{"document":{"doc_id":18088,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Prevention of Significant Deterioration, Nonattainment New Source Review, and New Source Performance Standards: Emissions Test for Electric Generating Units","date":"2005-10-20","url":"https://www.federalregister.gov/documents/2005/10/20/05-20983/prevention-of-significant-deterioration-nonattainment-new-source-review-and-new-source-performance","source_native_id":"05-20983","status":"fetched","abstract":"The EPA (we) is proposing to revise the emissions test for existing electric generating units (EGUs) that are subject to the regulations governing the Prevention of Significant Deterioration (PSD) and nonattainment major New Source Review (NSR) programs (collectively \"NSR\") mandated by parts C and D of title I of the Clean Air Act (CAA or Act). The revised emissions test is the same as that in the New Source Performance Standards (NSPS) program under CAA section 111(a)(4). For existing EGUs, we are proposing to compare the maximum hourly emissions achievable at that unit during the past 5 years to the maximum hourly emissions achievable at that unit after the change to determine whether an emissions increase would occur. Alternatively, we are soliciting public comment on a major NSR emissions test for existing EGUs that would compare maximum hourly emissions achieved before a change to the maximum hourly emissions achieved after the change. We are also soliciting public comment on adopting an NSR emissions test based on mass of emissions per unit of energy output. In addition, we are soliciting comment on whether to revise the NSPS regulations to include a maximum achieved emissions test or an output- based emissions test, either in lieu of or in addition to the maximum achievable hourly emissions test. Today's proposal would not affect new EGUs, which would continue to be subject to major NSR preconstruction review and to the NSPS program. The proposed rule would only apply prospectively to changes at existing EGUs potentially covered by major NSR and the NSPS programs. These proposed regulations interpret CAA section 111(a)(4), in the context of NSR and NSPS, for physical changes and changes in the method of operation at existing EGUs. The proposed regulations would establish a uniform emissions test nationally under the NSPS and NSR programs for existing EGUs. The proposed regulations would also promote the safety, reliability, and efficiency of EGUs.","action":"Proposed rule."},"dockets":["OAR-2005-0163"],"rins":["RIN 2060-AN28"],"related":[{"doc_id":74817,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Final Clean Air Interstate Rule [EPA-452/R-05-002]","date":"2005-08-31"},{"doc_id":74834,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis for the Final Clean Air Visibility Rule or the Guidelines for Best Available Retrofit Technology (BART) Determinations Under the Regional Haze Regulations [EPA-452/R-05-004]","date":"2005-09-20"},{"doc_id":134488,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax from A. Fraas, OMB to B. Harnett, Director, ITPID - OMB Comments on September 14, 2005 Preamble (3:46pm)","date":"2005-09-30"},{"doc_id":134489,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax from A. Fraas, OMB to B. Harnett, Director, ITPID Regarding Comments on September 14, 2005 Preamble (5:47pm)","date":"2005-09-30"},{"doc_id":134490,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax from A. Fraas, OMB to B. Harnett, Director, ITPID Regarding Comments on September 14, 2005 Preamble (10:47am)","date":"2005-09-30"},{"doc_id":134487,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"E-Mail from B. Harnett, Director, ITPID to A. Flynn and A. Fraas, OMB Submitting Informal Submittal to OMB - NSR - Utility Package - Preamble Dated June 15, 2005","date":"2005-10-04"},{"doc_id":134486,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax from A. Fraas, OMB to B. Harnett, Director, ITPID Regarding Comments on September 30, 2005 Preamble (11:32 am)","date":"2005-10-05"},{"doc_id":134484,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"E-Mail from J. McDonald, IIG, ITPID to A. Flynn and A. Fraas, OMB Transmitting October 6, 2006 Redline/Strikeout and Current Version of NSR EGU Preamble","date":"2005-10-06"},{"doc_id":134480,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Prevention of Significant Deterioration, Nonattainment New Source Review, and New Source Performance Standards:  Emissions Test for Electric Generating Units; Redline Strikeout; 10-13-2005","date":"2005-10-13"},{"doc_id":134479,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax from Janet McDonald, Information Transfer and Program Integration Division\r\n(ITPID), RTP to Art Fraas, OMB Regarding Edits to EGU Preamble","date":"2005-10-14"},{"doc_id":74826,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"DCN 10: Regulatory Impact Analyses for the 2006 NAAQS (National Ambient Air Quality Standards) for Particle Pollution","date":"2007-05-08"},{"doc_id":74843,"source":"ria","org":"EPA","doc_type":"regulatory_analysis","title":"DCN 09: Technical Support Document (TSD) for Multipollutant Regulatory Analysis: CAIR/CAMR/CAVR (Clean Air Interstate Rule/Clean Air Mercury Rule/Clean Air Visibility Rule) (USEPA promulgated rules, 2005)/Results","date":"2007-05-08"},{"doc_id":74854,"source":"ria","org":"EPA","doc_type":"regulatory_analysis","title":"DCN 09: Technical Support Document for Multipollutant Regulatory Analysis: CAIR/CAMR/CAVR (Clean Air Interstate Rule/Clean Air Mercury Rule/Clean Air Visibility Rule) (EPA promulgated rules, 2005)/Results ","date":"2007-05-08"},{"doc_id":133833,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Comments on the Supplemental Notice of Proposed Rulemaking) for PSD (Prevention of Significant Deterioration) and NA (Nonattainment) NSR (New Source Review):  Emission Increases for EGUs (Electric Generating Units (SNPR)  from OMB (Office of Management and Budget)","date":"2007-05-08"},{"doc_id":133834,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax Transmission of comments from Office of Management and Budget (OMB) to Janet McDonald on Electric Generating Units (EGU) Supplemental Federal Register Notice","date":"2007-05-08"},{"doc_id":133835,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax Transmission of comments on Electric Generating Units (EGU) Supplemental Package to Dave Svendsgaard of USEPA","date":"2007-05-08"},{"doc_id":133836,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax Transmission of OMB (Office of Management and Budget) comments to Janet McDonald of USEPA on EGU (Electric Generating Units) Supplemental Package","date":"2007-05-08"},{"doc_id":133837,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB submittal: TSD for PSD and NA NSR: Emissions Increase Test for EGUs","date":"2007-05-08"},{"doc_id":133838,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB Submittal: Supplemental Notice of Proposed Rulemaking (SNPR) for Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NA NSR): Emission Increases for Electric Generating Units (EGUs) Red-line Strike-out Comparing 3-6 to 3-15 Federal Register Notice (FRN)","date":"2007-05-08"},{"doc_id":133839,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax transmission to Janet McDonald from OMB/ Comments on draft Federal Register supplemental notice/ March 30, 2007","date":"2007-05-08"},{"doc_id":133840,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax Transmission of Comments on DRAFT Federal Register Notice (FRN) on March 30, 2007","date":"2007-05-08"},{"doc_id":133841,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax Transmission to Janet McDonald from OMB.  Transmits OMB comments on Technical Support Document.  4/10/2007.","date":"2007-05-08"},{"doc_id":133842,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB submittal:  Insert to Draft Supplemental FRN sent to OMB for review on 4/12/2007","date":"2007-05-08"},{"doc_id":133843,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Office of Management and Budget (OMB) Transmittal: Technical Support Document for Prevention of Significant Deterioration (PSD) And Nonattainment Area (NA) New Source Review (NSR): Emissions Increase Test for Electric Generating Units. Submitted to OMB on 4/16/2007","date":"2007-05-08"},{"doc_id":133844,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Office of Management and Budget (OMB) Submittal: Draft Supplemental Notice of Proposed Rulemaking for Prevention of Significant Deterioration and Nonattainment New Source Review: Emission Increases for Electric Generating Units. Submitted on 4-16-2007.  Has revised language on pg. 10.  ","date":"2007-05-08"},{"doc_id":133845,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Fax transmission from Office of Management and Budget (OMB) to Janet McDonald of the EPA. Comments from OMB. 4/16/2007","date":"2007-05-08"},{"doc_id":133846,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB (Office of Management and Budget) Submittal:  E-mail text transmission of Red-line Strike-out of Changes to the Supplemental FRN (Federal Register Notice) (excerpt pages 11-13).","date":"2007-05-08"},{"doc_id":133847,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB submittal/Draft Red-line/strike-out of 3-15-07 FRN (pgs 11-12).","date":"2007-05-08"},{"doc_id":133848,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB (Office of Management and Budget) Submittal - Supplemental Notice of Proposed Rulemaking for Prevention of Significant Deterioration and Nonattainment New Source Review: Emission Increases for Electric Generating Units","date":"2007-05-08"},{"doc_id":133849,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB submittal: Supplemental Notice of Proposed Rulemaking (SNPR) for Prevention of Significant Deterioration (PSD) and NA (Nonattainment) NSR (New Source Review): Emission Increases for Electric Generating Units","date":"2007-05-08"},{"doc_id":133850,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB Submittal: Supplemental Notice of Proposed Rulemaking (SNPR) for Prevention of Significant Deterioration (PSD) and Nonattainment (NA) New Source Review (NSR): Emissions Increases for Electric Generating Units (EGUs), red-line strike-out of changes sent to Office of Management and Budget (OMB) on 3-15-07","date":"2007-05-08"},{"doc_id":133851,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Supplemental Notice of Proposed Rulemaking (SNPR) for Prevention of Significant Deterioration (PSD) and Nonattainment (NA) New Source Review (NSR): Emission Increases for Electric Generating Units (EGUs) - sent to Office of Management and Budget (OMB) on 3-6-07 (March 6, 2007)","date":"2007-05-08"},{"doc_id":17358,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Supplemental Notice of Proposed Rulemaking for Prevention of Significant Deterioration and Nonattainment New Source Review: Emission Increases for Electric Generating Units","date":"2007-07-09"}],"references":[{"citation_id":155438,"raw_reference":"Regulatory Impact Analysis for the Final Clean Air Visibility Rule or the Guidelines for Best Available Retrofit Technology (BART) Determinations Under the Regional Haze Regulations. EPA-452/R-05-004. U.S. Environmental Protection Agency, June 2005.","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2005","cited_title":"Regulatory Impact Analysis for the Final Clean Air Visibility Rule or the Guidelines for Best Available Retrofit Technology (BART) Determinations Under the Regional Haze Regulations","cited_venue":"U.S. Environmental Protection Agency, EPA-452/R-05-004","cited_doi":null,"cited_url":"http://www.epa.gov/oar/visibility/actions.html","ref_kind":"government_report","section":"Section III.B, fn 16","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155439,"raw_reference":"U.S. EPA, Regulatory Impact Analysis for the CAIR at p. 7-5.","cited_authors":"U.S. EPA","cited_year":"2005","cited_title":"Regulatory Impact Analysis for the CAIR","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"http://www.epa.gov/air/interstateairquality/pdfs/finaltech08.pdf","ref_kind":"government_report","section":"Section III.B, fn 9","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155440,"raw_reference":"U.S. EPA NSR 90-Day Review Background Paper, p. 12.","cited_authors":"U.S. EPA","cited_year":null,"cited_title":"NSR 90-Day Review Background Paper","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section III.B, fn 14","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155441,"raw_reference":"Memorandum dated September 9, 1988, from Don R. Clay, Acting Assistant Administrator for Air & Radiation, U.S. EPA, to David A. Kee, Director, Air and Radiation Division, U.S. EPA Region V. Applicability of PSD and NSPS Requirements to the WEPCO Port Washington Life Extension Project.","cited_authors":"Don R. Clay","cited_year":"1988","cited_title":"Applicability of PSD and NSPS Requirements to the WEPCO Port Washington Life Extension Project","cited_venue":"U.S. EPA","cited_doi":null,"cited_url":"http://www.epa.gov/region7/programs/artd/air/nsr/nsrmemos/wpco2.pdf","ref_kind":"government_report","section":"Section IV.A","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155442,"raw_reference":"Issuance of Final Clean Air Act National Stack Testing Guidance, from Michael M. Stahl, Director, Office of Compliance, to Regional Compliance/Enforcement Division Directors, September 30, 2005, p. 14.","cited_authors":"Michael M. Stahl","cited_year":"2005","cited_title":"Issuance of Final Clean Air Act National Stack Testing Guidance","cited_venue":"U.S. EPA Office of Compliance","cited_doi":null,"cited_url":"http://www.epa.gov/Compliance/resources/policies/monitoring/caa/stacktesting.pdf","ref_kind":"government_report","section":"Section IV.B.1, fn 33","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155443,"raw_reference":"Information received from Mikhail Adamantiades, U.S. EPA, Clear Air Markets Division on October 4, 2005","cited_authors":"Mikhail Adamantiades","cited_year":"2005","cited_title":null,"cited_venue":"U.S. EPA Clear Air Markets Division","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section III.B, fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":155444,"raw_reference":"Modeled 1990 baseline emissions from John Robbins.","cited_authors":"John Robbins","cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"Section III.B, fn 20","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}