TSCA 403 Final Rule Response to Comments
Other documents for the same rulemaking (all, by stage)
References: 10 extracted, 0 linked to papers
ATSDR. 1995. Multisite Lead and Cadmium Exposure Study with Biological Markers Incorporated. April 199 5. Colorado Department of Health, and ATSDR. 1992. Final Report: Clear Creek/Central City Mine Waste Exposure Study, Part I: Smuggler Mountain Site. September 1992.
Smuggler Mountain Technical Advisory Committee. 1993. Final Report. January 27, 1993. University of Cincinnati. 1996. Palmerton Lead Exposure Study. Final Report. October. University of Cincinnati. 1997. Leadville/Lake County Environmental Health Lead Study. Final Report. April 1997.
USEPA. 1992. Technical Review Workgroup for Lead (TRW). A TRW Report: Review of the
USEPA. 1993. Butte Priority Soils: Development of Preliminary Remediation Goals (PRGs) for Lead in Soils: Comparison of Paired Data Sets from the Environmental Health Lead Study and the Integrated Uptake/Biokinetic Model, Version 0.61. March.
USEP A. 1994a. Validation Strategy for the Integrated Exposure Uptake Biokinetic Model for Lead in Children. EPA/540/R-94/039.
USEP A. 1994b. Guidance Manual for the Integrated Exposure Uptake Biokinetic Model for Lead in Children. EP A/540/R-93/081.
USEPA, 1994c. Statistical Analysis of Data form the Madison County Lead Study and Implications for Remediation of Lead-Contaminated Soil. US Environmental Protection
USEPA, 1995. Seasonal Rhythms of blood lead levels: Boston, 1979-1983, USEPA September, 1995. EPA 747-R-94-003.
USEP A. 1996. Baseline Human Health Risk Assessment, California Gulch superfund Site,
Secondly, the HUD survey was not designed to coincide, either in geographic area or in time, with NHANES III, phase 2. It is not clear that there was much overlap in communities between the two studies. Also, the HUD survey was conducted from 1989 - 1990, whereas