SECY-22-0001: Enclosure 3 - Regulatory Analysis
Other documents for the same rulemaking
References: 13 extracted, 3 linked to papers
NRC and EPA, 1978. NUREG-0396 (U.S. Environmental Protection Agency 520/1-78-016), "Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants," December 1978
U.S. Environmental Protection Agency (EPA), "PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents," EPA-400/R-17/001, January 2017.
ANSI/ANS-15.16-2015, "Emergency Planning for Research Reactors," ANS, LaGrange Park, IL.
NRC, "Standard Review Plan for the Review and Evaluation of Emergency Plans for Research and Test Reactors," NUREG-0849, October 1983a.
NRC, "A Handbook for Value-Impact Assessment," NUREG/CR-3568 (PNL-4646), December 1983b.
Bureau of Labor Statistics (BLS), "SOC Code: Standard Occupational Classification Code," U.S. Department of Labor, January 2021a.
BLS, "Archived Consumer Price Index Supplement Files: March 2021 Historical CPI-U, Table 24, Historical Consumer Price Index for All Urban Consumers (CPI-U): U.S. City Average, All Items," U.S. Department of Labor, April 2021b.
NRC, "NRC Vision and Strategy: Safely Achieving Effective and Efficient Non-Light Water Reactor Mission Readiness," December 2016c.
NRC, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission," Draft Final Report, NUREG/BR-0058, draft Revision 5, January 28, 2020.
U.S. Office of Management and Budget (OMB) Circular No. A-4, "Regulatory Analysis," dated September 17, 2003 (OMB, 2003).
NRC, "Development of an Emergency Planning and Preparedness Framework for Small Modular Reactors," SECY-11-0152, October 28, 2011.
NRC, "Regulatory Guide 1.242, Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light-Water Reactors, and Non-Power Production or Utilization Facilities," Revision 0, 2022.
NRC, "Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities," Regulatory Guide 2.6, Revision 2, September 2017b.