Technical Support Document for Section 194.23: Parameter Justification Report [A-93-02-V-B-14]
Other documents for the same rulemaking
References: 34 extracted, 0 linked to papers
DOE in March 1997. This report identifies those parameters, presents the basis for their original selection, and describes the subsequent evaluations that were performed to identify the parameters of primary concern for regulatory compliance. Background and Scope This report is one of a series of three reports that provide detailed documentation of EPA's technical review ofthe CCA and the methodology used by the Agency to evaluate DOE compliance with the requirements of 40 CFR 194.23(c)(4). These three reports are briefly described in the following paragraphs. The first report, Technical Support Document for Section 194.23 - Parameter Report (PR) [Docket A-93-02, Item V-B-12], describes EPA's detailed review ofthe DOE's supporting documentation and technical rationale for the parameters used in the PA model. The report describes the screening process used by the Agency to identify those parameters that were poorly documented, that had a weak technical basis, and that may be important in determining compliance. This screening occurred in several steps and culminated in identifying a series of parameters that warranted further review. Those parameters are listed Tables ES-1, ES-2, and
However, additional parameters or groups of parameters were added to the analysis based on the initial results ofthe Agency's sensitivity studies and on concerns for specific parameters and processes expressed during EPA's public hearings and in public written comments. This third report, Technical Support Document for Section 194.23 - Parameter Justification Report [Docket A-93-02, Item V-B-14], is referred to as the Justification Report (JR). It describes the disposition ofthe inadequately supported parameters described in the Agency's letter of March'19, 1997 (Trovato 1997A). This disposition was based on the results ofthe Agency's sensitivity analysis, additional supporting information provided by the DOE, and further analysis by the Agency. Parameters were removed from the list by the Agency if, for example, PA performance measures were found to be insensitive to them, if the additional DOE supporting P.19 information was found to be adequate, or if upon further review the Agency determined that
DOE's existing supporting rationale was acceptable. The disposition of these parameters was described to DOE in the Agency's letters of 17 April 1997 (Trovato 1997B) and 25 April 1997 (Trovato 1997C). Parameters that were not removed from the list were used in developing a revised data base of parameters of major concern to the Agency for use in the EPA-mandated Performance Assessment Verification Test (PAVT). The rationale supporting development of this revised data base is presented in this report. The PAVT is designed to provide a comprehensive test ofthe effects of changes in significant, uncertain parameters and changes in other aspects ofthe CCA
PA computer codes on the PA compliance calculations presented by DOE in the CCA. Report Structure This report is divided into six sections. Following this introduction, an overview ofthe parameter selection process is presented in Section 2. This overview describes the Agency's review of parameter documentation, the screening process, and the sensitivity analysis process that were used to disposition the inadequately supported parameters. Sections 3,4, and 5 present detailed discussions ofthe inadequately supported parameters listed in Enclosures 2, 3, and 4, respectively, ofthe Agency's aforementioned letter of March 19, 1997 (Trovato 1997 A). Finally, Section 6 presents a summary ofthe results ofthe Agency's analysis of those parameters. P.20
PARAMETER SELECTION PROCESS Parameter Selection The parameters identified to DOE as being inadequately supported were the result of a screening process described in the Parameter Report (1998). In overview, this process began with a detailed
SNL/DOE reports to begin an evaluation of parameter importance. This effort proceeded as a process of iterative sifting ofthe original CCA PA parameter database to identify those parameters deemed important to the performance ofthe WIPP. The initial review involved nearly 1600 parameters. Of these, about 465 parameters were found to be worthy of a more detailed evaluation. These 465 parameters were given additional screening for importance and uncertainty, and about 150 were considered to have potential impact on performance. These 150 parameters were further reviewed and about 60 parameters were identified for inclusion in EPA's March 19, 1997 letter (Trovato 1997A). Those parameters were grouped by type of deficiency and are listed in Table 2.1-1. Parameter Review In the Agency's letter of March 19, 1997 (Trovato 1997A) the DOE was told that the issues described included EPA's outstanding concerns with the CCA and was requested to resolve those concerns. DOE responded by providing additional documentation and rationale which the Agency found helpful in evaluating many ofthe parameters. Additional information on many ofthe parameters was developed through technical reviews by the Agency and was also used to help in the evaluation process. Details of this additional documentation and rationale and the decisions they supported are presented in the parameter-by-parameter discussions in Sections 3 through 5 of this report.
Beauheim, R.L., W.R. Wawersik, and R.M. Roberts 1993. "Coupled Permeability and Hydrofracture Tests to Assess the Waste-Containment Properties of Fractured Anhydrite," Int. J. Rock Mech. Mineral Science and Geomechanics Abstracts, Vol. 30, pp. 1159-1163.
Beauheim, R.L., S.M. Howarth, P. Vaughn, S.W. Webb, and K.W. Larson 1994. Integrated Modeling and Experimental Programs to Predict Brine and Gas Flow at the Waste Isolation Plant. Report SAND94-0599C, Sandia National Laboratories, Albuquerque, New Mexico.
Boak, D.M., L. Dotson, R. Aguilar, D.W. Powers, and G. Newman 1996. Wellbore Enlargement Investigation: Potential Analogs to the Waste Isolation Pilot Plant During Intrusion of the Repository. Report S AND96-2629, Sandia National Laboratories, Albuquerque, New Mexico.
CCA (DOE Carlsbad Area Office) 1996. Title 40 CFR Part 191, Compliance Certification Application for the Waste Isolation Pilot Plant. Report DOE/CAO-1996-2184, U.S. Department of Energy Waste Isolation Pilot Plant, Carlsbad Area Office, Carlsbad, New
Mexico, October. Docket A-93-02, II-G-1. Christensen, C.L., and T.O. Hunter 1980. The Bell Canyon Test Results. Report SAND802414C, Sandia National Laboratory, Albuquerque, New Mexico, November.
EPA 1998a, Technical Support Document for Section 194.24: WIPP Facility and Waste
EPA 1998b, Technical Support Document for Section 194.14: Assessment of Kds used in the
CCA, Docket A-93-02, Item V-B-4. EPA 1998c, Technical Support Document for Section 194.24: EPA's Evaluation of DOE's Actinide Source Term, Docket A-93-02, Item V-B-17.
EPA 1998d, Technical Support Document for Section 194.23: Models and Computer Codes, Docket A-93-02, Item V-B-6.
DOE Carlsbad Area Office 1997. Expert Elicitation on WIPP Waste Particle Diameter Size Distribution(s) During the 10,000-Year Regulatory Post-Closure Period, Draft. Prepared by the Oarlsbad Area Office Technical Assistance Contractor for the U.S. Department of Energy Carlsbad Area Office, Carlsbad, New Mexico, May 12. Docket A-93-02, II-I-30.
Freeze, R.A., and J.A. Cherry 1979. Groundwater. Prentice-Hall Inc., Englewood Cliffs, New Jersey. Docket A-93-02, Reference #257. P.80
Freeze, G.A., K.W. Larson, and P.B. Davies 1995. Coupled Multi-Phase Flow and Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP). Report SAND93-1986, Sandia National Laboratories, Albuquerque, New Mexico. Docket A-93-02, Reference #261.
Kruger, M. 1997. Performance Assessment Parameters Values Identified in EPA Letters, Dated April 17 and 25, 1997, to DOE. U.S. Environmental Protection Agency, Office of Radiation and Indoor Air, Washington, D.C, June 6. Docket A-93-02, II-I-25 (April 17);
II-I-27 (April 25). Novak, C.F., R.C. Moore, and R.V. Bynum 1996. Prediction of Dissolved Actinide Concentrations in Concentrated Electrolyte Solutions: A Conceptual Model and Model Results for the Waste Isolation Pilot Plant (WIPP). Proceedings ofthe 1996 International Conference on Deep Geological Disposal of Radioactive Waste, Canadian Nuclear
Larson, K., R. Beauheim, and W. Weart 1997. Experimental Data and BRAGFLO Fracture Model Parameter Values. Memorandum to Les Shephard, March 31, 1997, in letter from
Carlsbad, New Mexico, April 15,1997. Docket A-93-02, II-I-24, Comment #9.
Lenke, L.R., J.W. Berglund, and R.A. Cole 1996. Blowout Experiments Using Fine Grained Silica Sands in an Axisymmetric Geometry. Report NMERI 1996/7/32250, New Mexico Engineering Research Institute, University of New Mexico,. Albuquerque, New Mexico, March. Docket A-93-02, Reference #396.
Parthenaides, E., and R.E. Paaswell 1970. Erodibility of Channels with Cohesive Boundary. J. Hydraulics Division, Proceedings, American Society of Civil Engineers, Vol. 96, pp. 755-771, March. Docket A-93-02, Reference #502.
PR (Parameter Report) 1997. Technical Support Document for Section 194.23, Parameter Report. Prepared by TechLaw, Inc.,Lakewood, Colorado, for U.S. Environmental Protection Agency, Office of Radiation and Indoor Air, Washington, D.C, August. Docket A-93-02, II-I-12.
Ross-Brown, D., J. Gibbons, D. Porter, and J. Schatz 1996. Final Waste Isolation Pilot Plant Engineered Systems Data Qualification Supplementary Peer Review Report. Prepared for U.S. Department of Energy, Carlsbad Area Office, Office of Regulatory Compliance,
Carlsbad, New Mexico, December. SA Report 1997. Technical Support Document for Section 194.23, Sensitivity Analysis Report. Prepared by TechLaw, Inc.,Lakewood , Colorado, for U.S. Environmental Protection
II-I-13. P.81 Simon D.B. and F. Senturk 1992. Sediment Transport Technology: Water and Sediment
SNL 1992. Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992, Volume 3: Model Parameters. Report SAND92-0700/3, Sandia National
Laboratories, Albuquerque, New Mexico, December. Docket A-93-02, Reference #563. U.S. Environemental Protection Agency, 1997b. Technical Support Document for Section 194.14: Assessment ofKjs used in the CCA. Prepared by TechLaw, Inc., Lakewood,
Telander, M.R., and R.E. Westerman 1995. Hydrogen Generation by Metal Corrosion in Simulated Waste Isolation Pilot Plant Environments, Progress Report for the Period November 1989 through December 1992. Report SAND92-7347, Sandia National
Telander, M.R., and R.E. Westerman 1997. Hydrogen Generation by Metal Corrosion in Simulated Waste Isolation Pilot Plant Environments, Report SAND96-2538, Sandia National Laboratories, Albuquerque, New Mexico. The Earth Technology Corporation 1988. Final Report for Time Domain Electromagnetic (TDEM) Surveys at the WIPP Site. Report SAND87-7144, prepared by The Earth Technology Corporation, Golden, Colorado, for Sandia National Laboratories,
USBR 1987. Design of Small Dams. Third Edition, U.S. Bureau of Reclamation, Denver, Colorado.
Contractor, Carlsbad, New Mexico, December 1995. Docket A-93-02, II-G-1, Volumes