EPA/CAO/Maintenance audit report of WID [A-93-02-IV-A-5]
Other documents for the same rulemaking
References: 8 extracted, 0 linked to papers
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency's (EPA) Office of Radiation and Indoor Air (ORIA) conducted an audit ofthe Westinghouse Waste Isolation Division (WID) quality assurance program on February 17-19,1998. WID is located near Carlsbad, New Mexico at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), WID serves as the management and operations contractor to the DOE Carlsbad Area Office (CAO), which is responsible for the management ofthe WIPP. WID's responsibilities include the day-to-day management, operations, and maintenance of the WIPP. The purpose of the audit was to verify whether WID has maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. The audit was conducted under the authority of 40 CFR §194.22(e). The audit team determined that WID has executed a quality assurance program that implements the requirements of 40 CFR 194.22(a>, which includes, byreferen*3evthejequirements of ASME
NQA-1-1989 ediuon; ASME NQA-2a-1990addenoXp and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1). The audit team determined that WID has a properly-executed quality assurance program that implements the requirements of 40 CFR 194.22(aXl)» which includes*, by reference; therequirements of
EPA's ORIA conducted an audit of the WID quality assurance program in February 1997, with a follow-up visit to WID in June 1997. In the audit report dated August 1997, ORIA detennined that WID had properly executed a quality assurance program that implements therequirementsof 40 CFR 194.22(a). ORIA conducted a follow-up audit ofthe WID quality assurance program . from February 17-19,1998. The purpose ofthe follow-up audit was to verify that the WID has maintained a quality assurance program in accordance with 40 CFR 194.22(a)(1), which includes, by reference, therequirementsof ASME NQA-1-1989 edition; ASME NQA-2a-1990 addenda, ASME NQA-2.7-1989 edition; and ASME NQA-3-1989 edition [excluding Section 2.1(b) and (c), and Section 17.1].
Navarette, regarding notification of refresher training. February 2,1998. 123. Westinghouse Waste Isolation Division. WIPP Quality Assurance Inspector, Initial Qualification Card (example form), per QAI-01, Rev. 0. 124. , Westinghouse Waste Isolation Division; Exception Sheet for WWIS "Waste Container Data Report RP0360." No dster (Finding 2) -- 125. Westinghouse Waste Isolation Division. MemofromWaste Operations to Quality Assurance File, dated February 26,1998. Subject: Document Corrective Action from.
TRW/Equipment Management Center; Documents 17121 and 17122, Reports of Measurement (cahbration reports) for two invar rods. December 12,1996. 135. Westinghouse Waste Isolation Division. Purchase Order 77805, dated September 30, 1997. (Response to Observation l)r„. z r -^ ..;. 136. Westinghouse Waste Isolation Division. Source/Receipt Inspection Verification Sheet for . Purchase Order 77805..Complete Release on October 30,1997. (Ke^powe to Observation!) ^. 137. "G^odatisches.Institut, TecHnische Universitat Mtinchen.. Calibration reports for two invar rods, serial numbers LEICA-GPCL3 27957 and LEICA-GPCL3 27966 January 22, 1997. (Response to Observation 1) . 138. Westinghouse Waste Isolation Division. Purchase Requisition No. 76254. December 31, 1996. 139. Westinghouse Waste Isolation Division. Qualified Supplier List Request, Bechtel, San Francisco Office. Requested January 9,1997. Approved January 20,1997. 140. Westinghouse Waste Isolation Division. Audit Number E97-14(A), Quality Assurance Audit Checklist. Date of Audit: February 4-5,1997. Westinghouse Waste Isolation Division. Audit Number E97-14, WID Quality-Audit Checklist. Date of Audit: February 18,1997. 142. Westinghouse Waste Isolation Division. LetterfromM.W. Lipscomb, WID, to D. Krisha,
Bechtel, dated February 25, 1997. Subject: Transmittal of Audit Report E97-14A . ...^ .... . . ._ . ....- 143. Bechtel National, Inc. LetterfromD.T. Krisha, Bechtel, to M.W. Lipscomb, WID, dated March 21, 1997. Subject: Response to Audit Report E97-14A 144. Westinghouse Waste Isolation Division. LetterfromM.W. Lipscomb, WID, to D.T.
Bechtel, San Francisco. Effective dates: March 7,1997 to February 28, 2000. P.98
ATTACHMENT 4 REFERENCES 158. Westinghouse Waste Isolation Division. Purchase Order 78386, issued to Lift-Tech International. November 13,1997. 159. Westinghouse Waste Isolation Division.. Purchase Order 78386, Change Order 1.