{"document":{"doc_id":16405,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record","date":"2008-10-22","url":"https://www.federalregister.gov/documents/2008/10/22/E8-25079/electric-power-generation-transmission-and-distribution-electrical-protective-equipment-limited","source_native_id":"E8-25079","status":"fetched","abstract":"On June 15, 2005, OSHA published a proposed rule to revise the general industry and construction standards for electric power generation, transmission, and distribution work and for electrical protective equipment. Public comments were received, a hearing was held, and the final posthearing briefs were due on July 14, 2006. The proposed general industry and construction standards for electric power generation, transmission, and distribution work included revised minimum approach distance tables. Those tables limit how close an employee (or a conductive object he or she is contacting) may get to an energized circuit part. After the rulemaking record on the proposal closed, the technical committee responsible for developing the tables in the consensus standards on which the proposal was based discovered what in their view was an error in their calculation of minimum approach distances for certain voltages. OSHA is reopening the record on this proposal to obtain comments related to the affected minimum approach distances. The record will remain open on this limited basis for 30 days.","action":"Notice of limited reopening of rulemaking record."},"dockets":["OSHA-S215-2006-0063"],"rins":["RIN 1218-AB67"],"related":[{"doc_id":10684,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.","date":"1986-05-31"},{"doc_id":10668,"source":"ria","org":"OSHA","doc_type":"regulatory_analysis","title":"Supporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA","date":"1987-10-23"},{"doc_id":10662,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 32;  Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)","date":"1990-06-12"},{"doc_id":10682,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.","date":"2003-02-14"},{"doc_id":10700,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013","date":"2003-02-14"},{"doc_id":10678,"source":"ria","org":"OSHA","doc_type":"regulatory_flexibility_analysis","title":"Supporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.","date":"2003-04-07"},{"doc_id":10672,"source":"ria","org":"OSHA","doc_type":"economic_analysis","title":"Supporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)","date":"2005-06-08"},{"doc_id":18249,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2005-06-15"},{"doc_id":18098,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing","date":"2005-10-12"},{"doc_id":15668,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Proposed Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing","date":"2009-09-14"},{"doc_id":131216,"source":"docket_item","org":"OSHA","doc_type":"review_record","title":"Office of Management and Budget. 2003. Circular A-4","date":"2014-04-01"},{"doc_id":11676,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment","date":"2014-04-11"},{"doc_id":11287,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2014-09-24"},{"doc_id":10390,"source":"fr_rule","org":"DEPARTMENT OF LABOR; Occupational Safety and Health Administration","doc_type":"Rule (administrative)","title":"Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections","date":"2015-10-05"}],"references":[{"citation_id":152835,"raw_reference":"ANSI/IEEE Standard 516-1987","cited_authors":"ANSI; IEEE","cited_year":"1987","cited_title":"ANSI/IEEE Standard 516-1987","cited_venue":"ANSI/IEEE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Supplementary Information, minimum approach distance principles","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":152836,"raw_reference":"Transmission Line Reference Book for 115 to 138 kV","cited_authors":"EPRI","cited_year":null,"cited_title":"Transmission Line Reference Book for 115 to 138 kV","cited_venue":"Electric Power Research Institute","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Supplementary Information, minimum approach distance principles","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":152837,"raw_reference":"Draft #9 of IEEE Standard 516","cited_authors":"IEEE","cited_year":null,"cited_title":"Draft revised IEEE Standard 516 (Draft #9)","cited_venue":"IEEE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Supplementary Information, Table 1 discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":152838,"raw_reference":"Draft #10 of IEEE Standard 516","cited_authors":"IEEE","cited_year":null,"cited_title":"Draft revised IEEE Standard 516 (Draft #10)","cited_venue":"IEEE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Supplementary Information, Table 1 discussion","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":152839,"raw_reference":"National Electrical Safety Code (NESC, ANSI C2)","cited_authors":null,"cited_year":null,"cited_title":"National Electrical Safety Code","cited_venue":"ANSI","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Supplementary Information, minimum approach distance principles","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}