Rebuttal Testimony in Support of Cease and Desist Order No . 00-032. Dr. Michael S. Foster and Dr. David R. Schiel, Consultants to the CCRWQCB, California Regional Water Quality Control Board Central Coast (CCRWQCB) [W-00-03-DCN-1-1015-TC]
Other documents for the same rulemaking
References: 14 extracted, 0 linked to papers
1. Barry, J.P. Oral testimony for PG&E at the March 30,2000 Cease and Desist Hearing. Transcript of Proceedings reported by K.L. Grencik
2. Diener, D. 2000. Evaluation ofthe algae and invertebrate communities in Diablo Cove and Field's Cove. PG&E written testimony for the March 30,2000 Cease and Desist Hearing. Pages not numbered.
3. Foster, M.S. 2000. Oral testimony for CCRWQCB at the March 30, 2000 Cease and Desist Hearing. Transcript of Proceedings reported by R.L. Grencik.
4. Foster, M.S. & Schiel, D.R. 2000. Written Testimony for CCRWQCB for March 30, 2000
5. Jinks, S. 2000. Review of temperature exposures and expected biological responses of intertidal communities in the vicinity ofthe DCPP thermal discharge. PG&E written testimony for the March 30,2000 Cease and Desist Hearing. 12 pages + various table and figures
6. Lytz, K. 2000. Oral cross examination of Foster at March 30, 2000 Cease and Desist Hearing. Transcript of Proceedings reported by K.L. Grencik.
7. Love, M. 2000. Oral testimony for PG&E at the March 30, 2000 Cease and Desist Hearing. Transcript of Proceedings reported by K.L. Grencik.
8. Love, M. & Hansen, S.R. 2000. Analysis ofthe fish communities in Diablo Cove and Field's Cove. PG&E written testimony for March 30,2000 Cease and Desist Hearing. 13 pages
9. Raimondi, P. 2000. Oral testimony for League for Coastal Protection at the March 30,2000 Cease and Desist Hearing. Transcript of Proceedings reported by K.L. Grencik. Hearing. 3 pages
10. Schiel, D.R. 2000. Oral testimony for CCRWQCB at the March 30,^000 Cease and Desist Hearing. Transcript of Proceedings reported by K.L. Grencik.
11. Skalski, J.R. 2000. Critique ofthe Thermal Effects Study Design at Diablo Canyon Power Plant and Interpretation of Results. PG&E written testimony for M.arch 30,2000 Cease and Desist hearing. 12 pages + appendices
12. Tenera. 1997.Diablo Canyon Power Plant/Thermal Effects Monitoring Program/Chapter 1 Changes in the marine environment resulting from the Diablo Canyon Power Plant discharge (prepared for Pacific Gas and Electric Company). Tenera, San Francisco.
13. Thomas, M.T. 2000. Testimony by Michael Thomas, RWQCB, in support of Cease and Desist Order No. 00-032, for Consideration by the Regional Board on March 30,2000. 34 pages.
14. Warner, C.J., et al. 2000. Overview of Our Case. PG&E written testimony for March 30,2000 Cease and Desist