M. Icenhour, MRI, to Project File. Documentation of Stack Parameters Provided in 2002 submittal of National Emission Inventory (NEI) data and as Inputs for Risk Assessment [A-98-44-II-B-58]
Other documents for the same rulemaking (all, by stage)
References
Virginia, Document E-I-58 of Docket A-98-44, August 15,1997. Source Emission Test Report, Dryer and Press Exhausts Allegheny MDF Limited
Partnership, Mt. Jewett, Pennsylvania, Test Dates October 22-24 and December 17, 1997, prepared for Allegheny MDF Limited Partnership, by Galson Measurements, Galson Project No. 975540, December 3,1997. Results ofthe November 14-17,1995 Air Emission Compliance Tests at the LouisianaPacific Waferboard Plant in Missoula, Montana, prepared for Louisiana-Pacific
Corporation, by Interpoll Laboratories, Inc., Report No. 5-6833, December 27, 1995. Weyerhaeuser Company-Matshfield, Wisconsin, Steam-Thru Door Core Plant Press
Vents, VOC Compliance Testing 1998.3, Test Dates August 6-7, 1998, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9850, September 15, 1998. Results of a Series of Source Emission Compliance Tests (TSP, PMIO, VOC, CO, NOx, Formaldehyde and Opacity) on the OSB Wafer Dryer at Northwood Panelboard Co.,
Solway, Minnesota, February 28 - March 2, 1997, prepared for Northwood Panelboard
Company, by MMT Environmental Services, Inc., MMT Report No. 10235, March 21, 1997. Information Stack Test Report, Wellons Cyclo-Blast Wood-Fired Furnaces, Wood Strand
Dryers, Fuel Energy Analysis for Trus-Joist MacMillan, Hazard, Kentucky, Test Date March 1,1996, prepared for Trus-Joist MacMillan, by Commonwealth Technology, Inc., June 18, 1996. Compliance Stack Test Report, Test Results for Wellons Cyclo-Blast Wood-Fired
MacMillan, Hazard, Kentucky, Test Dates February 28-29 and March 27, 1996, prepared for Trus-Joist MacMillan, by Commonwealth Technology, Inc., June 18, 1996. Permit materials for Medite Corporation Hardboard Manufacturing Facility in Medford,
Oregon, Document U-I-50 of Docket A-98-44, February 18, 1997. Stationary Source Sampling Report for Georgia Pacific Corporation, Mt. Hope, West
Virginia, Wellons Energy Unit, Press Vent, Test Dates August 7-8,1996, prepared for Georgia Pacific Corporation, by Trigon Engineering Consultants, Inc., Project No. 04796-004, August 1996. Permit materials for J.M. Huber Corporation Oriented Strandboard Manufacturing Plant in Commerce, Georgia, Document II-I-74 of Docket A-98-44, September 25, 1998. Results of a Series of Source Emission Tests on the OSB Core Wafer Dryer Exhaust and the Board Press Hood Exhaust at Northwood Panelboard Co., Solway, Minnesota, October 9-10,1997, prepared for Northwood Panelboard Company, by MMT Environmental Services, Inc., MMT Report No. 10257, November 18, 1997. Weyerhaeuser Company-Marshfield, Wisconsin, Steam-Thru Door Core Dryer and Press
Testing, Formaldehyde Air Emissions 1996.4, Test Dates October 19 and 21,1996, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9640, December 30, 1996. Emissions Test Report, Boise Cascade Corporation, Island City, Oregon, Green Furnish
Dryer, March 10 & 11, 1998, prepared for Boise Cascade Corporation, by BWR
Associates, Inc., Project No. 98-042D, 1998. Title V Emissions Testing on the Furnish Dryer Exhaust, Georgia Pacific Corporation, Panelboard Plant, Monticello, Georgia, February 13, 1996, prepared for CH2M Hill, by Analytical Testing Consultants, Inc., Report No. 5743, March 13, 1996. Report of Air Emissions Tests for Louisiana-Pacific Corporation Silsbee Particleboard Facility Core and Face Dryer Cyclones, Test Date September 23, 1997, prepared for Louisiana-Pacific Corporation, by Environmental Monitoring Laboratories, Inc., October 18, 1997. In-House Air Emissions Testing of Primary Dryer Outlet, Hope Particleboard Plant,
Hope, Arkansas, Test Dates January 29-31,1997, prepared for Temple-Inland Forest Products Corporation, by Maxim Technologies, Inc., Project No. 1411700875A, March 14,1997. In-House Air Emissions Testing of Primary Dryer Outlet and RTO Press Vent Inlet, Hope Particleboard Plant, Hope, Arkansas, Test Dates February 12-14, 1997, prepared for Temple-Inland Forest Products Corporation, by Maxim Technologies, Inc., Project No. 1411700875B, March 17, 1997. Weyerhaeuser Company-Marshfield, Wisconsin, Door Core Dryer, Particulate Compliance 1996.4, Test Date October 19, 1996, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9640, December 12, 1996. Formaldehyde Methods Comparison, NCASI Acetylacetone Method vs. EPA Method 0011, Weyerhaeuser Company, Springfield, Oregon, MEC #3 Rotary Particle
Dryer, Test Dates February 27-28,1996, prepared for Weyerhaeuser Company, by BWR
Associates, Inc., 1996. Permit materials for Weyerhaeuser Company Particleboard Facility in Adel, Georgia, Document H-I-34 of Docket A-98-44, June 24, 1996. Emissions Test Report, Willamette Industries Duraflake Division, Millersburg (Albany),
Oregon, Green Dryer #3, Test Dates March 27-28,1997, prepared for Willamette
Industries, by BWR Associates, Inc., Project No. 97-043D, 1997. Emissions Test Report, Willamette Industries Duraflake Division, Albany, Oregon, Boiler #1, Green Dryer #1, and Green Dryer #2, Test Dates April 22-23 and 25-26, 1996, prepared for Willamette Industries, by BWR Associates, Inc., Project No. 96-048X, 1996. Results ofthe January 17-19, 1995 Source Emission Tests on the Dryer Stack, Dump Stack and Humidification Kiln Stack at the Georgia Pacific Facility Located in Phillips,
Wisconsin, prepared for CH2M Hill, by PACE, Inc., Project No. 941228.401, March 2, 1995. Permit materials for Langboard, Incorporated Medium Density Fiberboard Plant in
Willacoochee, Georgia, Document II-I-66 of Docket A-98-44, June 11, 1998. Report for 1995 VOC Emission Compliance Tests at the Wood Fiber Dryers and Press
Vents, SierraPine, Ltd., Rocklin, California, Test Dates April 10-13, 1995 and May 1719, 1995, prepared for SierraPine, Ltd., by Carnot, May 1995. Report for PM-10 Emission Measurements from the Wood Fiber Dryers, SierraPine, Ltd.,
Rocklin, California, Test Dates April 10-13, 1995, prepared for SierraPine, Ltd., by
Carnot, April 1995. Report for 1996 PM-10 Emission Measurements for Emission Reduction Credits,
SierraPine, Ltd., Rocklin, California, Test Dates November 19-26, 1996, prepared for
SierraPine, Ltd., by Carnot, April 1997. Report of Air Emissions and Inlet Loading Tests for Willamette Industries-Malverne
MDF Facility Line II Dryers Thermal Oxidizer, Malverne, Arkansas, Test Dates March 5-6,1998, prepared for Willamette Industries, by Environmental Monitoring
Laboratories, April 3,1998. Permit materials for Fourply, Incorporated Plywood Manufacturing Plant in Grants Pass,
Oregon, Document H-I-37 of Docket A-98-44, September 9, 1996. Permit materials for Georgia-Pacific Panelboard and Plywood Plants in Monticello,
Georgia, Document E-I-69 of Docket A-98-44, August 28, 1998. Emissions Testing for Particulate, Formaldehyde, CO, NOx, VOCs on Various Process
Exhausts, Trus-Joist Macmillan, a Limited Partnership, Buckhannon, West Virginia, Test Dates December 12-16,1995, prepared for Trus-Joist MacMillan, by Analytical Testing
Consultants, Inc., Report No. 5712, January 25, 1996. Engineering Evaluation Test Report, Formaldehyde, Total Hydrocarbons, and Methane Emissions from Four Process Stacks, Willamette Industries, Inc., Emerson, Louisiana, Test Dates April 23-24,1998, prepared for Willamette Industries, Inc., by DEECO, Inc., Project No. 1559, June 7,1998. Emissions Test Report, Willamette Industries, Springfield, Oregon, Veneer Dryer #1 and Veneer Dryer #2, Test Dates June 1-2, 1998, prepared for Willamette Industries, by BWR
Associates, Inc., Project No. 98-092D, 1998. Title V Emissions Test Report, PMIO, Particulate Matter, Condensible Particulate
Monoxide, Nitrogen Oxides, and Cold Total Hydrocarbons from Process Stacks, Georgia Pacific Hardboard Manufacturing Plant, North Little Rock, Arkansas, Test Dates September 26-29, 1995, prepared for CH2M Hill and Georgia Pacific Corporation, by
DEECO, Inc., Report No. 95-1200-A, October 27, 1995. Permit materials for Evanite Fiber Corporation Hardboard Division in Corvallis, Oregon, Document H-I-32 of Docket A-98-44, May 17, 1996. Permit materials for Jeld-Wen Fiber of North Carolina in Marion, North Carolina, Document H-I-42 of Docket A-98-44, July 9, 1996. Permit materials for Masonite Oriented Strandboard Manufacturing Plant in Cordele,
Georgia, Document II-I-67 of Docket A-98-44, December 18, 1996. Emissions Test Report, Willamette Industries MDF, Eugene, Oregon, Press Vents, Test Dates November 13-14,1996, prepared for Willamette Industries, by BWR Associates, Inc., Project No. 96-165X, 1996. Report of VOC and Formaldehyde Emissions Test for Willamette Industries-Malverne
MDF Facility Line I Press Vent Baghouse, Malverne, Arkansas, Test Date July 24,1998, prepared for Willamette Industries, by Environmental Monitoring Laboratories, August 14, 1998. Report of VOC and Formaldehyde Emissions Test for Willamette Industries-Malverne
MDF Facility Line II Press Vent Baghouse, Malverne, Arkansas, Test Date September 10, 1998, prepared for Willamette Industries, by Environmental Monitoring
Laboratories, September 29,1998. In-House Air Emissions Testing ofthe Diboll Particleboard Plant, Diboll, Texas, Test Dates October 8-9 and 15,1997, prepared for Temple-Inland Forest Products
Corporation, by Maxim Technologies, Inc., Project No. 9711254A, January 12,1998. Emission Test Report Particleboard Press and No. 2 Rotary Dryer (MEC Dryer with Wood-Fired Burner) Emissions Testing, International Paper, Decorative Products
Division, Stuart, Virginia, Test Dates June 8-10,1998, prepared for International Paper Decorative Products Division, by Roy F. Weston, Inc., Work Order No. 00157-045-002, June 1998. Weyerhaeuser Company-Marshfield, Wisconsin, Formaldehyde Emissions Variability
Study, Press Area Common Stack, Test Dates April 1,1998 to June 30,1998, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9753, 1998. Weyerhaeuser Company-Marshfield, Wisconsin, Door Core Press Scavenger Trials, Press Vent Formaldehyde Air Emissions 1997.3, Test Dates July 21-24, 1997, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9741,1997. Weyerhaeuser Company-Marshfield, Wisconsin, Formaldehyde Emissions Variability
Study, Press Area Common Stack, Test Dates December 18, 1997 to March 26, 1998, prepared for Weyerhaeuser Company, by Weyerhaeuser Company, Project No. 721-9753, May 26, 1998. Press Room Vent Emissions Sampling, Willamette Industries, Inc., Emerson, Louisiana, Test Dates February 8-9, 1995, prepared for Willamette Industries, Inc., by Armstrong
Environmental, Inc., Project W-1653-95, February 20, 1995.