New York ISO 2020 Reliability Needs Assessment Report
Other documents for the same rulemaking
References
ESPWG/TPAS 2. April 6, 2020 TPAS/ESPWG Wheel-Through Contract New category: 300 MW HQ through NYISO to ISO-NE. Modeled as firm contract. Reduced the transfer limit from HQ to
RNA study process 2020 RNA (2020 GB) Study Period: 2024(y4) 2030 (y10) 2020 RNA 70x30 Scenario Case Study Period: 2030 New Transmission Based on TO- provided firm plans (via Gold Book 2018 process) and proposed merchant transmission; inclusion rules applied Similar method Same as 2020 RNA Base Case
AC Cable Forced Outage Rates Similar method Same as 2020 RNA Base Case
PSEG-LIPA to reflect most recent five-year history Five-year history of forced outages Similar method Same as 2020 RNA Base Case SCRs sold for the program discounted to historic availability (“effective capacity”). Summer values calculated from the latest available July registrations, held constant for all years of study. 5 calls/month Similar method but with 15 calls/year Same as 2020 RNA Base Case 2018 Gold Book with effective capacity modeled. Not modeled: the values are less than 2 MW. Same as 2020 RNA Base Case Similar method Same as 2020 RNA Base Case Emergency Operating Procedures Special Case Resources
EDRP Resources Note: also, combined the two SCR steps (generation and load zonal MW) Resources sold for the program and discounted to historic availability. Summer values calculated from July 2018 registrations and forecast growth. Values