Specific Site Assessment for Coal Combustion Waste Impoundments at Duke Energy Indiana (DEI) Gibson Generating Station - DCN SE05028
Other documents for the same rulemaking
References: 5 extracted, 0 linked to papers
Bennett, Williams, & Blattert, Inc. (1990). Boring Logs for East Ash Ponds, January, presented in Project Specifications for Ash Pond Phase I & Settling Basin.
Fuller, Mosbarger, Scott & May (1999). “Report of Geotechnical Analysis and Seepage
Design, Gibson, Station FGD Landfill Expansion,” prepared for PSI Energy, December 13. Indiana Department of Natural Resources Division of Water (DNR) (2001). General Guidelines for New Dams and Improvements to Existing Dams in Indiana. January. Patriot Engineering and Environmental Co., LLC (Patriot) (1999). “Report of Geotechnical Engineering Investigation Slope Stability Analysis of Proposed Ash Pond Addition
Phase III,” prepared for Cinergy Corporation, April 19. Sargent & Lundy (1971). Design drawings for Gibson Station including Revisions, prepared for Public Service Indiana. Revisions dated later. Sargent & Lundy (1980). “Response to Request for Lake Design Information,” prepared for Public Service Indiana, February 11. Sargent & Lundy (2008). “Gibson Generating Station 2008 Pond Examination, SL-009728”, prepared for Duke Energy Indiana, November 21. U.S. Army Corps of Engineers (1979). “Recommended Guidelines for Safety Inspections of Dams. (ER 1110-2-106).” September.
Washington, DC Figure 1 May 2010 092880 Asaeaamant of Dam Sarvty of Coal Combustion Wasta DEl Gibson Stallon