ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) BF C5 & C6 Stoves Stack Test 05/15-17/2012
Other documents for the same rulemaking
References: 10 extracted, 0 linked to papers
CLAYTON JOHNSON, Project Manager Email: CJohnson@maxxam.ca Phone# (905) 817-5769 ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Total cover pages: 1 Page 1 of 8 2 - 15 Air Compliance Testing Inc. Client Project #: 120501 Site Location: ACT
CLAYTON JOHNSON, Project Manager Email: CJohnson@maxxam.ca Phone# (905) 817-5769 ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Total cover pages: 1 Page 1 of 20 2 - 23 Air Compliance Testing Inc. Client Project #: 120501 Maxxam Job #: B275176 Report Date: 2012/06/08
PASS 1.797 T-DGM- 010 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 032012 Done By: MC / Date: 3/20/2012 10:29 Air Compliance Testing, Inc. (032012-Pre-Test Meter Console) 3/30/2012 4 - 38 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 1.838 T-DGM- 005 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 051112 Done By: JL / Date: 5/11/2012 11:57 Air Compliance Testing, Inc. (051112-Pre-Test Meter Console) 5/15/2012 4 - 41 Method 4 Pre-Test Meter Calculation Orifice Calibration Data Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
MTB- 010 Pump Number PMP- 010 Job Number: 031912 Done By: MC / Date: 3/19/2012 15:16 Air Compliance Testing, Inc. (031912-Meter Box Pre-Test Leak Check) 4/3/2012 4 - 42 Method 4 Pre-Test Meter Calculation Orifice Calibration Data Meter Box I.D: T - MTB - 010 Meter Box Serial Number: Standard Meter
PASS 1.922 T-DGM- 010 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 031912 Done By: MC / Date: 3/19/2012 15:16 Air Compliance Testing, Inc. (031912-Pre-Test Meter Console) 4/3/2012 4 - 44 Method 4 Pre-Test Meter Calculation Orifice Calibration Data Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 1.920 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 120507 Done By: KL / Date: 5/7/2012 16:09 Air Compliance Testing, Inc. (050712-Pre-Test Meter Console) 5/15/2012 4 - 47
MTB- 009 Pump Number PMP- 009 Job Number: 120501B Done By: PB / Date: 6/4/2012 11:21 Air Compliance Testing, Inc. (120501B-ALT-009 Post-Test Leak Check) 6/4/2012 4 - 48 Method 4 Post-Test Meter Calculation Orifice Calibration Data Meter Box I.D:
PASS 1.922 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 120501B Done By: PB / Date: 6/4/2012 11:21 Air Compliance Testing, Inc. (120501B-Post-Test Meter Console) 6/4/2012 4 - 50
MTB- 010 Pump Number PMP- 008 Job Number: 120501A Done By: PB / Date: 6/4/2012 09:53 Air Compliance Testing, Inc. (120501A-ALT-009 Post-Test Leak Check) 6/4/2012 4 - 51