Ltr. to G. Dials re: Comments on the preliminary performance assessment [A-93-02-II-C-10]
Other documents for the same rulemaking
References: 20 extracted, 0 linked to papers
Energy, 1983. HE 93 Helton, Jon C, "Uncertainty and Sensitivity Analysis Techniques for Use. in Performance Assessment for Radioactive Waste Disposal," Reliability Engineering and System Safety, Vol. 42, 1993. Hunter 85 "A Regional Water Balance for the Waste Isolation Pilot Plant (WIPP) Site and Surrounding Area," SAND84-2233, R.L. Hunter, Sandia National Laboratories, 1985.
IM 82 Iman, Ronald L., and Conover, W. J., "A Distribution-Free Approach to Inducing Rank Correlation Among Input Variables," Communications in Statistics B , Vol. 11 1982.
Laboratories, 1985. Jones 92 "Integration of Interpretation Results of Tracer Tests Performed in the Culebra Dolomite at the Waste Isolation Pilot Plant Site," SAND92-1579, T.L. Jones, et al.,
Sandia National Laboratories, 1992. LaVen 90
LaVenue, A.M., Cauffmah, T.L., and Pickens, J.F., "Ground-Water Flow Modeling of the Culebra Dolomite, Volume 1, Model Calibration," Sandia National Laboratories, SAND89-7068, 1990. LaVen 90b
LaVenue, A.M., A. Haug, and V. A. Kelley. 1990. Numerical Simulation of GroundWater Flow in the Culebra Dolomite. Second Interim Report. SAND88-7002.
Technical, New York, NY, 1990. P.53 MO 90
Morgan, M. Granger, and Henrion, Max, Uncertainty - A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis. Cambridge University Press, New York, NY, 1990.
Galson, 4th October 1993. PA 90 Palisade Corp., Risk Analysis and Modeling: @Risk. Palisade Corp., Newfield, NY, 1990.
RA 73 Rao, C. Radhakrishna, Linear Statistical Inference and Its Applications, 2nd Edition. John Wiley and Sons, New York, NY, 1973.
Plant, December 1990," SAND 90-2347, C.G. Bertram Howery, et al., Sandia National
Plant, December 1991,",SAND 91-0893 (3 Volumes), Sandia National Laboratories, December 1991.
SAND 92b "Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December .1992 - Volume 2: Technical Basis," SAND92-0700/2, Sandia National Laboratories, December 1992.
SAND 92c "Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992- Volume 3: Model Parameters," SAND92-0700/3, Sandia National Laboratories, December 1992.
SAND 93b "Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992 - Volume 5: Uncertainty and Sensitivity Analyses of Gas and Brine Migration for Undisturbed Performance," SAND92-0700/5, Sandia National Laboratories, August. 1993. P.54 Swift 92 ^Swift, P.N., Long-Term Climate Variability at the Waste Isolation Pilot Plant. Southeastern New Mexico. USA. Sandia National Laboratories. SAND91-7055. 1992. Swift 94
Swift, P.N., B.L. Baker, K Economy, J.W. Garner, J.C. Helton, and D.K. Riideen, Incorporating Long-Term Climate Change in Performance Assessment for the Waste Isolation Pilot Plant. Sandia National Laboratories. SAND93-2266, 1994. . ';
TH 72 Thomas, George B., Calculus and Analytic Geometry, Alternate Edition. AddisonWesley Publishing Co., Reading, MA, 1972. Weart 92
Pasztor, Background Information Presented to the Expert Panel on Inadvertent Human / Intrusion into the Waste Isolation Pilot Plant. Sandia National Laboratories. SAND910928, 1991. P.55 Attachment
OFFICE OF SOLID WASTE RCRA RELATED SPECIFIC COMMENTS ON THE DECEMBER 1992
RCRA-based risk assessment could be performed (using model results) to assess the risk to the public from RCRA-hazardous constituents. Such an assessment, although not required (but of the type requested by the NAS WIPP Panel), would provide additional support to the NMVP. The undisturbed PA scenario to date does not address potentially critical issues such as the impact of anhydrite fracturing, room closure, gas transport, impact.of nearby mining, and the lower shaft seal threshold permeability. These issues need to be modelled and analyzed, not only in a segmented fashion, but also in an interrelated fashion concurrent with "worst-case" gas generation scenarios. For example, the undisturbed scenario is constructed in such a way that it does not evaluate the potential for any mining activity occurring at or near the Land Withdrawal Act (LWA) Boundary. Such mining might impact WIPP (within 10,000 years) while not physically intruding into it. Discussion of the RETSOF commercial salt mine (discussed in detail in the technical comments) suggests how severe the impact could be. The following sections discuss in more detail specific technical issues that ,have arisen during review of the 1992 Performance Assessment. The discussion is organized around the following issues: P.56 Technical Comments Mining Scenarios