Technical Support for Other Technical Issues Addressed in Revisions to Subpart I
Other documents for the same rulemaking (all, by stage)
References: 4 extracted, 0 linked to papers
SIA (2011). Semiconductor Industry Associated Petition for Reconsideration and Request for Stay Pending Reconsideration of Subpart I of the Final Rule for Mandatory Reporting of Greenhouse Gases. January 31, 2011. Available in docket EPA–HQ–OAR–2011-0028.
SIA (2012a). Appendix 4 - Gas Cylinder Heel Triggers Industry. February 6, 2012. Available in docket EPA–
SIA (2012b). Response to EPA’s Stack Test Question 1. March 7, 2012. Available in docket EPA–HQ–OAR– 2011-0028.
SIA (2012c). Outstanding Questions / Topics from SIA / EPA Discussions as of April 24, 2012 Response as of April 26, 2012. April 26, 2012. Available in docket EPA–HQ–OAR–2011-0028. Some entities provided comment on the April 2010 proposed subpart I that a one percent of full scale accuracy and precision requirement was not feasible for all facilities. The commenters stated that 74 percent of respondents (where respondents represent 58 percent of total U.S. silicon area production capacity) to an industry survey have measurements devices that meet the 1 percent accuracy requirement, but 24 percent do not. The commenters also stated that no respondents to the industry survey utilized flow meters with an accuracy of 1 percent for tracking gas consumption. However, the EPA elected to not modify this requirement in the final subpart I because it was not clear that the commenters understood the requirements of subpart I as they were intended, and research indicated that equipment at that level of accuracy and precisions was available (although in some cases, as the commenters noted, the more accurate equipment may not have been installed at all facilities). Please see the Subpart I Response to Comments Document (dated November 2010) for more information. Page 8 of 8