DOE/CAO Contractor Report. Performance Demonstration Program for Nondestructive Assay tor the TRU Waste Characterization Program - Scoring Report - November 1996 Distribution- Prepared by Lockheed Idaho Technologies Co. [A-93-02-II-A-35]
Other documents for the same rulemaking
References: 9 extracted, 0 linked to papers
LIST OF FIGURES Figure 1 Figure 2 Figure 3 Figure 4 Design of PDP standard assemblies Assembly configuration of the noninterfering matrix (ethafoam) drum Assembly configuration of the simulated combustibles matrix drum Fully assembled NDA PDP sample Performance Demonstration Program For Nondestructive Assay for the TRU Waste Characterization Program Scoring Report - November 1996 Distribution
INTRODUCTION This report describes the results of cycle 2 ofthe nondestructive assay (NDA) portion of the Performance Demonstration Program (PDP) for transuranic (TRU) waste characterization for the Waste Isolation Pilot Plant (WIPP). The PDP was conducted according to the document Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program (DOE 1995a). This document is referred ' to throughout this, report as the PDP Plan. Under this plan, blind audit samples (hereinafter referred to as PDP samples) are used as an independent means to assess the performance of measurement groups regarding compliance with the established Quality Assurance Objectives (QAOs). As defined for the NDA PDP, a PDP sample consists of a 55-gallon standard drum including fabricated matrix inserts and a defined set of standards at specific locations. The
PDP sample components are stored at each participating measurement facility under secure conditions to protect them from loss, tampering, or accidental damage. The cycle 2 test consisted of blind measurements of two drums, one containing a noninterfering matrix and one containing a simulated combustibles matrix, each containing a known quantity of plutonium. Six facilities participated in cycle 2. Each is identified in this report by a two letter . identification code. The combinations of drums and standards were assembled onsite and the tests v/ere scheduled to begin on November 4, 1996. The actual start dates for cycle 2 varied between November 4 and December 5, 1996. The date spread was caused when several facilities were either not prepared to begin on November 4 or had instrument problems which delayed measurements. All data were returned to the PDP Coordinator by December 23, •, 1996.
BACKGROUND The Performance Demonstration Programs (PDPs) are designed to help ensure compliance with the QAOs identified in the Transuranic Waste Characterization Quality Assurance Program Plan for the Waste Isolation Pilot Plant (QAPP)(DOE 1995b). The PDPs are intended for use by the Carlsbad Area Office (CAO) as part of the assessment and approval process for the measurement facilities supplying services for the characterization of WIPP
DOE. 1995a. Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program. DOE/CAO-94-1045 .Revision 0. March 1995. Carlsbad, New
DOE. 1995b. Transuranic Waste Characterization Quality Assurance Program Plan. DOE/CAO94-1010. Revision 0, April 1995, Carlsbad,.New Mexico, Carlsbad Area Office, U.S. Department of Energy.
INEL. 1996a. Design of Phase I Radioactive Working Reference Materials for the Nondestructive Assay Performance Demonstration Program for the National TRU Program,
INEL-96/0245. July 1996, Idaho Falls, Idaho, Lockheed Idaho Technologies Company.
INEL. 1996b. Design of Matrix Drums for the Nondestructive Assay Performance Demonstration Program for the National TRU Program, INEL-96/0129. July 1996, Idaho Falls, Idaho, Lockheed Idaho Technologies Company.