Policy Replication

SECY-22-0001: Enclosure 3 - Regulatory Analysis

Regulatory impact analysis2023-06-26 · NRC · regulatory_analysis · NRC-2015-0225-0321
RIN 3150-AJ68 · Docket NRC-2015-0225

Other documents for the same rulemaking

2017-04-13 Federal RegisterEmergency Preparedness for Small Modular Reactors and Other New Technologies
2017-11-15 Federal RegisterEmergency Preparedness Requirements for Small Modular Reactors and Other New Technologies
2018-11-09 Regulatory impact analysisSECY-08-0103: Enclosure 3 - Proposed Rule: Regulatory Analysis; Emergency Preparedness for Small Modular Reactors and Other New Technologies
2020-05-12 Federal RegisterEmergency Preparedness for Small Modular Reactors and Other New Technologies
2020-05-12 Regulatory impact analysisRegulatory Analysis for the Proposed Rule: Emergency Preparedness for Small Modular Reactors and Other New Technologies
2020-05-29 Federal RegisterEmergency Preparedness for Small Modular Reactors and Other New Technologies
2020-07-21 Federal RegisterEmergency Preparedness for Small Modular Reactors and Other New Technologies
2023-11-16 Federal RegisterEmergency Preparedness for Small Modular Reactors and Other New Technologies
2023-11-16 Regulatory impact analysisRegulatory Analysis for Emergency Preparedness for Small Modular Reactors and Other New Technologies

References: 13 extracted, 3 linked to papers

Page 1Download these results: CSV · JSON
NRC and EPA, 1978. NUREG-0396 (U.S. Environmental Protection Agency 520/1-78-016), "Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants," December 1978
U.S. Environmental Protection Agency (EPA), "PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents," EPA-400/R-17/001, January 2017.
research reportNot linked to a paper · Section 2.1 Background · cited link
ANSI/ANS-15.16-2015, "Emergency Planning for Research Reactors," ANS, LaGrange Park, IL.
research reportNot linked to a paper · Section 2.1 Background
NRC, "Standard Review Plan for the Review and Evaluation of Emergency Plans for Research and Test Reactors," NUREG-0849, October 1983a.
NRC, "A Handbook for Value-Impact Assessment," NUREG/CR-3568 (PNL-4646), December 1983b.
research reportHandbook for value-impact assessment (1983) · Section 4.2.6 Labor Rates
Bureau of Labor Statistics (BLS), "SOC Code: Standard Occupational Classification Code," U.S. Department of Labor, January 2021a.
datasetNot linked to a paper · Section 4.2.6 Labor Rates · cited link
BLS, "Archived Consumer Price Index Supplement Files: March 2021 Historical CPI-U, Table 24, Historical Consumer Price Index for All Urban Consumers (CPI-U): U.S. City Average, All Items," U.S. Department of Labor, April 2021b.
datasetNot linked to a paper · Section 4.2.5 Cost/Benefit Inflators · cited link
NRC, "NRC Vision and Strategy: Safely Achieving Effective and Efficient Non-Light Water Reactor Mission Readiness," December 2016c.
government reportNot linked to a paper · Section 2 Statement of the Problem and Objective
NRC, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission," Draft Final Report, NUREG/BR-0058, draft Revision 5, January 28, 2020.
research reportNot linked to a paper · Section 4 Estimation and Evaluation of Costs and Benefits
U.S. Office of Management and Budget (OMB) Circular No. A-4, "Regulatory Analysis," dated September 17, 2003 (OMB, 2003).
government reportNot linked to a paper · Section 4.2.4 Discount Rates
NRC, "Development of an Emergency Planning and Preparedness Framework for Small Modular Reactors," SECY-11-0152, October 28, 2011.
government reportNot linked to a paper · Section 3.2 Alternative 2
NRC, "Regulatory Guide 1.242, Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light-Water Reactors, and Non-Power Production or Utilization Facilities," Revision 0, 2022.
government reportNot linked to a paper · Executive Summary
NRC, "Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities," Regulatory Guide 2.6, Revision 2, September 2017b.
government reportNot linked to a paper · Section 2.1 Background