{"document":{"doc_id":160334,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NTSB SS 15 01","date":"2023-09-15","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0725","source_native_id":"PHMSA-2011-0023-0725","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":2453759,"raw_reference":"Alder, D. and Beets, J. 2012. GIS-based Risk Analysis Simplifies Assessment Process. Pipeline & Gas Journal, March 2012. American Society of Mechanical Engineers (ASME). 2011. Review of Safety Considerations for Natural Gas Pipeline Block Valve Spacing. STP-PT-046. ASME Standards Technology,","cited_authors":"Alder, D. and Beets, J","cited_year":"2012","cited_title":"GIS-based Risk Analysis Simplifies Assessment Process","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453760,"raw_reference":"LLC. New York. -----. 2012a. Gas Transmission and Distribution Piping Systems (ASME B31.8-2012). ASME: New York. -----. 2012b. “Integrity Threat Classification,” in Gas Transmission and Distribution Piping Systems (ASME B31.8-2012), (ASME: New York), 5. -----. 2012c. “Terms, Definitions, and Acronyms,” in Gas Transmission and Distribution Piping Systems (ASME B31.8-2012), (ASME: New York), 35–41. -----. 2004. Managing System Integrity of Gas Pipelines (ASME B31.8S-2004). ASME: New York.","cited_authors":"LLC. New York. -----","cited_year":"2012a","cited_title":"Integrity Threat Classification","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453761,"raw_reference":"DOT (US Department of Transportation). 2014PHMSA’s State Pipeline Safety Program Lacks Effective Management and Oversight. AV-2014-041. DOT: Washington, DC.","cited_authors":null,"cited_year":null,"cited_title":"DOT (US Department of Transportation)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453762,"raw_reference":"Elliott, B. and Anderson, E. 2012. Intelligent Technology is Essential for Modern Integrity Management. Pipeline & Gas Journal, July 2012. Government Accountability Office (GAO). 2013. “Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response.” GAO-13-168. Washington,","cited_authors":"Elliott, B. and Anderson, E","cited_year":"2012","cited_title":"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453763,"raw_reference":"DC. http://www.gao.gov/assets/660/651408.pdf Interstate Natural Gas Association of America (INGAA). 2013. “Interacting Threats to Pipeline Integrity – Defined and Explained.” http://www.ingaa.org/File.aspx?id=20210 -----. 2012. “Report to NTSB on Development of Advanced In-Line Inspection Platforms for Use in Gas Transmission Pipelines.” http://www.ingaa.org/Filings/18021.aspx","cited_authors":"DC. http://www.gao.gov/assets/660/651408.pdf Interstate Natural Gas Association of America (INGAA)","cited_year":"2013","cited_title":"Interacting Threats to Pipeline Integrity – Defined and Explained","cited_venue":null,"cited_doi":null,"cited_url":"http://www.gao.gov/assets/660/651408.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453764,"raw_reference":"McCool, G. 2014. Implementing Projects for Enhancing Records, Data Governance. Pipeline & Gas Journal, January 2014.","cited_authors":"McCool, G","cited_year":"2014","cited_title":"Implementing Projects for Enhancing Records, Data Governance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453765,"raw_reference":"NACE (NACE International). 2008. Pipeline External Corrosion Direct Assessment Methodology. ANSI/NACE SP0502-2008. Houston, TX: NACE International. National Association of Pipeline Safety Representatives (NAPSR). 2014. “State IMP Inspection Survey.”","cited_authors":"NACE (NACE International)","cited_year":"2008","cited_title":"State IMP Inspection Survey","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453766,"raw_reference":"NTSB Safety Study National Pipeline Mapping System (NPMS). 2014. “NPMS Standards for Pipeline, Liquefied Natural Breakout Tank Farm Operator Submission.” https://www.npms.phmsa.dot.gov/Documents/Operator_Standards.pdf National Transportation Safety Board (NTSB). 2014. Columbia Gas Transmission Corporation Pipeline Rupture, Sissonville, West Virginia, December 11, 2012. PAR-14/01.","cited_authors":"NTSB Safety Study National Pipeline Mapping System (NPMS)","cited_year":"2014","cited_title":"NPMS Standards for Pipeline, Liquefied Natural Breakout Tank Farm Operator Submission","cited_venue":null,"cited_doi":null,"cited_url":"https://www.npms.phmsa.dot.gov/Documents/Operator_Standards.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453767,"raw_reference":"Washington, DC: NTSB. http://www.ntsb.gov/doclib/reports/2014/PAR1401.pdf -----. 2013. Rupture of Florida Gas Transmission Pipeline and Release of Natural Gas Near Palm City, Florida, May 4, 2009. PAB-13/01. Washington, DC: NTSB. http://www.ntsb.gov/doclib/reports/2013/PAB1301.pdf -----. 2011. Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and","cited_authors":"Washington, DC: NTSB. http://www.ntsb.gov/doclib/reports/2014/PAR1401.pdf -----","cited_year":"2013","cited_title":"Rupture of Florida Gas Transmission Pipeline and Release of Natural Gas Near Palm City, Florida, May 4, 2009","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/2014/PAR1401.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453768,"raw_reference":"Fire, San Bruno, California, September 9, 2010. PAR-11/01. Washington, DC: NTSB. http://www.ntsb.gov/doclib/reports/2011/PAR1101.pdf -----. 2003. Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico, August 19, 2000.","cited_authors":"Fire, San Bruno, California, September 9","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/2011/PAR1101.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453769,"raw_reference":"PAR-03/01. Washington, NTSB. http://www.ntsb.gov/doclib/reports/2003/PAR0301.pdf -----. 2002. Pipeline Rupture and Subsequent Fire in Bellingham, Washington, June 10, 1999.","cited_authors":"PAR-03/01. Washington, NTSB. http://www.ntsb.gov/doclib/reports/2003/PAR0301.pdf -----","cited_year":"2002","cited_title":"Pipeline Rupture and Subsequent Fire in Bellingham, Washington, June 10, 1999","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/2003/PAR0301.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453770,"raw_reference":"PAR-02/02. Washington, NTSB. http://www.ntsb.gov/doclib/reports/2002/PAR0202.pdf -----. 1998. Pipeline Rupture and Release of Fuel Oil into the Reedy River at Fork Shoals, South Carolina, June 1996.","cited_authors":"PAR-02/02. Washington, NTSB. http://www.ntsb.gov/doclib/reports/2002/PAR0202.pdf -----","cited_year":"1998","cited_title":"Pipeline Rupture and Release of Fuel Oil into the Reedy River at Fork Shoals, South Carolina, June 1996","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/2002/PAR0202.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453771,"raw_reference":"PAR-98/01. Washington, NTSB. http://www.ntsb.gov/doclib/reports/1998/PAR9801.pdf -----. 1996. Evaluation of Accident Data and Federal Oversight of Petroleum Product Pipelines.","cited_authors":"PAR-98/01. Washington, NTSB. http://www.ntsb.gov/doclib/reports/1998/PAR9801.pdf -----","cited_year":"1996","cited_title":"Evaluation of Accident Data and Federal Oversight of Petroleum Product Pipelines","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/1998/PAR9801.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453772,"raw_reference":"SIR-96/02. Washington, NTSB. http://www.ntsb.gov/doclib/safetyalerts/safetystudies/sir9602.pdf -----. 1995. Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire,","cited_authors":"SIR-96/02. Washington, NTSB. http://www.ntsb.gov/doclib/safetyalerts/safetystudies/sir9602.pdf -----","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/safetyalerts/safetystudies/sir9602.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453773,"raw_reference":"Edison, New Jersey, March 23, 1994. PAR-95/01. Washington, DC: NTSB. http://www.ntsb.gov/doclib/reports/1995/PAR9501.pdf Pipeline and Hazardous Materials Safety Administration (PHMSA). 2014a. “Annual Report Mileage for Natural Gas Transmission & Gathering Systems.” Accessed October 1, 2014. http://www.phmsa.dot.gov/portal/site/PHMSA/menuitem.6f23687cf7b00b0f22e4c6962d 9c8789/?vgnextoid=78e4f5448a359310VgnVCM1000001ecb7898RCRD.","cited_authors":"Edison, New Jersey, March 23","cited_year":"1994","cited_title":"Annual Report Mileage for Natural Gas Transmission & Gathering Systems","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/doclib/reports/1995/PAR9501.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453774,"raw_reference":"PHMSA. 2014b. “Cased Crossings & Guided Wave Ultrasonics.” Accessed October 1, 2014. http://primis.phmsa.dot.gov/gasimp/casedcrossings/index.htm.","cited_authors":"PHMSA","cited_year":"2014b","cited_title":"Cased Crossings & Guided Wave Ultrasonics","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/gasimp/casedcrossings/index.htm","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453775,"raw_reference":"NTSB Safety Study PHMSA. 2014c. “Gas Transmission Integrity Management: FAQs.” Accessed October 1, 2014. http://primis.phmsa.dot.gov/gasimp/faqs.htm.","cited_authors":"NTSB Safety Study PHMSA","cited_year":"2014c","cited_title":"Gas Transmission Integrity Management: FAQs","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/gasimp/faqs.htm","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453776,"raw_reference":"PHMSA. 2014d. Pipeline Safety: Request for Revision of a Previously Approved Information Collection—National Pipeline Mapping System Program (OMB Control No. 2137– 0596). Notice and request for comments. Federal Register, Vol. 79, no. 146.","cited_authors":"PHMSA","cited_year":"2014d","cited_title":"Pipeline Safety: Request for Revision of a Previously Approved Information Collection—National Pipeline Mapping System Program (OMB Control No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453777,"raw_reference":"PHMSA. 2013a. Gas Integrity Management Inspection Manual: Inspection Protocols with Results Forms. Accessed October 2014. https://primis.phmsa.dot.gov/gasimp/docs/Gas_IM_ProtocolForm_11_5_13.doc","cited_authors":"PHMSA","cited_year":"2013a","cited_title":"Gas Integrity Management Inspection Manual: Inspection Protocols with Results Forms","cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/gasimp/docs/Gas_IM_ProtocolForm_11_5_13.doc","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453778,"raw_reference":"PHMSA. 2013b. Integrated Inspection 101: Inspector’s Manual (II/DDRI-101). Washington,","cited_authors":"PHMSA","cited_year":"2013b","cited_title":"Integrated Inspection 101: Inspector’s Manual (II/DDRI-101)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453779,"raw_reference":"DC: PHMSA. PHMSA. 2013c. Transmission Integrity Management Progress Report to NAPSR. Washington,","cited_authors":"DC: PHMSA. PHMSA","cited_year":"2013c","cited_title":"Transmission Integrity Management Progress Report to NAPSR. Washington","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453780,"raw_reference":"DC: PHMSA. PHMSA. 2011a. Gas Transmission Integrity Management Progress Report. Washington, DC:","cited_authors":"DC: PHMSA. PHMSA","cited_year":"2011a","cited_title":"Gas Transmission Integrity Management Progress Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453781,"raw_reference":"PHMSA. PHMSA. 2011b. Pipeline Safety: Safety of Gas Transmission Pipelines. Advance notice of proposed rulemaking. Federal Register, Vol. 76, no. 165.","cited_authors":"PHMSA. PHMSA","cited_year":"2011b","cited_title":"Pipeline Safety: Safety of Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453782,"raw_reference":"PHMSA. 2008. Gas Integrity Management Inspection Manual: Inspection Protocols with Supplemental Guidance. Washington, DC: PHMSA.","cited_authors":"PHMSA","cited_year":"2008","cited_title":"Gas Integrity Management Inspection Manual: Inspection Protocols with Supplemental Guidance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453783,"raw_reference":"PHMSA. 2006a. Code of Federal Regulations. Title 49. “What definitions apply to this subpart?” Washington, DC: PHMSA.","cited_authors":"PHMSA","cited_year":"2006a","cited_title":"What definitions apply to this subpart?","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453784,"raw_reference":"PHMSA. 2006b. Code of Federal Regulations. Title 49. “What are the required reassessment intervals?” Washington, DC: PHMSA. Pipeline Open Data Standard (PODS). 2014. “What is the PODS Pipeline Data Model?” Accessed October 2014. http://www.pods.org/89/What%20is%20the%20PODS%20Pipeline%20Data%20Model %3F/ Pipelines and Informed Planning Alliance (PIPA). 2010. “Partnering to Further Enhance Pipeline Safety in Communities Through Risk-Informed Land Use Planning: Final Report of Recommended Practices.” http://primis.phmsa.dot.gov/comm/publications/PIPA/PIPAReport-Final-20101117.pdf","cited_authors":"PHMSA","cited_year":"2006b","cited_title":"What are the required reassessment intervals?","cited_venue":null,"cited_doi":null,"cited_url":"http://www.pods.org/89/What%20is%20the%20PODS%20Pipeline%20Data%20Model","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453785,"raw_reference":"Quereshi, A. and Wortman, M. 2012. Risk Based Placement of Block Valves in Transmission Gas Pipelines. Proceedings of the 2012 9th International Pipeline Conference, IPC2014,","cited_authors":"Quereshi, A. and Wortman, M","cited_year":"2012","cited_title":"Risk Based Placement of Block Valves in Transmission Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453786,"raw_reference":"Calgary, Alberta, Canada. NTSB Safety Study Research and Special Programs Administration (RSPA). 1999. Remotely Controlled Valves on Interstate Natural Gas Pipelines. Washington, DC: RSPA.","cited_authors":"Calgary, Alberta, Canada. NTSB Safety Study Research and Special Programs Administration (RSPA)","cited_year":"1999","cited_title":"Remotely Controlled Valves on Interstate Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453787,"raw_reference":"Sulfredge, C.D. 2007. Scoping Study on the Safety Impact of Valve Spacing in Natural Gas Pipelines. Oak Ridge, Tennessee: Oak Ridge National Laboratory.","cited_authors":"Sulfredge, C.D","cited_year":"2007","cited_title":"Scoping Study on the Safety Impact of Valve Spacing in Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453788,"raw_reference":"Westwood, S., Jungwirth, D., Nickle, R., Dewar, D. and Martens, M. 2014. In Line Inspection of Geotechnical Hazards. Proceedings of the 2014 10th International Pipeline Conference, IPC2014, Calgary, Alberta, Canada","cited_authors":"Westwood, S., Jungwirth, D., Nickle, R., Dewar, D. and Martens, M","cited_year":"2014","cited_title":"In Line Inspection of Geotechnical Hazards","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}