NREL LBNL Kevala DOE 2024 Multi-State Transportation Electrification Impact Study FINAL DOCKET
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
References: 14 extracted, 0 linked to papers
Borlaug, B., Muratori, M., Gilleran, M., Woody, D., Muston, W., Canada, T., Ingram, A., Gresham, H., McQueen, C., 2021. Heavy-duty truck electrification and the impacts of depot charging on electricity distribution systems. Nature Energy 6, 673–682.
Fisher, Ryan. Bloomberg New Energy Finance. Commercial EV Charger Price Survey 2022: Pressure Mounts. September 16, 2022. March 2024 Charger Hardware Unit Cost per Port in 2021 Installation Cost per Port in 2021
Meng, L., et al. (2021). Comparing expert elicitation and model-based probabilistic technology cost forecasts for the energy transition. https://doi.org/10.1073/pnas.1917165118.
Edward S. Rubin, Inês M.L. Azevedo, Paulina Jaramillo, Sonia Yeh, A review of learning rates for electricity supply technologies, Energy Policy, Volume 86, 2015, Pages 198-218, ISSN 0301-4215, https://doi.org/10.1016/j.enpol.2015.06.011. Rupert Way, Matthew C. Ives, Penny Mealy, J. Doyne Farmer, Empirically grounded technology forecasts and the energy transition, Joule, Volume 6, Issue 9, 2022, Pages 2057-2082, ISSN 2542-4351, https://doi.org/10.1016/j.joule.2022.08.009.
Ziegler, Micah S. and Trancik, Jessika E., Re-examining rates of lithium-ion battery technology improvement and cost decline, The Royal Society of Chemistry, Volume 14, Issue 4, 2021, Pages 1635-1651, ISSN 1754-5692, https://pubs.rsc.org/en/content/articlelanding/2021/ee/d0ee02681f. Max Wei, Sarah Josephine Smith, Michael D. Sohn, Non-constant learning rates in retrospective experience curve analyses and their correlation to deployment programs, Energy Policy, Volume 107, 2017, Pages 356-369, ISSN 0301-4215, https://doi.org/10.1016/j.enpol.2017.04.035.
Brown, Abby, Jeff Cappellucci, Emily White, Alexia Heinrich, and Emma Cost. 2022. Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2022. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-84263. https://www.nrel.gov/docs/fy23osti/84263.pdf. March 2024 percentages of charging equipment cost reductions for 2022–2027 and 2028–2032 (Table 7). Similarly, installation costs could decrease as installers continue to accumulate experience with charging projects and identify efficiencies, but installation costs are notorious for being site-specific (proximity to an existing transformer is a key consideration), and per-site costs could plausibly increase as low-hanging fruit continues to be picked. For these reasons, this analysis assumed no reductions in installation costs. The base-year installation costs were applied to all future years to generate future EVSE capital cost trajectories (Figure 19). Table 7. Estimated Average Annual Percentages of Equipment Cost Reductions by EVSE Technological Advancement Scenarios and Charger Type
EVSE Scenarios Business as Usual High Learning Rate L2 Chargers 2022–2027 2028–2032 (Action/ (Action/ No Action) No Action) 2.9%/2.8% 2.1%/1.7% 5.9%/5.7% 8.9%/8.6% 5.7%/3.4% 8.6%/5.1% DCFCs 2022–2027 2028–2032 (Action/ (Action/ No Action) No Action) 3.0%/2.7% 1.9%/1.8% 6.0%/5.4% 9.1%/8.2% 3.9%/3.7% 6.0%/5.6% Figure 19. Projected EVSE capital cost (combined equipment and installation cost) trajectories for 2021–2032: (a) No Action scenario and (b) Action scenario. Estimates for out-of-scope costs—including the strategies charging networks might take to account for utility, DER, operations and maintenance, and construction costs, as well as solutions to reduce the magnitude of these cost and time requirements—are the subject of forthcoming Argonne National Laboratory technical report, “Innovative Charging Solutions for Deploying the National Charging Network,” conducted in parallel with this electrification impact analysis. March 2024
https://doi.org/10.1109/MELE.2019.2908794.
iScience 25, no. 1 (2022): 103686, ISSN 2589-0042, https://doi.org/10.1016/j.isci.2021.103686.
Adoption and Power Consumption for the United States. National Renewable Energy Laboratory. NREL/TP-6A2071500. https://doi.org/10.2172/1459351.
Corridors,” Dryad, 3698578 bytes, June 2, 2022, https://doi.org/10.6086/D1BT3K
Commercial, and Residential End-use Sectors,” Version 1, August 21, 2020, https://doi.org/10.17632/rfnp2d3kjp.1.
https://doi.org/10.1016/j.joule.2022.08.009.
https://doi.org/10.1016/j.enpol.2017.02.036.