SNL/DOE CCA PA Approach: SNL/DOE estimated the borehole plug permeability through direct measurement ofthe permeability ofa concrete borehole plug at the WIPP Site (Christensen and Hunter 1980 Figure 4). This parameter was considered to have a low uncertainty and was treated as a constant in the CCA (see WPO #41131 p. 12 and CCA Vol. X Appendix MASS Attachment 16-3 p. 13). The same value was assigned to each ofthe three directional permeabilities required by the PA model. This constant permeability is shown as the baseline value in Table PD-1.6-1. Table PD-1.6-1. Sensitivity Input Values: Borehole Plug Permeability Material ID - Parameter ID Low Value Baseline High Value Borehole Plug Permeability (m2) IxlO"18 5 x IO"17 IxlO' 11 CONC_PLUG - PRMX_LOG - PRMY_LOG - PRMZLOG -18.0 -18.0 -16.3 -16.3 -11.0 -11.0 -18.0 -16.3 -11.0
EPA Review: The low, baseline, and high values of borehole plug permeability used in the EPA sensitivity analysis are shown in Table PD-1.6-1. The baseline value is equal to the constant permeability used by SNL/DOE in the CCA. The high value was determined by the Agency based on the high end ofthe range of degraded plug permeabilities estimated by SNL/DOE (see WPO #41131 p. 14). The low value is the lowest value measured for the aforementioned WIPP borehole plug grout in laboratory tests (Christensen and Hunter 1980 p. 4) These values are considered by the Agency to be adequate for the purposes of sensitivity analysis. Files used to evaluate Borehole Plug Permeability: (See Appendix BF) Unique Id: "conc_plug_perm" Evaluation Script: EPA CMS; libepa_eval: Fetch; CFE eval_bf_conc_plug_perm_hi.inp
PD - 7 P.46 References: WPO #41131 CCA Vol.X Appendix MASS Attachment 16-3 Christensen and Hunter 1980
PD - 9 P.48 An evaluation ofthe sensitivity to Castile brine pocket volume was begun by determining changes in BRAGFLO performance measures over the range of volumes used by SNL/DOE in the CCA. In its initial review, the Agency identified Parameter ID Number 2918, CASTILER, VOLUME for this purpose. However, as noted in Enclosure 3 ofthe Agency's March 19, 1997 letter (Trovato 1997A), this parameter is no longer used in the PA calculations to establish the volume ofthe Castile brine pocket. In the CCA PA calculations, SNL/DOE used a sampled probabilistic parameter called GRIDFLO to determine this volume from a predetermined range. The calculational approach used by SNL/DOE is described below.
SNL 1992 p.2-69 Sensitivity Analysis - Parameter Descriptions
SNL/DOE CCA PA Approach: As explained in Section PD-2.2, direct brine releases are assumed by SNL/DOE to occur over a maximum of 11 days before they are brought under control. This time period is based on the time that was required to control the South Culebra Bluff Unit 1 well in January 1978 (see WPO # 40520 p. 189 and WPO #43672 p. 10) and is shown as the baseline value in Table PD-2.3-1. Table PD-2.3-1. Sensitivity Input Values: Maximum Period of Uncontrolled Borehole Flow Material ID - Parameter ID Low Value Baseline High Value
WPO #35695 Lenke et al. 1996 PD-3.6 Particle Cementation Strength The particle cementation strength is the third ofthe three parameters discussed in Section PD-3.5 that are identified by SNL/DOE to resist erosion during a spallings event. The sensitivity to the cementation strength was analyzed by comparing changes in CUTTINGS_S performance measures with baseline results for high and low values for this parameter. Sensitivity Analysis - Parameter Descriptions
EPA Review: The baseline and high values ofthe particle cementation strength used in the EPA sensitivity analysis are shown in Table PD-3.5-1. This parameter had been previously reviewed by the Engineered Systems Peer Review Panel which identified a potential range of near zero to 700 psi for the tensile strength of degraded waste and recommended treating this parameter as a sampled variable because of its uncertainty (see Ross-Brown et al. 1996 p. 16). Because the value used in the CCA was near the low end ofthis range, the Agency's objective in this sensitivity analysis was to determine the effect of larger values for this parameter. A low value was therefore not provided, and the high value was set at 700 psi (4.8265 x IO6 Pa). The Agency considers these values to be adequate for checking the sensitivity ofthe PA model to this parameter. Files used to evaluate Paricle Cementation Factor: (See Appendix CUSP) Unique Id: "cement" Evaluation Script: EPA CMS; libepa_eval: Fetch; CFE eval_cusp_cement_hi.inp
CFE cusp_cement_lo.inp References: WPO #38241 : Ross-Brown et al. 1996 Sensitivity Analysis - Parameter Descriptions
SNL/DOE CCA PA Approach: SNL/DOE estimated a probability of 8% that a randomly placed exploration borehole would encounter a Castile brine pocket at the WIPP Site. This probability was based on the results ofa geostatistical analysis of reported brine pocket encounters in the vicinity ofthe site (see WPO # 40199). Additional information from the results of time domain electromagnetic (TDEM) geophysical surveys at the Site were used qualitatively to indicate the potential presence of brine under the Site (The Earth Technology Corporation 1988). Although the accuracy ofthis estimated probability is uncertain, it was treated by SNL/DOE as a constant in the CCA and is shown as the baseline value in Table PD-5.1-1. Table PD-5.1-1. Sensitivity Input Values: Probability of Encountering a Castile Brine Pocket Material ID - Parameter ID Low Value Baseline High Value
TDEM results, the Agency believes that the probability of encountering a brine pocket is greater than zero. Similarly, the high value (0.60) was set higher than the highest value interpreted from the TDEM results (0.55; see The Earth Technology Corporation 1988 and WPO # 39121 p. 2). The Agency considers these values to be adequate for checking the sensitivity ofthe PA model to changes in this parameter. Files used to evaluate Probalility of Encountering Castile Brine Pocket: (See Appendix CCGF) Unique Id: "pbr" Evaluation Script: EPA CMS; libepa_eval: Fetch; CFE eval_ccgf_pbr_hi.inp
CFE ccgf_jpbr_lo. inp References: The Earth Technology Corporation 1988
ALGEBRA file for calculating BRAGFLO sensitivity analysis parameters April 1997 - CMW - added GASFLOW variables needed for the EPA sensitivity analysis. Added 7 variables (#247 to # 2 5 3 ) . 17 February 1997 - corrected comment labels for parameters 059 to 063 30 January 1997 - added Param number 246, which passes BRAGFLO property
GRIDFLO as parameter BPMAP, and changed name of Param number 244 from BPCOMPCF to BPCOMP 02 December 1996 - revised Param number 099 to change its definition from total net brineflow in marker beds to total net inward brineflow from marker beds into DRZ (repository) region 04 September 1996 - 245 variables Authors:
Christensen, C.L., and T.O. Hunter 1980. The Bell Canyon Test Results. Report SAND802414C, Sandia National Laboratories, _Mbuquerque, New Mexico, November.
CCA (DOE Carlsbad Area Office) 1996. Title 40 CFR Part 191, Compliance Certification Applicationfor the Waste Isolation Pilot Plant. Report DOE/CAO-1996-2184, U.S. Department of Energy Waste Isolation Pilot Plant, Carlsbad jf-Vrea Office, Carlsbad, New Mexico, October. [Docket: A-93-02, II-G-l]
EPA 1997. Compliance Certification Application Performance Assessment Computer Code Users Manual. U.S. Environmental Protection Agency, Office of Radiation and Indoor Air,
Washington D.C. Lenke, L.R., J.W. Berglund, and R.A. Cole 1996. Blowout Experiments Using Fine Grained Silica Sands in an Axisymmetric Geometry. Report NMERI 1996/7/32250, New Mexico Engineering Research Institute, University of New Mexico,. .Albuquerque, New Mexico, March. [Docket: A-93-02, Reference #396]
Ross-Brown, D., J. Gibbons, D. Porter, and J. Schatz 1996. Final Waste Isolation Pilot Plant Engineered Systems Data Qualification Supplementary Peer Review Report. Prepared for U.S. Department of Energy, Carlsbad j-^rea Office, Office of Regulatory Compliance, Carlsbad, New
Mexico, December. SNL 1992. Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992, Volume 3: Model Parameters. Report SAND92-0700/3, Sandia National Laboratories, _\lbuquerque, New Mexico, December. [Docket: A-93-02, Reference #563, Volume 3] The Earth Technology Corporation 1988. Final Report for Time Domain Electromagnetic (TDEM) Surveys at the WIPP Site. Report SAND87-7144, prepared by The Earth Technology