Policy Replication

Trichloroethylene; Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extension. September 17, 2025

Docket document2026-10-14 · EPA · publication · EPA-HQ-OPPT-2026-7327-0003
RIN 2070-AL45 · Docket EPA-HQ-OPPT-2026-7327

Other documents for the same rulemaking (all, by stage)

2026-10-14 Federal RegisterTrichloroethylene (TCE); Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extensions
2026-10-14 Regulatory impact analysisEconomic Analysis of the Regulation of Trichloroethylene Under TSCA Section 6(a)
2026-10-14 Docket documentDocumentation of EO 12866 Review; Trichloroethylene (TCE); Regulation under the Toxic Substances Control Act (TSCA); Compliance Date Extensions; Proposed Rule (RIN 2070-AL45)
2026-10-14 Docket documentTrichloroethylene (TCE) Regulation Under the Toxic Substances Control Act (TSCA). December 17, 2024

References

Page 1Download these results: CSV · JSON
3. EPA. BWX Technologies Inc Meeting Memo. July 15, 2025.
research reportNot linked to a paper · refsec
5. EPA. Department of Energy Meeting Memo. July 16, 2025.
research reportNot linked to a paper · refsec
6. EPA. Nuclear Regulatory Commission Meeting Memo. July 29, 2025.
research reportNot linked to a paper · refsec
7. EPA. Department of Defense Meeting Memo. August 4, 2025. E:\FR\FM\17SER1.SGM 17SER1 lotter on DSK11XQN23PROD with RULES1 44780 Federal Register / Vol. 90, No. 178 / Wednesday, September 17, 2025 / Rules and Regulations 8. Department of Defense, Office of the Under Secretary of Defense, Research and Engineering. Project Pele Mobile Nuclear Reactor. Accessed July 15, 2025. https:// www.cto.mil/pele_eis/.
datasetNot linked to a paper · refsec
9. BWXT. Project Pele Begins Taking Shape with Start of Core Manufacturing. Accessed July 15, 2025. https:// www.bwxt.com/project-pele-beginstaking-shape-with-start-of-coremanufacturing/. 10. Jeff Waksman. Project Pele Overview Mobile Nuclear Power For Future DoD
datasetNot linked to a paper · refsec
Need, Slides Supporting Presentation Materials for May 2022. Accessed July 15, 2025. https://www.nrc.gov/docs/ ML2212/ML22126A059.pdf. 11. Executive Order 14299. Deploying Advanced Nuclear Reactor Technologies for National Security. Federal Register (90 FR 22581, May 29, 2025). https:// www.govinfo.gov/content/pkg/FR-202505-29/pdf/2025-09796.pdf. 12. Executive Order 14300. Ordering the Reform of the Nuclear Regulatory Commission. Federal Register (90 FR 22587, May 29, 2025). https:// www.govinfo.gov/content/pkg/FR-202505-29/pdf/2025-09798.pdf. 13. Executive Order 14301. Reforming Nuclear Reactor Testing at the Department of Energy. Federal Register (90 FR 22591, May 29, 2025). https:// www.govinfo.gov/content/pkg/FR-202505-29/pdf/2025-09799.pdf. 14. Executive Order 14302. Reinvigorating the Nuclear Industrial Base. Federal Register (90 FR 22595, May 29, 2025). https://www.govinfo.gov/content/pkg/
datasetNot linked to a paper · refsec · cited link
FR-2025-05-29/pdf/2025-09801.pdf. 15. Nuclear Regulatory Commission. BWXT Materials License SNM–0042, Renewed 2007. March 29, 2007. Accessed August 8, 2025. https://www.nrc.gov/docs/ ML0813/ML081330687.pdf. 16. Robert Simon. American Chemistry Council’s Petition for Rulemaking to Reconsider Provisions of the Trichloroethylene TSCA Risk Management Rule, 89 FR 102568 (Dec. 17, 2024). May 27, 2025. https:// www.epa.gov/system/files/documents/ 2025-06/sec.-21-petition-acc-reconsidertce-rm-rule-25-04529-ao-ex-1.pdf.
datasetNot linked to a paper · refsec · cited link
17. EPA. American Chemistry Council Meeting Memo. July 23, 2025.
research reportNot linked to a paper · refsec
FR-2023-10-31/pdf/2023-23010.pdf. 22. United States Nuclear Regulatory Commission. TRISO–X. Accessed August 8, 2025. https://www.nrc.gov/info-finder/ fc/triso-x.html. 23. United States Nuclear Regulatory Commission. FRAMATOME. Accessed August 8, 2025. https://www.nrc.gov/ info-finder/fc/areva-np-lc.html.
datasetNot linked to a paper · refsec · cited link
TSCA Section 6(a) Amendment to the 2024 Final Rule—Interim Final Rule. September 10, 2025. B. Executive Order 14192: Unleashing Prosperity Through Deregulation This action is an Executive Order 14192 deregulatory action. This interim final rule provides burden reduction by providing relief against existing compliance deadlines. the ICR in the docket for this rule, and it is briefly summarized here. The information collection requirements are not enforceable until OMB approves them. The provision that may increase burden under the PRA is downstream notification, which is required to be carried out by updates to the relevant
research reportNot linked to a paper · refsec