GM Arlington, TX Assembly Plant Compliance Emissions Test Report October 6, 2020
Other documents for the same rulemaking (all, by stage)
References: 3 extracted, 0 linked to papers
DAL-2kg-3 2000.0 2000.2 -0.2 Barometric Evidence of Pressure damage? Pitot ID Evidence of mis-alignment? Indicated Temp.(°F) 266.0 Calibration or Repair required? Difference Criteria 0.3% ± 1.5 % Acceptable Balance Tolerance is measurement within +/- 0.5g ofcertified weight Reading Verified Calibration or Repair required? Barometer ID 5R-2 10/6/20 Barometer Date Meter Box ID Positive Pressure Leak Check 10/6/20 12-1 Pass Page 35 of68
REPLICATE RESPONSES 1/20/2015 Nitrogen REFERENCE STANDARDS Component Reference Standard Cylinder # Concentration Propane XF00082213 979 1ppm Exp Date 3/14/2019 Sample#
FOKOAXOY Last Calibration: 1/20/2015 Notes: The certification was performed according to EPA Traceability Protocol for Assay and Certification of Gaseous Calibration Standards May 2012, using procedure GI and/or 62. U.S EPA Vendor ID Number: 062015, PGVP Participation Date: 01/01/15, PGVP Renewal Date: 01/01/16 Analyst: Date: 1/20/2015 Julie Higgins Page 47 of68 Red Ball Technical Gas Service