{"document":{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0003","source_native_id":"EPA-HQ-OLEM-2025-2864-0003","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":1123044,"raw_reference":"1. AESO. 2019. “Annual Market Statistics Report” https://public.tableau.com/app/profile/market.analytics/viz/AnnualStatistics_1616185422 8350/Introduction Last updated May 13, 2025.","cited_authors":"1. AESO","cited_year":"2019","cited_title":"Annual Market Statistics Report","cited_venue":null,"cited_doi":null,"cited_url":"https://public.tableau.com/app/profile/market.analytics/viz/AnnualStatistics_1616185422","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123045,"raw_reference":"2. AESO. “Hourly Metered Volumes and Pool Price and AIL” https://www.aeso.ca/assets/Uploads/datarequests/Hourly_Metered_Volumes_and_Pool_Price_and_AIL.csv Accessed May 30, 2025.","cited_authors":"2. AESO. “Hourly Metered Volumes and Pool Price and AIL” https://www.aeso.ca/assets/Uploads/datarequests/Hourly_Metered_Volumes_and_Pool_Price_and_AIL.csv Accessed May 30","cited_year":"2025","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.aeso.ca/assets/Uploads/datarequests/Hourly_Metered_Volumes_and_Pool_Price_and_AIL.csv","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123046,"raw_reference":"3. AESO. 2016 “Historical Generation Data (CSD)” https://www.aeso.ca/market/marketand-system-reporting/data-requests/historical-generation-data Accessed May 30, 2025.","cited_authors":"3. AESO","cited_year":"2016","cited_title":"Historical Generation Data (CSD)” https://www.aeso.ca/market/marketand-system-reporting/data-requests/historical-generation-data Accessed May 30, 2025","cited_venue":null,"cited_doi":null,"cited_url":"https://www.aeso.ca/market/marketand-system-reporting/data-requests/historical-generation-data","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123047,"raw_reference":"4. BC Hydro. 2025. “Historical Transmission Data” https://www.bchydro.com/energy-inbc/operations/transmission/transmission-system/balancing-authority-load-data/historicaltransmission-data.html","cited_authors":"4. BC Hydro","cited_year":"2025","cited_title":"Historical Transmission Data","cited_venue":null,"cited_doi":null,"cited_url":"https://www.bchydro.com/energy-inbc/operations/transmission/transmission-system/balancing-authority-load-data/historicaltransmission-data.html","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123048,"raw_reference":"5. BPA. “Rolling 30 Days and Monthly History” https://transmission.bpa.gov/business/operations/paths/ Accessed May 30, 2025.","cited_authors":"5. BPA. “Rolling 30 Days and Monthly History” https://transmission.bpa.gov/business/operations/paths/ Accessed May 30","cited_year":"2025","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://transmission.bpa.gov/business/operations/paths/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123049,"raw_reference":"6. BPA. “VER* Generation and Total Load in The BPA Balancing Authority” https://transmission.bpa.gov/business/operations/wind/ Accessed May 30, 2025. 7. Government of Canada. 2022. “Historical Data on Electricity Consumption and Production in Quebec” https://open.canada.ca/data/en/dataset/bd6a1401-15db-438d9b8b-ff11af48064e Updated July 24, 2024.","cited_authors":"6. BPA. “VER* Generation and Total Load in The BPA Balancing Authority” https://transmission.bpa.gov/business/operations/wind/ Accessed May 30","cited_year":"2025","cited_title":"Historical Data on Electricity Consumption and Production in Quebec","cited_venue":null,"cited_doi":null,"cited_url":"https://transmission.bpa.gov/business/operations/wind/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123050,"raw_reference":"8. IESO. 2025. “Data Directory” https://www.ieso.ca/power-data/data-directory","cited_authors":"8. IESO","cited_year":"2025","cited_title":"Data Directory","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ieso.ca/power-data/data-directory","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123051,"raw_reference":"9. IESO. 2019. “Yearly Intertie Actual Schedule and Flow Report” https://reportspublic.ieso.ca/public/IntertieScheduleFlowYear/ Updated May 30, 2025.","cited_authors":"9. IESO","cited_year":"2019","cited_title":"Yearly Intertie Actual Schedule and Flow Report","cited_venue":null,"cited_doi":null,"cited_url":"https://reportspublic.ieso.ca/public/IntertieScheduleFlowYear/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123052,"raw_reference":"10. IESO. 2018. ”Hourly Demand Report” https://reports-public.ieso.ca/public/Demand/ Updated May 30, 2025.","cited_authors":"10. IESO","cited_year":"2018","cited_title":"”Hourly Demand Report” https://reports-public.ieso.ca/public/Demand/ Updated May 30, 2025","cited_venue":null,"cited_doi":null,"cited_url":"https://reports-public.ieso.ca/public/Demand/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123053,"raw_reference":"11. IESO. 2025. “Generator Output by Fuel Type Hourly Report” https://reportspublic.ieso.ca/public/GenOutputbyFuelHourly/ Updated May 30, 2025.","cited_authors":"11. IESO","cited_year":"2025","cited_title":"Generator Output by Fuel Type Hourly Report","cited_venue":null,"cited_doi":null,"cited_url":"https://reportspublic.ieso.ca/public/GenOutputbyFuelHourly/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123054,"raw_reference":"12. ISO-NE. 2025. “Energy, Load, and Demand Reports: Zonal Information” https://www.isone.com/isoexpress/web/reports/load-and-demand/-/tree/zone-info","cited_authors":"12. ISO-NE","cited_year":"2025","cited_title":"Energy, Load, and Demand Reports: Zonal Information","cited_venue":null,"cited_doi":null,"cited_url":"https://www.isone.com/isoexpress/web/reports/load-and-demand/-/tree/zone-info","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123055,"raw_reference":"13. ISO-NE. 2025. “Energy, Load, and Demand Reports: Historical Hourly Flows and Limits” https://www.iso-ne.com/isoexpress/web/reports/load-and-demand/-/tree/historical-hourlyflows-and-limits","cited_authors":"13. ISO-NE","cited_year":"2025","cited_title":"Energy, Load, and Demand Reports: Historical Hourly Flows and Limits","cited_venue":null,"cited_doi":null,"cited_url":"https://www.iso-ne.com/isoexpress/web/reports/load-and-demand/-/tree/historical-hourlyflows-and-limits","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123056,"raw_reference":"14. MISO. “Load, Generation, and Interchange API” https://dataexchange.misoenergy.org/api-details#api=load-generation-and-interchangeapi&operation=get-v1-real-time-date-interchange-net-actual Accessed May 30, 2025. U.S. Department of Energy Report on Strengthening U.S. Grid Reliability and Security","cited_authors":"14. MISO. “Load, Generation, and Interchange API” https://dataexchange.misoenergy.org/api-details#api=load-generation-and-interchangeapi&operation=get-v1-real-time-date-interchange-net-actual Accessed May 30","cited_year":"2025","cited_title":"U.S. Department of Energy Report on Strengthening U.S. Grid Reliability and Security","cited_venue":null,"cited_doi":null,"cited_url":"https://dataexchange.misoenergy.org/api-details#api=load-generation-and-interchangeapi&operation=get-v1-real-time-date-interchange-net-actual","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123057,"raw_reference":"15. NB Power. 2025. “System Information Archive” https://tso.nbpower.com/Public/en/system_information_archive.aspx Accessed May 30, 2025.","cited_authors":"15. NB Power","cited_year":"2025","cited_title":"System Information Archive","cited_venue":null,"cited_doi":null,"cited_url":"https://tso.nbpower.com/Public/en/system_information_archive.aspx","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123058,"raw_reference":"16. NYISO. 2002 “Internal and External Interface Limits and Flows” https://mis.nyiso.com/public/P-32list.htm Updated May 30, 2025.","cited_authors":"16. NYISO","cited_year":"2002","cited_title":"Internal and External Interface Limits and Flows” https://mis.nyiso.com/public/P-32list.htm Updated May 30, 2025","cited_venue":null,"cited_doi":null,"cited_url":"https://mis.nyiso.com/public/P-32list.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123059,"raw_reference":"17. NYISO. 2004 “Day-Ahead Markey Daily Energy Report\" https://mis.nyiso.com/public/P30list.htm Updated May 30, 2025 18. Stephen et al. 2022. “Clarifying the Interpretation and Use of the LOLE Resource Adequacy Metric” https://www.spp.org/documents/69303/lole%20metric.pdf U.S. Department of Energy Report on Strengthening U.S. Grid Reliability and Security","cited_authors":"17. NYISO","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://mis.nyiso.com/public/P30list.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123060,"raw_reference":"EO 14262 U.S. Department of Energy Report on Strengthening U.S. Grid Reliability and Security Available at (accessed on 5/27/2025): https://www.federalregister.gov/documents/2025/04/14/2025-06381/strengthening-the-reliabilityand-security-of-the-united-states-electric-grid U.S. Department of Energy For more information, visit: energy.gov/topics/reliability","cited_authors":null,"cited_year":null,"cited_title":"EO 14262 U.S. Department of Energy Report on Strengthening U.S. Grid Reliability and Security Available at (accessed on 5/27/2025): https://www.federalregister.gov/documents/2025/04/14/2025-06381/strengthening-the-reliabilityand-security-of-the-united-states-electric-grid U.S. Department of Energy For more information, visit: energy.gov/topics/reliability","cited_venue":null,"cited_doi":null,"cited_url":"https://www.federalregister.gov/documents/2025/04/14/2025-06381/strengthening-the-reliabilityand-security-of-the-united-states-electric-grid","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1123061,"raw_reference":"DOE/Publication Number • July, 7 2025 DOE/GO-000000-0000 ▪ Month Year","cited_authors":null,"cited_year":null,"cited_title":"DOE/Publication Number • July, 7 2025 DOE/GO-000000-0000 ▪ Month Year","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}