Policy Replication

Technical Support Document for Section 194.23: Review of TDEM Analysis of WIPP Brine Pockets [A-93-02-V-B-30]

Docket document2020-08-18 · EPA · report · EPA-HQ-OAR-2002-0061-0422
RIN 2060-AG85, RIN 2060-AE30 · Docket EPA-HQ-OAR-2002-0061

Other documents for the same rulemaking

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1995-01-30 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1995-03-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive WastesProposed Rule
1995-08-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1996-02-09 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-01-21 Federal RegisterOpportunity To Present Oral Testimony on the DOE's Compliance Certification Application for the Waste Isolation Pilot Plant; Notice of Public Hearings
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1997-12-05 Federal RegisterOpportunity To Present Oral Testimony on EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's (WIPP) Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision;'' Notice of Public Hearings
1998-01-27 Federal RegisterOpportunity to Comment on EPA's Analysis of Air Drilling as it Relates to EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's (WIPP) Compliance with the 40 CFR Part 191 Disposal Regulations: Certification Decision''
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-01 Federal RegisterOpportunity To Present Oral Testimony on Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Notice of Public Hearings
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]

References: 11 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
TDEM Contacts Tables Page Generalized WIPP Geoelectric Section Comparison of Simulation Results to Helton (1994) Figures Page Occurrence of Brine in WIPP Site Boreholes
research reportNot linked to a paper · refsec
WIPP. These models appear to reasonably bound the expected range of probabilities. Results developed in this study closely reproduce the results presented in the 1992 PA. However, our analyses of approach taken in the 1992 PA indicate that consideration ofthe entire repository as an aggregate rather than considering the repository on a panel-by-panel basis can result in different proabilities when using the block model. The fraction of panels 1 and 8 (i.e., those nearest WIPP-12) underlain by brine ranges from 50 to 88%, while for panels 5, 6, 7. and 9, the fraction ranges from 10 to 50%. Probability distributions for the remote handled (RH) TRU waste disposal areas were very similar to those for the main disposal areas. 1. Introduction Understanding whether subsurface regions containing brine exist below the waste storage panels at the WIPP site is important in developing disturbed case scenarios for the WIPP repository. The particular brine pocket pathway of concern involves an accidental encounter of a brine pocket and repository waste during drilling for resources. In such a scenario, transport of brinemobilized waste to the accessible environment could be facilitated. In order to assess the effects of this scenario, a description ofthe subsurface distribution of brines is required. One ofthe main difficulties associated with creating a quantitative description of subsurface brines at the
research reportNot linked to a paper · refsec
DOE has used these two tools to estimate the number, type, and distribution of brine reservoirs beneath WIPP, and, subsequently, to develop probability distribution functions describing the likelihood that boreholes would intercept brine. This report critiques the process used by SNL for detecting, parameterizing, and quantifying the brines with TDEM methods and the methods used to develop probability distribution functions used in the 1992 performance assessment (SAN92) for modeling brine-related scenarios. On the basis of this review, EPA developed a distribution function for the probability of intersecting a brine pocket in the Castile be used in the
research reportNot linked to a paper · refsec
National Laboratories, 1994. BAR89 Bartel, L.C, "Results from Electromagnetic Surface Surveys to Characterize the Culebra Aquifer at the WIPP Site," Sandia National Laboratories, DE90001884, June 1989. DOE96 U.S. Department of Energy, "Title 40 CFR Part 191 Compliance Certification for the Waste Isolation Pilot Plant," Chapter 2, (Docket:A-93-02, II-G-1). EAR88 Earth Technology Corporation, "Final Report for Time Domain Electromagnetic (TDEM) Surveys at the WIPP Site," SAND87-7144, June 1988. HEL94
research reportNot linked to a paper · refsec
Helton, J.C. and Shiver, A.W., "A Monte Carlo Procedure for the Construction of Complementary Cumulative Distribution Functions for Comparison with the EPA Release Limits for Radioactive Waste Disposal," Sandia National Laboratories, SAND94-2128, October 1994. KAU83
research reportNot linked to a paper · refsec
Kaufman, A.A. and G.V. Keller, Frequency and Transient Soundings. Elsevier, 1983. LAP89
research reportNot linked to a paper · refsec
Lappin, A.R., "Summary of Site Characterization Studies Conducted from 1983 through 1987 at the WIPP Site Southeastern New Mexico," SAND88-0157, Sandia National Laboratories, January 1989. NEI8:
research reportNot linked to a paper · refsec
Spiegler, "Evaluation ofthe Suitability ofthe WIPP Site," EEG-23, May, 1983. POP83
research reportNot linked to a paper · refsec
Popielak, R.R., Beauhiem, R.L., Black, S.R., Coons, W.E., Ellington, C.T., and R.L. Olsen, "Brine Reservoirs in the Castile Formation, Soutiieastern New Mexico," Report TME-3153, January 1983. SAN92 Sandia National Laboratories, "Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992," SAND92-0700, December 1992. P.46 SK089
research reportNot linked to a paper · refsec
WIPP Site, New Mexico," SAND87-7174, Sandia National Laboratories, June 1989. ST096
research reportNot linked to a paper · refsec
Stolz, N., Raiche, A., Sugeng, F., and J. Macnae, "Is full 3-D inversion necessary for interpreting EM data," in Explor. Geophvs.. Vol. 26, pp. 167-171, 1996. P.47 Appendix A
research reportNot linked to a paper · refsec