USEPA (2011) - Science Advisory Board Drinking Water Committee Augmented for the Review of the Effectiveness of Partial Lead Service Line Replacements, Report
Other documents for the same rulemaking (all, by stage)
References: 60 extracted, 0 linked to papers
Wujek, J.J. 2004. Minimizing Peak Lead Concentrations after Partial Lead Service Line Replacements. Presented at the AWWA Water Quality Technology Conference. San Antonio, TX. Studies identified by EPA for Issue 5:
Boyd, G., Reiber, S., and Korshin, G., 2010. Galvanic Couples: Effects of Changing Water Quality on Lead and Copper Release and Open-Circuit Potential Profiles. Proceedings of the 2010 AWWA Water Quality Technology Conference. Savannah, GA.
DeSantis, M. et al., 2009. Mineralogical Evidence of Galvanic Corrosion in Domestic Drinking Water Pipes. Proceedings of the 2009 AWWA Water Quality Technology Conference. Seattle, WA.
Deshommes, E. et al., 2010. Source and Occurrence of Particulate Lead in Tap Water. Water Research. pp. 3734 – 3744.
APPENDIX C - Reported Tap Water Lead Levels Following PLSLR Table C-1: Summary of Relevant Findings Study Britton and Richards, 1990
Commons, 2011 Gittelman et al., 1992 HDR, 2009 (same study reported by McFadden et al., 2011, who showed only summary data) Summary of Relevant Findings First-draw (FD) and random daytime (RDT) samples were collected on 10 days prior to a single PLSLR, 5 to 16 days after the PLSLR, then 2 and 4 mos. later. Prior to PLSLR only 1 sample (out of 20) had >0.1 mg Pb/L. On days 5 – 16, 3 of 10 FD samples and 3 of 10 RDT samples had >0.5 mg Pb/L, with a maximum of >4 mg Pb/L in the day-8 FD sample. On days 56 – 63, all FD and RDT samples (6 each) had <0.1 mg Pb/L; however, on days 64 – 69, all samples (4 of each type) had 0.1 – 0.25 mg Pb/L (perhaps for reasons unrelated to PLSLR, such as a change in water quality or temperature). After 4 mos., all FD and RDT samples (10 each) had <0.1 mg Pb/L, and the avg. Pb level was about 20 – 25% lower than pre-PLSLR; but the lower Pb levels may have been due in part to the long-term effects of optimized corrosion control treatment (OCCT) implemented shortly before pre-PLSLR sample collection.
Cincinnati, a 1991 study found high Pb levels immediately after PLSLR (about 300 ppb in one sample, according to DeMarco, 2004), but lower levels 9 months later.
FD and profile samples (after 6 hrs stagnation) were collected in cooperation with 4 utilities for 14 FLSLRs, 2 PLSLRs, and 1 PLSLR where the customer’s line was copper. In Boston, particulate Pb was elevated (up to 800 ppb) at 3 of 4 sites immediately after FLSLR. For the PLSLRs: in DC, Pb in the FD samples increased from 3.7 to 7.5 ppb after 2 months, but Pb was <AL and the total mass of Pb in the profile samples was 15 μg lower; and, in Toronto, Pb in the FD samples dropped from 18.8 to 16.0 after 2 months, but was still >10 ppb, the provincial standard. Many sites registered high Pb for up to 3 days following both partial and full LSLRs; but by 1 to 2 months after partial or full LSLR, all sequential samples at the tap were either lower than Swertfeger et al., 2006
USEPA, 1991b (Internal EPA report by Wysock) Weston and EES, 1990 (cited as
AWWA, 1990 in Table 11 in the LCR, USEPA, 1991a) Commenter Steve Reiber, March 30, 2011 before or essentially the same. They concluded that “elevated lead levels may occur in standing samples in the short term (up to 3 days), and may in some cases persist for longer periods of time, particularly if only a portion of the lead service line is removed”; and a “rigorous flushing regime (up to 60 minutes) may help…” Samples were collected before, one wk after, and at one mo intervals after 5 FLSLRs, 5 PLSLRs, 6 PLSLRs with the freshly cut end protected by Teflon, and 5 control sites. Samples were FD after at least 6 h stagnation, then after a 3-min flush and a 10-min flush. Tap flow rates not reported. The pH of the distributed water was increased from 8.5 to 8.8 before 1-wk samples at all sites and the 1-mo samples at the FLSLR sites were collected, causing Pb levels to decrease at the control sites.