Policy Replication

EEG Reports [A-93-02-II-A-42]

Docket document2020-08-18 · EPA · report · EPA-HQ-OAR-2002-0061-0436
RIN 2060-AG85, RIN 2060-AE30 · Docket EPA-HQ-OAR-2002-0061

Other documents for the same rulemaking

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1995-01-30 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1995-03-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive WastesProposed Rule
1995-08-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1996-02-09 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-01-21 Federal RegisterOpportunity To Present Oral Testimony on the DOE's Compliance Certification Application for the Waste Isolation Pilot Plant; Notice of Public Hearings
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1997-12-05 Federal RegisterOpportunity To Present Oral Testimony on EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's (WIPP) Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision;'' Notice of Public Hearings
1998-01-27 Federal RegisterOpportunity to Comment on EPA's Analysis of Air Drilling as it Relates to EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's (WIPP) Compliance with the 40 CFR Part 191 Disposal Regulations: Certification Decision''
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-01 Federal RegisterOpportunity To Present Oral Testimony on Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Notice of Public Hearings
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]

References: 1,049 extracted, 0 linked to papers

Page 13Download these results: CSV · JSON
EEG-3 Neill, Robert H., et al, (eds.) Radiological Health Review of the Draft Environmental Impact Statement (DOE/EIS-0026-D) Waste Isolation Pilot Plant. U. S. Department of Energy, August 1979.
journal articleNot linked to a paper · refsec
Wastes, November 1980. EEG-6 Geotechnical Considerations for Radiological Hazard Assessment of WIPP. A Report of a Meeting Held on January 17-18. 1980. April 1980.
research reportNot linked to a paper · refsec
EEG-7 Chaturvedi, Lokesh, WIPP Site and Vicinity Geological Field Trip. A Report of a Field Trip to the Proposed Waste Isolation Pilot Plant Project in Southeastern New Mexico, June 16 to 18, 1980. November 1980.
research reportNot linked to a paper · refsec
WIPP. September 1980. EEG-9 Spiegler, Peter, An Approach to Calculating Upper Bounds on Maximum Individual Doses From the Use of Contaminated Well Water Following a WIPP Repository Breach, September 1981.
research reportNot linked to a paper · refsec
EEG-11 Channell, James K., Calculated Radiation Doses From Radionuclides Brought to the Surface if Future Drilling Intercepts the WIPP Repository and Pressurized Brine, January 1982. (Continued on Back Cover) P.69
research reportNot linked to a paper · refsec
Albuquerque, New Mexico 87109 August 1983 P.70 Reprinted November 1990 This report was first published in August 1983 when the Environmental Evaluation Grot?) was part of "the New Mexico Health and Environment Department, Environmental Improvement Division. P.71
research reportNot linked to a paper · refsec
Projections, and Characteristics, D0E/NE-0017-1, October 1982. U. S. Department of Energy, Waste Isolation Pilot Plant Safety Analysis
research reportNot linked to a paper · refsec
Report, 5 vols. Neill, Robert H., Environmental Evaluation Group Director, Correspondence to Joseph M. McGough, U. S. Department of Energy WIPP Project Manager, November 10, 1982.
research reportNot linked to a paper · refsec
Neill, Robert H., Environmental Evaluation Group Director, Correspondence to Joseph M. McGough, U. S. Department of Energy WIPP Project Manager, March 18, 1983. U. S. Department of Energy, Preliminary
research reportNot linked to a paper · refsec
WIPP Transportation Analysis, WTSD-TME-002, April 1983. Environmental Evaluation Group, Partial Comments on U.S. Department
research reportNot linked to a paper · refsec
Energy, Preliminary WIPP Transportation Analysis, WTSD-TME-002, April 1983, May 1983. U. S. Department of Energy, DOE Response to the State of New Mexico'sComments on "Summary of the Results of the Evaluation of the WIPP Site and Preliminary Design Validation Program"
research reportNot linked to a paper · refsec
WIPP-DOE-161, WIPP-DOE-174, June 1983. 10. Environmental Evaluation Group, Response to DOE response to EEG comments on Department Energy, Preliminary
research reportNot linked to a paper · refsec
Energy, July 22, 1983. 11. Roberts, F. P., An Assessment of Radiation Effects in Defense Transuranic Waste Forms, PNL 3913, July 1981. 12. 'Zerwekh, Al, Gas Generation From Radiolytic Attack of TRU-Contaminated Hydrogenous Waste, LA-7674-MS, June 1979.
research reportNot linked to a paper · refsec
13. Molecke, Martin A., Gas Generation From Transuranic Waste Degradation., SAND 79-091IC, November 1979.
research reportNot linked to a paper · refsec
14. Molecke, Martin A., Gas Generation From Transuranic Waste Degradation: Interim Assessment, SAND 79-0117, 1979. 15. 10 Code of Federal Regulations, Part 71.42(b). (Also 49 Code of Federal
research reportNot linked to a paper · refsec
Regulations, Part 143.) 16. Jefferson, Robert M., ed., Program Materials Transportation Technology Strategy Document for the Nuclear Center (FY 80), SAND 80-0784, April P., Radiogenic Gas Accumulation in TRU Waste Storage Drums, 1980.
research reportNot linked to a paper · refsec
17. Ryan, John DP-1604, January 1982. 18. U. S. Department of Energy, Orders, DOE 5480.1 chg 3, Chapter III, "Safety Requirements for the Packaging of Fissile and Other Radioactive Materials," Section 7, Requirements, May 1, 1981. 19. Los Alamos National Laboratories, Alternative Transuranic Waste Management Strategies at Los Alamos National Laboratory, LA-8982-MS, September 1981. 20. Environmental Evaluation Group, Evaluation of the Suitability of the WIPP
research reportNot linked to a paper · refsec
Site, EEG-23, May 1983. 21. U. S. Department of Energy, TRU Waste Acceptance Criteria for the Waste Isolation Pilot Plant, Revision 1, September 1981. _P_,97 22. U. S. Department Energy, Alternatives Long-Term Management of Defense Transuranic Wastes at the Savannah River Plant
research reportNot linked to a paper · refsec
Carolina, DOE/SR-WM-79-1, July 1979. , Aiken, South P.98 The following page, explaining the method of calculating the Pu-239 equivalent
research reportNot linked to a paper · refsec
LIST OF FIGURES Page Fiqure 1 . Details of the stratigraphy of the Salado Formation showing the location of the marker beds, ore zones and WIPP r e p o s i t o r y Figure 2. Location of the WIPP s i t e and potash mines where gas blowouts have been documented Figure 3. Detailed layout of Area 169 at the Kerr-McGee mine where the gas blowouts of 12-13-1983 and 1•23*1984 occurred. The o r i e n t a t i o n of f r a c t u r e s is shown Figure 4 . The location of 12*13*1983 blowout showinq the c a v i t y (9 f t x 5 f t x 2.5 f t ) formed and the v e r t i c a l f r a c t u r e trending 122° in Room 1 , Area 169, Kerr-McGee mine Figure 5. Close up of the f r a c t u r e s at the location of 12*13-1983 gas blowout in area 160 of the Kerr-McGee mine Figure 6. Fracture aligned 122° (N58°W, S88°E) in the back ( c e i l i n g ) of the 12*13*1983 gas blowout in the Kerr-McGee mine. Picture looking
research reportNot linked to a paper · refsec
SE in Room 1 , Area 169 Figure 7. Vertical f r a c t u r e , trending 125° (N65°W - S65°E) l a t e r a l l y displaced along a clay seam at the l o c a t i o n of 12»19«1983 gas blowout in area 160 of the Kerr-McGee mine Figure 8. A continuous mining machine w i t h a p r o t e c t i v e metal g r a t i n g t o protect the operator from debris r e s u l t i n g from a p o t e n t i a l gas
research reportNot linked to a paper · refsec
Cavanauqh, J. E. and J. Davidson, 1983, Gas Outburst Investigation, Kerr-McGee Potash Mine, U.S. Mine Safety and Health Administration Report, 4 p. +5 Fiq. (App. A ) .
research reportNot linked to a paper · refsec
Coward, H. F. and G. W. Jones, 1952, Limits of Inflammability of Gas and
research reportNot linked to a paper · refsec
Ellickson, M. L., 1976, Ground Control Investigation, Nash Draw Potash
research reportNot linked to a paper · refsec
Griswold, George B., 1977, Site Selection and Evaluation Studies of the Waste Isolation Pilot Plant (WIPP), Los Medanos, Eddy County, NM, SAND 77-0946, 48 p. + Figs.
research reportNot linked to a paper · refsec
Jones, C. L., 1973, Salt Deposits of Los Medanos Area, Eddy and Lea
research reportNot linked to a paper · refsec
Jones, C. L., C. G. Bowles and K. G. Bell, 1960, Experimental Drill Hole Logginq in Potash Deposits of the Carlsbad District, N. M., II. S. Geol. Surv. Open-file Report, 60-84.
research reportNot linked to a paper · refsec
Kirk, S. R., 1973, Report of Inspection, Eddy Mine (National Potash Co.), N. M. Inspector of Mines Dept. Report dated 12/20/73, 3 p. (App. C ) .
research reportNot linked to a paper · refsec
Kirk, S. R., 1974, Report of Inspection, Eddy Mine (National Potash C o . ) , N.M. Inspector of Mines Dept. Report dated 2/25/74, 3 p. (App. C ) .
research reportNot linked to a paper · refsec
Kirk, S. R., 1974, Report of Inspection, Eddy Mine (National Potash Co.), N.M. Inspector of Mines Dept. Report dated 4/1/74, 2 p. (App. C ) .
research reportNot linked to a paper · refsec
10. Powers, D. W., et al, 1978, Geoloqical Characterization Report, Waste Isolation Pilot Plant (WIPP) Site, SE New Mexico, SAND 78-1596, 2 vol. P.39 3. Continue the practice of d r i l l i n g advance exploratory holes before c u t t i n g a face with the continuous mining machines. These holes should be d r i l l e d slanted upwards to intersect the clay layer near the c e i l i n g . 4 . I n s t a l l protective metal grating on the continuous mining machines s i m i l a r or better than the ones i n s t a l l e d at the Kerr-McGee mine. 5. Check the mining machines f o r any loose parts which may get removed and f l y about in the event of an explosion. prevent t h i s Remove or r e - i n s t a l l such parts to possibility. 6. Establish procedures to not allow any unnecessary personnel near an operating mining machine. P.40
research reportNot linked to a paper · refsec
Denver, Colorado 80225 P.42 SUMMARY In response to a request for assistance from the Dallas, Texas, MSHA, M&NMS&H, Subdistrict Office, two members of the Safety and Health Technology Center (S&HTC), Ground Support Division traveled to the Kerr McGee Potash Mine near Carlsbad, New Mexico, to investigate a large gas outburst that occurred in this potash mine on December 13, 1983. The outburst resulted in fatal injuries to a continuous miner operator, and less severe injuries to a shuttle car operator. As a result of this investigation it is reoatnended that steps be taken to locate and to relieve the high pressure gassy regions in advance of mining and that mining procedures and mining equipment be modified to protect mining personnel from high pressure gas outbursts and associated fly rock and debris.
research reportNot linked to a paper · refsec
GENERAL INFORMATION The Kerr McGee Chemical Corporation, Hobbs Potash Facility, was located 30 miles east of Carlsbad, New Mexico, south off of Highway 62-180. The product being mined was potash from the 1600 level of the underground roomand-pillar mine. Electric continuous mining machines with shuttle cars were used to mine the 6-foot high by 27-foot wide rooms in the herring bone-pattern development entries. These entries were used for ventilation, service and haulage during development advance mining and would continue to be used for these functions during subsequent retreat production mining from adjacent production panels. Very little ground support had been required in the working sections of this mine. However, when bad ground conditions are encountered, such as the open brow left after this gas outburst, rock bolts are used to stabilize the potentially loose ground. On December 13, 1983, at 4:27 a.m. a large gas outburst occurred on the 1600 level of the Kerr McGee Mine which resulted in the death of one miner and the injury of another. The following individuals participated in the investigation of the area where the fatal gas outburst occurred. Kerr McGee Corporation Walter Case, Facility Manager Melvin Pyiatt, Underground Superintendent Raymond Nations, Safety Director
research reportNot linked to a paper · refsec
OBSERVATIONS The investigation party assembled at the facility safety offioe on the morning of December 14, 1983. After necessary administration and preparation, the group decended into the mine on the man cage and was driven to the accident scene on man-cars by company officials. Figure 1 is a schematic of Area 169. The accident location is shewn on Figure 1 in Room 1 about halfway between x-cut 1 and x-cut 3. The blowout occurred on the outby side of a block of ore which extended in Room 1 approximately 42 feet to the mined-out dead end heading of x-cut 3. Reportedly no indication of high pressure gas had been encountered while mining in that crosscut. The gas outburst occurred in the upper right side of the indented working face. Figures 2, thru 5 contain photos showing the cavity resulting frcm the outburst and the vertically-extending gas fissure within this cavity. Also shewn is the continuous miner that had been operated by the victim and seme of the large slabs of potash and rock salt that had been ejected from this outburst area. The operator of the continuous miner was apparently killed as a result of being struck by a light fixture which had been torn loose from the continuous miner and hurled back into the victim's face. The shuttle car operator standing near his machine behind the continuous miner was injured by flying potash and rock salt, but was reported in stable condition at the time of the investigation.
research reportNot linked to a paper · refsec
Barr, G. E., W. B. Miller, and D. D. Gonzalez, 1983, Interim Report on the Modeling of the Regional Hydraulics of the Rustler Formation: Sandia National
research reportNot linked to a paper · refsec
Laboratories, Report SAND 83-0391. Department of Energy, 1980, Final Environmental Impact Statement — Waste Isolation Pilot Plant: United States Department of Energy, 2 volumes.
research reportNot linked to a paper · refsec
Duguid, I. 0. and others, 1980, Panel Discussion: in Wang, J. S. Y., ed., Proceedings of a Workshop on Numerical Modeling of Thermohydrological Flow in Fractured Rock Masses, Lawrence Berkley Laboratory, Report LBL-11566, 125 p.
journal articleNot linked to a paper · refsec
Gibbons, J. F., and C. C. Ferrall, 1980, Fracture Model of Rustler Formation at the WTPP Site: unpublished CSI report.
research reportNot linked to a paper · refsec
Gonzales, D. D., 1983, Groundwater Flow in the Rustler Formation, Waste Isolation Pilot Plant (WIPP), southeast New Mexico (SEM): Interim Report: Sandia National Laboratories, Report SAND 82-1012, 39 p.
research reportNot linked to a paper · refsec
Greenfield, M. A., 1979, Simple Model for Estimating Maximum Radionuclide Concentrations in the Pecos River, and Associated Ingestion Doses, Due to the Release of Radioactivity from the WIPP Repository: Appendix VI jLn_ Neill, R. H., J. K. Channell, C. Wofsy, and M. A. Greenfield, eds., Radiological Health Review of the Draft Environmental Impact Statement (DOE/EIS-0026-D) Waste Isolation Pilot Plant, U. S. Department of Energy, Environmental Evaluation
journal articleNot linked to a paper · refsec
Group, Report EEG-3. Hantush, M. S., 1966, Analysis of Data from Pumping Tests in Anisotropic Aquifers: Journal of Geophysical Research, vol. 71, no. 2, p. 421-426.
journal articleNot linked to a paper · refsec
Hantush, M. S., and R. G. Thomas, 1966, A Method for Analyzing a Drawdown Test in Anisotropic Aquifers: Water Resources Research, vol. 2, no. 2, p. 281-285.
research reportNot linked to a paper · refsec
Mercer, J. W. and B. 0. Orr, 1979, Interim Data Report on the Geohydrology of the Proposed Waste Isolation Pilot Plant Site, Southeast New Mexico: U. S. Geological Survey Water-Resources Investigations Report 79-98, 178 p. -37- P.32
research reportNot linked to a paper · refsec
Papadopulos, I. S., 1965, Nonsteady Flow to a well in an Infinite Anisotropic Aquifer: International Association of Scientific Hydrology, Symposium of
research reportNot linked to a paper · refsec
Dubrovnik, vol. 1, p. 21-31. Ramey H. J. Jr.,1 1975, Interference Analysis for Anistropic Formations - A Case History: Journal of Petroleum Technology, p. 1290 -1298.
journal articleNot linked to a paper · refsec
Sandia, 1979, Basic Data Report for Drillhole WIPP-26 (Waste Isolation Pilot Plant-WIPP): Sandia National Laboratories, Report SAND 79-0280.
research reportNot linked to a paper · refsec
Sandia, 1979, Basic Data Report for Drillhole WIPP-29 (Waste Isolation Pilot Plant-WIPP): Sandia National Laboratories, Report SAND 79-0283.
research reportNot linked to a paper · refsec
Sandia, 1980, Basic Data Report for Drillhole WIPP-19 (Waste Isolation Pilot Plant-WIPP): Sandia National Laboratories, Report SAND 79-0276.
research reportNot linked to a paper · refsec
Sandia, 1980, Basic Data Report for Drillhole WIPP-30 (Wste Isolation Pilot Plant-WIPP): Sandia National Laboratories, Report SAND 79-0284.
research reportNot linked to a paper · refsec
Sandia, 1981, Basic Data Report for Drillhole WIPP-34 (Waste Isolation Pilot Plant-WIPP): Sandia National Laboratories, Report SAND 81-2643.
research reportNot linked to a paper · refsec
← PreviousNext →