waste gas emissions concentrations of 95 to 480 mg/Nm3 based on a waste gas flow of 2100 Nm3/t sinter). The emissions profile along the sinter strand clearly varies, with considerable differences in SO2 concentrations in the individual windboxes (see Figure 3.7 and Figure 3.8). Similar behaviour of emissions has been found in more recent studies [ 200, Commission 2001 ] [ 256, Kasai et al. 2001 ] [ 263, Kasai et al. 2001 ]. Source: [ 256, Kasai et al. 2001 ] Figure 3.7: Distribution of temperature and concentration of gas compounds in the exhaust gas from the windboxes Iron and Steel Production Chapter 3
EUR 16 to 35/Nm3/h (for new and existing plants). Decisive cost factors are pressure drop, the waste gas flow, fabric material and filter loading. The operating cost is around EUR 0.3 – 0.6/t sinter and mostly depends on the costs of supplying activated carbon and limestone, and the extra energy. Examples of costs are shown in Table 3.21. Driving force for implementation Sinter plants are the major source for dust and dioxin/furan emissions from integrated steelworks. The driving force for implementation is to meet the prescribed emission limit values for dust, heavy metals and PCDD/F, to lower national emissions to meet the national reduction goals according to national and international regulations, environmental reputation and in the case of the plant at Voestalpine Stahl GmbH, Linz, Austria improved economics compared to the AIRFINE system. According to the Basel Convention and the corresponding Regulation (EC) 850/2004 regarding the treatment of POP-containing waste materials, amended by Regulation (EC) 304/09/EC, transboundary shipments of wastes like iron-bearing filter dust or sludges for recycling purposes are only permissible if the receiving facility complies with an ELV for PCDD/F of 0.1 ng ITEQ/m3. Iron and Steel Production Chapter 3 Table 3.21: Examples of the cost of bag filters installed in sinter plants Economic characteristics Sinter plant ArcelorMittal
REFERENCES Arimitsu, ‘Energy Saving in the Japanese Steel Industry’, European Symposium on Environmental Control in Steel Industry, 1995, pp. 105-136. Auth et al., ‘Die Entwicklung des Thyssen-Heißbrikettier-Verfahrens und die betriebliche Anwendung (The Development of the Thyssen-Hot-Briquetting Process and its Practical Application)’, Dritte Duisburger Recycling-Tage, 1988.
Remus, R., ‘Minutes from the Expert meeting Emissions from storage and handling of bulk materials’, Expert meeting Emissions from storage and handling of bulk materials, 1998,
Umweltbundesamt, Berlin, Germany. Beer et al., ‘Auswirkungen unterschiedlicher Koksgruskoernungen bei der Eisenerzsinterung (Impacts of Different Coke Breeze Grain Size Distribution on the Sintering Process)’, Stahl und Eisen 111, Vol. No. 8, 57-64, 1991. Beer et al., ‘Verfahrenstechnische und metallurgische Maßnahmen zur Verminderung des Energieeinsatzes in Sinteranlagen (Process-integrated and Metallurgical Measures to Reduce Energy Consumption of Sinter Plants)’, Stahl und Eisen, Vol. No. 11, 25-37, 1991.
Volkhausen, W., ‘Description of the Oxycup Process’, Personal Communication, 2008.
Bothe, Umweltproblematik bei der Eisenerzsinterung (Environmental Problems of the Iron Ores Sintering Process), 1993.
Endemann, G., ‘Description of the DK-Process’, Personal Communication, 2008. Fisher et al., ‘Investigation of the Formation of Dioxins in the Sintering Process’, 2nd International Congress on the Science and Technology of Ironmaking Conjunction with the 57th Ironmaking Conference of Iron and Steel Society, 1998, C-Toronto.
[10] Kessler, K., ‘Zero Waste Production bei der Stahlverwertung’, Metall, Vol. Vol. 59 3, No 2005, 2005.
[11] Campell et al., Oxy-coal Injection at Cleveland Iron Works, 1992, pp. 120-125.
[12] VDEh, Technical Background Paper om Recycling of FE-containing Material, 2006.
[13] Deckers et al., ‘Development of Environmental Control Technologies’, European Symposium on Environmental Control in Steel Industry, 1995, Praha.
[14] Dietrich, Reaktionskinetische Betrachtungen des Sintervorganges und Moeglichkeiten zur Leistungssteigerung (About the Reaction Kinetics of the Sintering Process and Possibilities for Productivity Increase), 1961.
[16] Rentz, Report on Best Available Techniques in the Electric Steelmaking Industry, FrenchGerman Institute for Environmental Research, 1997.
[17] Hillman, C. and Sassen, K.-J., ‘Solutions for dusts and sludges from the BOF process’, Stahl und Eisen, Vol. Vol 128 Nr. 5, 2006.
[18] VDI/DIN, VDI 3790 part 1 Environmental meteorology - Emissions of gases, odours and dusts form diffuse sources - Fundamentals, 2005.
[19] EC BOF, Technical Note on the Best Available Techniques to Reduce Emissions of Pollutants into the Air from the Basic Oxygen Steel Making, 1995.
[20] VDI/DIN, VDI 4210 part 1 Remote sensing - Atmospheric measurements with LIDAR Measuring gaseous air pollution with DAS LIDAR, 1999.
[21] EC Coke, Study on the Technical and Economical Aspects of Measures to Reduce (on the Basis of the Best Available Technologies) the Pollution (of Water and Other Environmental Areas) from the Industrial Emissions of Cokeries, 1996.
[22] EC EAF, Technical Note on the Best Available Technologies to Reduce Emissions of Pollutants into the Air from Electric Arc Steel Production Plants, 1994. Iron and Steel Production References
[23] EC EAF, Optimisation of Environment and Related Energy Utilisation in Scrap-based Steelmaking (Phase I), 1997.
[24] EC Haskoning, Techno-economic Study on the Reduction Measures, Based on Best Available Technologies, of Water Discharges and Waste Generation from the Primary and Secondary Iron & Steel Industry, 1993.
[25] VDI/DIN, VDI 4285 part 1 Determination of diffuse emissions by measurements - Basic concepts, 2005.
[26] Oberösterreichische Landesregierung, UVP Linz 2010: Permit of the Environmental Impact Assessment ‘Linz 2010’, 2004.
[27] EC Panorama, ‘Iron and Steel’, Panorama of EU Industry 97, Vol. Vol.1 10-8 - 10-14, 1997.
[28] ECSC, Treaty on the foundation of the European Union for Coal and Steel on April 18th (1951), 1951.
[29] EC Sinter/BF, Technical Note on Best Available Techniques to Reduce Emissions of Pollutants into the Air from Sinter Plants, Pelletisation and Blast Furnaces, 1995.
[30] Roederer et al., Coordinated Study ‘Steel-Environment’, 1996.
[32] Voestalpine Linz, Environmental statement 2008, 2008.
[33] Eisenhut et al., ‘New Findings and Developments in Environmental Protection and Health Safety at Work on Coke Oven Plants’, Ironmaking Conference Proceedings, 1988, Bergbau-Forschung GmbH, D-Essen.
[34] dena, Successful Record for Pump Systems: Energy Effciency Pays Off, 2007.
[35] Dr. Luengen, H.B., ‘Technische Entwicklungen in der Stahlindustrie verringern CO2Emissionen’, Rheinklima - die Zukunftsfaehigkeit eines europaeischen Wirtschaftsraums im Wandel des Klimas, 2005, Bonn.
[36] EPRI, Proceedings of the CMP Electric Arc Furnace Dust Treatment Symposium, EPRI Center for Materials Production, 1992.
[37] Motz, Annex I: Substance Identity - from the ferrous slag consortium agreement, 2009.
[38] EUROFER BOF, Document on “Oxygen Steelmaking and Casting”, – Environmental Committee – Task Group Oxygen Steelmaking, 1997.
[39] EUROFER EAF, Document on “Electric Arc Furnace Steelmaking”, – Environmental Committee – Task Group Electric Arc Furnace Steelmaking, 1997.
[40] IPCC, Fourth Assessmant Report on Climate Change 2007, Synthesis Report, IPCC, 2007.
[41] European Commission, BREF on Industrial Cooling Systems, European Commission, 2001.
[42] EC, Reference Document on General Principles of Monitoring (MON), 2003.
[43] Freuhan, ‘Challenges and Opportunities in the Steel Industry’, Iron and Steel Magazine, Vol. No. 3, 1993, pp. 59-64.
[44] Freuhan, ‘Effect of Emerging Technologies on Competitiveness in the Steel Industry’, Iron and Steel Magazine, Vol. No. 2, 1994, pp. 17-22.
[45] Gebert, Abgasreinigungssysteme fuer Sinteranlagen (Off Gas Purification Systems for Sinter Plants), 1995.
[46] Geiseler, ‘Verwertung der Stahlwerksschlacken (Re-use of Slags from Basic Oxygen Steelmaking)’, Stahl und Eisen 111, Vol. No. 1, 1991, pp. 133-138.
[47] Geiseler, Verwertung von Hochofen- und Stahlwerksschlacken (Re-use of Blast Furnace and BOF Slag), 1992, pp. 1-32.
[48] EC, Reference Document on Energy Efficiency (ENE), 2008. Iron and Steel Production References
[49] Goverde et al., Milieuvoorzieningen bij Hoogovens Ijmuiden, 1995.
[50] Grützmacher et al., Staubunterdrueckung in Hochofengießhallen (Dust Supression in Cast Houses), 1991, pp. 51-56.