Revised MACT Floor Analysis (2019) for the Industrial, Commercial, and Institutional Boilers and Process Heaters National Emission Standards for Hazardous Air Pollutants - Major Source
Other documents for the same rulemaking
References
EPA's Response to Remand of the Record for Major Source Boilers on July 14, 2014. Docket ID: EPA-HQ-OAR2002-0058-3892. Approach for Applying the Upper Prediction Limit to Limited Datasets for Boilers and Process Heaters at Major Sources. August 2019. sources are identical to the methods and assumptions used in the MACT floor analysis for the 2013 final rule , with the same two exceptions noted for existing sources in section 2.0 of this memo related to the ranking criteria and the treatment of limited datasets. There are three other exceptions to the methods for new sources that differ from the approach taken in the 2013 final rule, as discussed below.
First, data from process-specific fuels or units co-firing fuels had previously been eliminated from consideration as the basis of the new source floor calculation in the 2013 final rule. That data elimination rule has been removed in this proposed analysis, and the EPA reviewed each top performer to assess whether or not the UPL calculation is truly representative of the best controlled similar source. The tests involved are consistent with the tests described in the limited dataset memorandum. 8
Second, in the 2013 final rule the EPA defaulted to the existing source floor in cases where the calculated existing source UPL was more stringent than the corresponding new source floor for the same pollutant and subcategory. This default no longer occurs. While a comparison of the new and existing source floor values are taken into consideration, the underlying tests on variability of the data for each unit used for the floor calculations, as explained in the limited dataset memorandum, are the new driver of what unit is ultimately selected as the basis of the new source floor. These tests are applied not only to limited datasets but also to scenarios where a calculated new source floor may exceed an existing