{"document":{"doc_id":174362,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Alternative MAOP Final Rule","date":"2022-09-15","url":"https://www.regulations.gov/document/PHMSA-2013-0255-0053","source_native_id":"PHMSA-2013-0255-0053","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":248546,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ORNL Valves Study","date":"2014-04-11"},{"doc_id":248547,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Kiefner Leak Detection Study Final Report Dec. 2012","date":"2014-04-11"},{"doc_id":248551,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Pipeline Conference San Antonio, TX 4.9.14","date":"2014-04-11"},{"doc_id":248552,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GAO Study of Data and Incident Response","date":"2014-04-11"},{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06"},{"doc_id":224366,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Comment of Pipeline Technology (PT)","date":"2020-05-26"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":220099,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Introductory Meeting with PST","date":"2021-02-26"},{"doc_id":217090,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting Summary","date":"2022-01-28"},{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":176460,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Environmental Analysis for the \"\"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":174334,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM on EFRDs 59 FR 2802","date":"2022-09-15"},{"doc_id":174338,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010","date":"2022-09-15"},{"doc_id":174342,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America (INGAA)1","date":"2022-09-15"},{"doc_id":174343,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011","date":"2022-09-15"},{"doc_id":174346,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API-AOPL Comments on Draft Valve Study 10-26-2012 FINAL","date":"2022-09-15"},{"doc_id":174347,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Andy Drake PHMSA Valve Workshop","date":"2022-09-15"},{"doc_id":174350,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Comments of Accufacts Inc.","date":"2022-09-15"},{"doc_id":174351,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"CFER Comments on ORNL Valve Study 25Oct2012","date":"2022-09-15"},{"doc_id":174354,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"1996 Study RCV Feasibility","date":"2022-09-15"},{"doc_id":174355,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"CPUC Approves Pipeline Safety Plan for PG E 12-20-2012","date":"2022-09-15"},{"doc_id":174357,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"AGA Final Comment Valve Study","date":"2022-09-15"},{"doc_id":174358,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ADB-10-0- 1","date":"2022-09-15"},{"doc_id":174361,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"166 Congressional Record H8823 12-21-2020","date":"2022-09-15"},{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":174180,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"DennisJarnecke  Main Line Valves","date":"2022-09-16"},{"doc_id":174181,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Transcript 7 22 2020","date":"2022-09-16"},{"doc_id":174182,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Dennis Jarnecke R D Program Main Line Valves","date":"2022-09-16"},{"doc_id":174183,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Kiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012","date":"2022-09-16"},{"doc_id":174184,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LPAC Meeting Transcript Valve Rule July 23 2022","date":"2022-09-16"},{"doc_id":174185,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"March 1991 Emergency Flow Restricting Devices Study","date":"2022-09-16"},{"doc_id":174186,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 23 2020","date":"2022-09-16"},{"doc_id":174187,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT Pre PAC Briefing  Valve Installation and Minimum Rupture Detection Standards","date":"2022-09-16"},{"doc_id":174188,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Placeholder low stress HL accident data","date":"2022-09-16"},{"doc_id":174189,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Report to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018","date":"2022-09-16"},{"doc_id":174190,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Pipeline Research and Development Forum Event Summary Report 07 2012","date":"2022-09-16"},{"doc_id":174191,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"WG2 ReportOut  Leak Detection Mitigation and Storage","date":"2022-09-16"},{"doc_id":174192,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"49 CFR Part 192  current","date":"2022-09-16"},{"doc_id":174193,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"20141024 4001Constitution FEIS Vol 1 Environmental Analysis","date":"2022-09-16"},{"doc_id":174194,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"KeystoneXLFEISc","date":"2022-09-16"},{"doc_id":174195,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Enbridge2012","date":"2022-09-16"},{"doc_id":174196,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PG E officials grilled about automatic shut off valves  The Mercury News","date":"2022-09-16"},{"doc_id":174197,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. energy facts explained","date":"2022-09-16"},{"doc_id":174198,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Incident20150148","date":"2022-09-16"},{"doc_id":174199,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Dave Chittick Valve Considerations for Natural Gas Transmission Pipelines","date":"2022-09-16"},{"doc_id":174200,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","date":"2022-09-16"},{"doc_id":174201,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Don Ledversis28 Valve Considerations for Hazardous Liquid Pipelines","date":"2022-09-16"},{"doc_id":174202,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Leak Valve Event Summary Report","date":"2022-09-16"},{"doc_id":174203,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LPAC Vote Slides","date":"2022-09-16"},{"doc_id":174204,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"NTSB Special Study PSS 71 01 12 31 1970","date":"2022-09-16"},{"doc_id":174205,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 16 2020","date":"2022-09-16"},{"doc_id":174206,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2","date":"2022-09-16"},{"doc_id":174207,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Pipeline Safety Regulatory Certainty and Job Creation Act of 2011","date":"2022-09-16"},{"doc_id":174208,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"San Bruno Victims and Their Families Deserve Long Overdue Action  NTSB Safety Compass Blog","date":"2022-09-16"},{"doc_id":174209,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"SteveNanney PHMSA RESEARCH  TECHNICAL PERSPECTIVES","date":"2022-09-16"}],"references":[{"citation_id":2604453,"raw_reference":"AGA added that incorporating the standard could have unintended consequences of making the rule too prescriptive and precluding the use of equivalent standards. Response The final rule incorporates ASTM A578/A578M–96 into the regulations. Incorporation by reference makes the provisions of the standard apply, when it is referenced in a regulation, in the same manner as if they were written in the CFR. Referencing consensus standards wherever possible is the policy of the Federal government. This standard is referenced in the regulation for assuring plate/coil quality control (QC). That reference requires that ultrasonic (UT) testing be VerDate Aug<31>2005 19:47 Oct 16, 2008 Jkt 217001 conducted in accordance with the standard, API 5L paragraph 7.8.10, or equivalent. The pipe must also be manufactured in accordance with API 5L which is already referenced in § 192.7. PHMSA considers that the allowance for use of an equivalent standard renders moot the concerns expressed by AGA and GPTC. C.2.2. Design Requirements Section 192.112(a), General Standards for the Steel Pipe Carbon equivalent: INGAA, five pipeline operators and two pipe manufacturers all noted that the proposed limit in paragraph (a)(1) on carbon equivalent (CE) (0.23 percent","cited_authors":null,"cited_year":null,"cited_title":"AGA added that incorporating the standard could have unintended consequences of making the rule too prescriptive and precluding the use of equivalent standards","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}