Report, Response of the Chesapeake Bay Water Quality Model to Loading Scenarios, Prepared by the Modeling Subcommittee of the Chesapeake Bay Program, April 1994 [A-95-28-IV-A-38]
Other documents for the same rulemaking (all, by stage)
References: 22 extracted, 1 linked to papers
Annapolis, MD. 2. A.S. Donigian et al., 1991. Watershed Model Application to calculate Bav Nutrient Loads: Phase II Findings and
Recommendations U.S. EPA Chesapeake Bay Program. Annapolis, MD 3. C F . Cerco and T. Cole, 1993. Application of the Three-Dimensional Eutrophication Model CE-OUAL-ICM to Chesapeake Bav U.S. Corps of Engineers Waterways Experiment Station. Vicksburg, MS. 4. D.M. Di Toto and J J . Fitzpatrick, 1993. Chesapeake Bav Sediment Flux Model Waterways Experiment Station.' Vicksburg, MS U.S. Corps of Engineers 5. B.H. Johnson et al., 1991. Users Guide for a Three-Dimensional Numerical Hydrodynamic. Salinity, and Temperature Model of Chesapeake Bav U.S. Corps of Engineers Waterways Experiment Station. Vicksburg, -Ill- P.14
Hickman, S.Kollar, and S. Bieber. 1992. Chesapeake Bay submerged aquatic vegetation habitat requirements and restoration targets: A technical synthesis. CBP/TRS 83/92, Annapolis, MD.
Blumberg, Af, B.H. Johnson, R.H. Heath, B.B. Hsieh, V.R. Pankow, K.W. Kim and H.L. Butler, 1991. Data employed in the development ofa three-dimensional, time-varying numerical hydrodynamic model of Chesapeake Bay. Tec. Rept. HL-91-1, Waterways Exp. Sta., Corps of Eng., Visksburg, Miss., prepared for US army Eng. District, Baltimore, MD, 180 pp.
Cerco, CF. and T. Cole, 1992. Application ofthe three-dimensional eutrophication model
Chesapeake Bay Program, 1993. Chesapeake Bay living resources habitat-based water quality restoration priorities. Draft report prepared for CBP, 29 pp + Figs.
A. (1993). Assessing water quality with submersed aquatic vegetation.
BioScience, 43(2), 86-94. Di Toro, D.M. and J.F. Fitzpatrick, 1993. Chesapeake Bay sediment flux model. Prepared by
Reynolds, 1991. Watershed model application to calculate Bay nutrient loadings. Final findings and recommendations. Aqua Terra Conslutants, Comp. Sci. Corp.Chesapeake Bay Program
Office, USEPA, Annapolis Md. 283 pp. Dortch, M.S., 1990. Three-dimensional \, Lagrangian residual transport computedfroman intratidal hydrodynamic model. Tech. Report EL-90-11, Waterways Exp.Sta., Corps of Eng.,
Fisher, T.R., E.R. Peele, J.W. Ammerman, and L.W. Harding, Jr., 1992. Nutrient limiation of phytoplankton in Chesapeake Bay. Mar. ECol. Prog. Ser. 82:51-63.
Funderbuck, S.L., S.J. Jordan, J.A. Mihursky and D. Riley. 1991. Habitat requirements for Chesapeake Bay living resources. Prepared for Living Resources Subcommittee, Chespaeake Bay
Program, Annapolis MD. 2nd Edition, 23 Chapters + App. Illinois Env. Pro. Agency, 1983. Soil erosion and sediment transport. Dynamics on the Blue Creek watershed. IEPA/WPC/83-004, Springfiled, IL.
VIII-1 P.45 Johnson, B.H., R.E. Heath, B.B. Hsieh, K.W. Kim and H.L. Butler, 1991. User's guide for a three-dimensional numerical hydrodynamic, salinity, and temperature model of Chesapeake Bay. Tech. Rept. HL-91-20. Waterways Exp. Sta. Corps of Eng., Vicksburg, Miss., prepared for US Army Eng. District, Baltimore, MD, 41 pp + Append.
Johnson, B.H., K.W. Kim, R.E. Heath and H.L. Butler, 1991. Verification ofa three-dimensional numerical hydrodynamic model Of Chesapeake Bay. Tech. Rept. HL-91-7. Waterways Exp. Sta. Corps of Eng., Vicksburg, Miss., prepared for US Army Eng. District, Baltimore, MD.
Jordan, S., M. Olson, C. Stenger, K. Mountford, and R. Batuik. 1992. Chesapeake Bay dissovled oxygen goral for restpration of living resources habitats. CBP/TRS/88/92. Annapolis, MD.
Kuo, A.Y., Park, K. and Moustafa, M.Z., 1991. Spatial and temporal variabilities of hypoxia in the Rappahannock River, Virginia. Estuaries, 14, 113-121.
Nutrient Reevaluation Workgroup, 1992. Progress report ofthe Baywide nutrient reduction reevaluation. Printed by USEPA for the Chesapeake Bay Program, Annapolis, MD, 68 pp.
Walling, D.E., 1983. The sediment delivery problem. J. of Hydrology, 65:209-237.
APPENDIX A. SCENARIO DESCRIPTIONS SCENARIO 1 Base Case scenarios where 1985 loads from Bay Agreement States with nitrogen and phosphorus ocean boundary conditions computed based on mass balance outside the Bay mouth. The scenario is run with Water Quality Model (WQM) calibration optimized to the Phase II Watershed Model (WSM) loads. Atmospheric loads are to the water surfaces only throughout the Bay, its tributaries and the river reaches in the Bay Agreement States.
SCENARIO 3 40% + CAA for Bay Agreement States Only simulates a forty-percent reduction of controllable carbon, nitrogen, and phosphorus loads to the Bay from the Bay Agreement states, combined with implementation of the 1990 Clean Air Act (CAA). Nitrate (CAA) load reductions were performed individually for each watershed and for each year according to guidelines provided by the Chesapeake Bay Program Office on May 8, 1992. Atmospheric nitrate loads to the water surface were reduced fourteen percent. The net result was roughly an additional three percent (3%) nitrogen load reduction.
SCENARIO 4 40% + CAA for Bay Basin run simulates a forty-percent reduction of controllable carbon, nitrogen, and phosphorus loads to the Bay from the entire Bay watershed including Delaware, New York, and West Virginia, combined with implementation ofthe 1990 Clean Air Act (CAA). This differs from Scenario 3 in which controllable loads were reduced in the Bay Agreement states only. Nitrate (CAA) load reductions were performed individually for each watershed and for each year according to guidelines provided by the Chesapeake Bay Program Office on May 8, 1992. Atmospheric nitrate loads to the water surface were reduced fourteen percent. The net result was roughly an additional three percent (3%) nitrogen load reduction.