Policy Replication

Report to Congress on Competition in Wholesale and Retail Markets for Electric Energy [DCN SE03224]

Docket document2013-06-07 · EPA · report · EPA-HQ-OW-2009-0819-0623
RIN 2040-AG41, RIN 2040-AF77, RIN 2040-AF14, RIN 2040-AG54, RIN 2040-AG48, RIN 2040-AG23, RIN 2040-AF76 · Docket EPA-HQ-OW-2009-0819

Other documents for the same rulemaking

2009-10-29 Docket documentSteam Electric Power Generating Point Source Category: Final Detailed Study Report [EPA 821-R-09-008] [DCN 00003]
2009-10-29 Docket documentSupporting Statement for the Draft Questionnaire for the Steam Electric Power Generating Effluent Guidelines Information Collection Request [DCN 00001]
2009-10-29 Docket documentDraft Questionnaire for the Steam Electric Power Generating Effluent Guidelines [DCN 00002]
2009-10-29 Docket documentAgency Information Collection Activities; Proposed Collection; Comment Request; Proposed Information Collection Request for the Steam Electric Power Generating Effluent Guidelines; EPA ICR No. 2368.01, OMB Control No. 2040-NEW
2009-12-30 Docket documentLetter to Peter Silva, USEPA from Elizabeth E. Aldridge, Hunton and Williams L.L.P on behalf of the Utility Water Act Group (UWAG) [DCN SE00112]
2009-12-31 Docket documentLetter to Elizabeth E. Aldridge, Hunton and Williams, LLP from Peter S. Silva, Assistant Administrator, USEPA [DCN SE00113]
2010-03-09 Docket documentLetter to Ron Jordan, USEPA/Engineering and Analysis Division regarding USEPA Draft Steam Effluent Guidelines Questionnaire (November 17, 2009) [DCN SE00195]
2010-03-09 Docket documentLetter to Ron Jordan, USEPA/Engineering and Analysis Division regarding Comments on USEPA (February 1, 2010) [DCN SE00197]
2010-03-09 Docket documentEmail to Ron Jordan, USEPA/Engineering and Analysis Division regarding Steam Electric Power Generating EG - Proposed ICR Follow up Materials (January 20, 2010) [DCN SE00198]
2010-03-09 Docket documentLetter to Ron Jordan, USEPA/Engineering and Analysis Division regarding Ash Handling Systems Cost List (February 18, 2010) [DCN SE00200]
2010-03-09 Docket documentSupporting Statement for the Draft Questionnaire for the Steam Electric Power Generating Effluent Guidelines Information Collection Request (Part A) [DCN SE00205]
2010-03-09 Docket documentEmail to Ron Jordan, USEPA (February 19, 2010) [DCN SE00191]
2010-03-09 Docket documentEmail to Defenders of Wildlife, Sierra Club, Environmental Integrity, Earth Justice, and Natural Resources Defense Council [DCN SE00192]
2010-03-09 Docket documentEmail to Utility Water Act Group, American Public Power Association, and Edison Electric Institute [DCN SE00193]
2010-03-09 Docket documentEmail to Ron Jordan, USEPA dated February 3, 2010 [DCN SE00199]
2010-03-09 Docket documentAgenda and Example Flue Gas Desulfurization (FGD) Diagram for Discussion Between USEPA and Utility Water Act Group (UWAG) [DCN SE00201]
2010-03-09 Docket documentMemorandum to Steam Electric Record [DCN SE00204]
2010-03-09 Docket documentRon Jordan and Jezebele Alicea (February 25, 2010) [DCN SE00203]
2010-03-09 Docket documentEmail to Ron Jordan, US EPA (January 22, 2010) [DCN SE00190]
2010-03-09 Docket documentMemorandum to Ron Jordan, USEPA [DCN SE00206]
2010-03-09 Docket documentAgency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; Questionnaire for Steam Electric Power Generating Effluent Guidelines (NEW); EPA ICR No. 2368.01, OMB Control No. 2040-NEW
2013-06-07 Regulatory impact analysisRegulatory Impact Analysis For EPA’s Proposed RCRA Regulation Of Coal Combustion Residues (CCR) Generated by the Electric Utility Industry [DCN SE02969]
2013-06-07 Regulatory impact analysisTechnical Support Document: Calculating Benefit Per-Ton Estimates. Final Ozone NAAQS regulatory impact analysis [DCN SE03161]
2013-06-07 Regulatory impact analysisRegulatory Impact Analysis of the Clean Air Mercury Rule (EPA-452/R-05-003) [DCN SE03159]
2013-06-07 Regulatory impact analysisRegulatory Impact Analysis for the Industrial Boilers and Process Heaters NESHAP: Final Report (EPA-452/R-04-0020) [DCN SE03156]
2013-06-07 Regulatory impact analysisRegulatory Impact Analysis for the Proposed Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE03170]
2013-06-07 Regulatory impact analysisFinal Regulatory Analysis: Control of Emissions from Nonroad Diesel Engines (EPA420-R-04-007) [DCN SE03157]
2013-06-07 Regulatory impact analysisQuality Assurance Project Plan (QAPP) for Economic Impact and Benefits Analysis for Steam Electric Rulemaking [DCN SE03376]
2013-06-07 Regulatory impact analysisList of Rulemaking Cost and Economic Impact Files: Steam Electric Effluent Guidelines Rulemaking [DCN SE03351]
2013-06-07 Docket documentEconomic Assessment of Damage Related to the Eagle Mine Facility [DCN SE03117]
2013-06-07 Docket documentRegulatory Impact Analysis for USEPA’s Proposed RCRA Regulation of Coal Combustion Residues (CCR) Generated by the Electric Utility Industry [DCN SE03168]
2013-06-07 Docket documentDocument submitted to initiate E.O. 12866 review - Steam Electric ELG NPRM FRN [DCN SE03884]
2013-06-07 Docket documentDocument submitted to conclude E.O. 12866 review - SteamElectricELG NPRM FRN - [DCN SE03958]
2013-06-07 Docket documentDocument of Changes Made During OMB Review Under E.O. 12866 - SteamElectric ELG NPRM FRN [DCN SE03972]
2013-06-07 Docket documentFishbase (version 07/2009) [DCN SE03047]
2013-06-07 Docket documentGuidance for Assessing Chemical Contaminant Data for Use in Fish Advisories, Volume 1 Fish Sampling Analysis, Third Edition [DCN SE01922]
2013-06-07 Docket documentDraft Human and Ecological Risk Assessment of Coal Combustion Wastes [DCN SE01834]
2013-06-07 Docket documentThe use of willingness-to-pay approaches in mammal conservation [DCN SE03191]
2013-06-07 Docket documentUsing the Basic Auto-validation Model to Assess the Effect of Environmental Quality on Texas Recreational Fishing Demand: Welfare Estimates [DCN SE03022]
2013-06-07 Docket documentNOAA National Marine Fisheries Service Southwest Regional Office, GIS Data [DCN SE03091]
2013-06-07 Docket documentSouthwest Fisheries Science Center Fisheries Biology Publications Database [DCN SE03134]
2013-06-07 Docket documentFinal report: Health Study to Assess the Human Health Effects of Mercury Exposure to Fish Consumed from the Everglades [DCN SE03152]
2013-06-07 Docket documentSTORET, EPA’s largest computerized environmental data system [DCN SE03160]
2013-06-07 Docket documentNational Recommended Water Quality Criteria [DCN SE03175]
2013-06-07 Docket documentNorth Florida Ecological Services Office Loggerhead Sea Turtle Caretta caretta [DCN SE03180]
2013-06-07 Docket documentNew Hampshire Clean Air Project Final Report Prepared for New Hampshire Public Utilities Commission [DCN SE02011]
2013-06-07 Docket documentFinal Site Visit Notes: Dominion Resources' Chesterfield Power Station [DCN SE00076]
2013-06-07 Docket documentMay 2011 National Industry-Specific Occupational Employment and Wages Estimates NAICS 221100 Electric Power Generation, Transmission and Distribution [DCN SE03221]
2013-06-07 Docket documentState Tax Rate Comparisons [DCN SE03229]
2013-06-07 Docket documentPopulation Estimates. National Population Datasets [DCN SE03241]
2013-06-07 Docket documentSustainable Financing Strategies [DCN SE03257]
2013-06-07 Docket documentAnnual Energy Outlook 2011 (AEO2011) [DCN SE03249]
2013-06-07 Docket documentEPA’s IPM Base Case v. 4.10 [DCN SE03265]
2013-06-07 Docket documentPlant Comments on Draft Kinder Morgan (Jackson Power Facility) Site Visit Notes [DCN SE00600]
2013-06-07 Docket documentFinal Engineering Site Visit Report for Georgia Power's Plant Yates [DCN SE02053]
2013-06-07 Docket documentNon CBI - Final Site Visit Notes: Appalachian Power Company's Mountaineer Plant [DCN SE02071]
2013-06-07 Docket documentNotes from Site Visit at the AES Cayuga Generation Plant on May 21, 2007 [DCN SE02061]
2013-06-07 Docket documentFinal Site Visit Notes: Tennessee Valley Authority’s Paradise Fossil Plant [DCN SE02101]
2013-06-07 Docket documentUWAG Draft Sampling Instructions for USEPA Collision Cell ICP-MS Methods Study [DCN SE00491]
2013-06-07 Docket documentPlant Comments to Belews Creek Sampling Episode Report, Revised SER [DCN SE01377]

References: 18 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
PJM / Northern Illinois Region October 18, 2005 Report Date Illinois Citizens utility Board Sponsor Author/Contractor Synapse Energy Economics / Ezra Hausman, Paul Peterson, David
research reportNot linked to a paper · refsec
White, and Bruce Biewald Comparison of baseline capacity revenues (derived from historical Model/Method market data) with proposed RPM PJM price Determine potential wealth transfer effects of proposed Reliability Scope of Inquiry Pricing Model (RPM) by examining capacity revenues that might accrue to Exelon’s Nuclear facilities in Northern Illinois if RPM is implemented. June 2004 – June 2005 Period Studied At the target RPM price, Exelon’s nuclear plants in northern Illinois Conclusion stand to gain almost $390 million in additional capacity revenues, compared to the 2004 capacity market price, at ratepayers’ expense. At the maximum RPM price, these plants would receive a $1.2 billion increase in capacity revenues. Web Reference At PJM’s target price, RPM would amount to a rate increase for PJM ratepayers as a whole of over $5 billion every year, paid mostly to existing base load generation. http://www.synapse-energy.com/Downloads/SynapseReport.200510.IL-CUB.RPM-Study--Higher-Costs-Windfall-Profits-forExelon.04-20.pdf The Benefits and Costs of Wisconsin Utilities Participating in Midwest ISO Energy Markets Wisconsin Region March 26, 2004 Report Date
research reportNot linked to a paper · refsec · cited link
MISO Sponsor Author/Contractor Science Applications International Corporation Production Cost/ Power Flow Modeling: PROMOD IV Model/Method Evaluates proposed financial transmission right allocations and overall Scope of Inquiry impact of market participation on Wisconsin consumers. 2005 Calendar Year Period Studied Wisconsin and Michigan Upper Peninsula customers to save $51 Conclusion million annually in wholesale power costs, net of costs of participating in markets. http://www.midwestmarket.org/publish/Document/573257_ffe0fcee0f_Web Reference 7f570a531528/_.pdf?action=download&_property=Attachment See comments of Wisconsin Load Serving Entities to Draft EPAct 2005 Alternate Views Section 1815 Report on Competition – FERC Docket AD05-17 – 6/26/06
journal articleNot linked to a paper · refsec · cited link
PJM Interconnection Region June 3, 2003 Report Date Sponsor Author/Contractor Synapse Energy (Biewald, Steinhurst, White, Roschelle) Model/Method estimates and compares two sets of annual prices: (1) the actual wholesale power costs (WPC) in the PJM market, and (2) prices in a scenario with economic regulation continued from the mid-1990s to today so that the generation service costs (GSC) are the unbundled generation portion of the pre-restructuring cost-of-service rates Scope of Inquiry To illuminate the effect of restructuring on prices in the PJM interconnection. 1999-2003 Period Studied Conclusion Web Reference while PJM deregulated costs fluctuate year-to-year, on average, the wholesale power costs over the five year period 1999 to 2004 have been lower than the indexed generation service costs. http://www.pjm.com/documents/downloads/reports/synapse-reportpjm-electricity-prices.pdf Erecting Sandcastles From Numbers: The CAEM Study of Restructuring Electricity Markets Region Dec. 3, 2003 Report Date
research reportNot linked to a paper · refsec · cited link
NRECA Sponsor Author/Contractor Christiansen Associates (Moray, Kirsch, Braithwait, Eakin) Analysis of CAEM study assumptions/ inputs Model/Method To review and critique the Center for Advancement of Energy Markets’ (CAEM) Scope of Inquiry study entitled Estimating the Benefits of Restructuring Electricity Markets: An Application to the PJM Region (Sept. 22, 2003) (hereinafter CAEM Study). Period Studied Conclusion 1997-2002 The CAEM Study’s quantitative results fail to demonstrate any relationship between these price changes and the economic effects of restructuring. Web Reference http://www.ksg.harvard.edu/hepg/Papers/Christensen.crit.restruct.mkts.in.pjm.03Dec.03.pdf See below: Estimating the Benefits of Restructuring Electricity Markets: An Application to the PJM Region, available at http://www.caem.org/website/pdf/PJM.pdf Alternate Views Market Simulation –
research reportNot linked to a paper · refsec · cited link
GE MAPS Scope of Inquiry Estimates the impact of implementing a Northeast RTO on regional spot market prices in the near term. Stephen Stoft Website Library: Period Studied Simulation year: 2001 Carnegie Mellon Electric Industry Center (CEIC): http://wpweb2.tepper.cmu.edu/ceic/publications.htm Conclusion Books Net Benefits of $299 million. RICHARD F. HIRSH, POWER LOSS: THE
research reportNot linked to a paper · refsec · cited link
ELECTRIC UTILITY SYSTEM (MIT Press 1999). $188 to PJM SALLY HUNT, MAKING COMPETITION WORK IN ELECTRICITY (Wiley Publishing 2002). <$22> to NYISO STEVEN STOFT, POWER SYSTEM ECONOMICS:
research reportNot linked to a paper · refsec
DESIGNING MARKETS FOR ELECTRICITY (IEEE Press, Wiley-Interscience 2002). $96 to NE Assessing Short Run Benefits from a Combined Northeast Market Northeast Region October 23, 2001 Report Date
research reportNot linked to a paper · refsec
October, 2003 Sponsor CAEM This analysis shows that prices under long-term contracts were somewhat lower than short-term prices in MISO and SERC, but not in NYISO. The short-term price changes are reflected in sales under long-term contracts. These changes may occur because some long-term contracts use indexed prices (i.e., short term published reference prices). Author/Contractor It is difficult to draw definite conclusions on prices with only a quarter’s worth of data. Furthermore, organized markets are evolving and will include capacity markets that could provide stronger price signals for long-term investment. R. Sutherland, CAEM Model/Method A BIBLIOGRAPHY OF PRIMARY INFORMATION Measures decline in electricity prices during restructured period. ON ELECTRIC INDUSTRY
research reportNot linked to a paper · refsec
RESTRUCTURING IN THE U.S. Scope of Inquiry Estimates benefits of restructuring the electricity market in the PJM region. The process of understanding the ins and outs of restructuring markets for electricity and transmission in the U.S. has been running full bore since the early 1990s. Accordingly, a large number of documents have been published intending to explain the basic engineering, economic and regulatory theories that support restructuring ideas. The intended audience of these studies has been various – from state regulators and legislators, to academics, public power managers, and the general public. Period Studied The Task Force members have not attempted to generate another primer on restructuring as part of its competition study. Instead, the Task Force refers the interested reader to a variety of sources that will allow him/her to learn more about the subjects that are of the most interest. 1997-2002 Conclusion Ultimate customers in the PJM region saved about $3.2 billion in 2002 from current restructuring efforts
research reportNot linked to a paper · refsec
Energy, Energy Information Administration, The Changing Structure of the Electric Power Industry 2000: An Update (October, 2000), available at http://www.eia.doe.gov/cneaf/electricity/chg_stru_update/ Region Northeast William W. Hogan, Competitive Electricity Market Design: A Wholesale Primer (December, 1998) (working paper), available at http://stoft.com/metaPage/lib/Hogan-1998-Primer.pdf Report Date William W. Hogan, Market Design and Electricity Restructuring (November 1, 2005) (presentation at the Association of Power Exchanges 2005 Annual Conference in Orlando FL), available at http://ksghome.harvard.edu/~whogan/hogan_apex_110105.pdf
research reportNot linked to a paper · refsec · cited link
April, 2002 Sponsor PJM Paul L. Joskow, Restructuring, Competition, and Regulatory Reform in the U.S. Electricity Sector, J.
research reportNot linked to a paper · refsec
ECON. PERSPECTIVES 11(3), at119-38. Author/Contractor On-Line Libraries of Electric Industry Restructuring Documents: Model/Method http://www.ksg.harvard.edu/hepg/papers.htm Mirant Study* Region Report Date Sponsor Author/Contractor Northeast September 2001 Mirant Energy and Environmental Analysis, Inc. Model/Method Scope of Inquiry Period Studied Conclusion Statistical / econometric analysis using historic prices and flows. Looked at unconstrained transmission to determine correlation between prices. Assumes centralized dispatch would eliminate measured uneconomic flows. Potential efficiency benefits that could be achieved by creating a single market for electricity in the Northeast. Model does not address net costs of establishing/operating a single Northeast RTO. 6/00-12/00 Net benefit of $440 million. $76 to PJM, $256 to NYISO, $108 to NE ISO. * Not publicly available. Review based on secondary references. Competition Has Not Lowered U.S. Industrial Electricity Prices
journal articleNot linked to a paper · refsec · cited link
Connecticut, Massachusetts, Maine, New Hampshire, New York, and Region Rhode Island 2005 (Published in the Electricity Journal, Vol. 18, No. 2 (2005) at Report Date 52-61) Jay Apt Sponsor Author/Contractor Jay Apt, Carnegie Mellon University Used EIA price data to perform regression analysis on prices before Model/Method and after competition. Examines the effect of restructuring on prices paid by US industrial Scope of Inquiry customers for electricity 1990-2004 Period Studied Conclusion Competition does not produce statistically significant price effects – rates in all states studied other than Maine increased an average of .8 percent per year prior to competition and they increased by 2 percent per year after competition. Web Reference http://wpweb2.tepper.cmu.edu/ceic/papers/ceic-05-01.asp Economic Assessment of AEP’s Participation in PJM Region Report Date Sponsor Author/Contractor Model/Method Scope of Inquiry Period Studied Conclusion
journal articleNot linked to a paper · refsec · cited link
PJM combined with AEP December, 2003 Cambridge Energy Research Associates Quantifies the costs and benefits of AEP’s integration into PJM markets. $245 M in 2004 declining to $188M in 2008 Economic and Reliability Assessment of a Northeastern RTO
research reportNot linked to a paper · refsec
NYISO, ISO-NE Region August 23, 2002 Report Date
research reportNot linked to a paper · refsec
GE MAPS Model/Method Assesses wholesale electricity market impacts and organizational Scope of Inquiry impacts of establishing a Northeastern RTO (NERTO), including expected costs of implementation, savings from market efficiencies, savings from operational consolidation. Period Studied $220M/yr in 2005 Conclusion $150M/yr in 2010
research reportNot linked to a paper · refsec
STUDIES OF BENEFITS IN THE NORTHWEST Bonneville Power Administration Grid West Benefit Assessment for Decision Point 2 Northwest US Region August 4, 2005 Report Date Bonneville Power Administration Sponsor Author/Contractor Internal Bonneville Power Administration staff report Model/Method Partially based on modeling conducted by Grid West (see “Estimated Benefits of Gri derive benefits of control area consolidation and economic redispatch. Other analyti common regulation, reliability improvements, economic reserve markets, increased t model), etc. Scope of Inquiry Potential benefits of adopting proposed Grid West design as compared with status qu Period Studied Various – primarily examined 1 year historical period. Conclusion Reliability Benefits: $27 - $62 million annually Increased Transmission Capacity: $9 to $15 million annually
research reportNot linked to a paper · refsec