Damage Case Compendium Technical Support Document, Volume IIb Part One: Potential Damage Cases - DCN SE04460
Other documents for the same rulemaking
References: 510 extracted, 0 linked to papers
ICF (2010) Rationale: Potential Damage. <Groundwater exceedances of primary and secondary
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #12, Environmental Integrity Project, EarthJustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #12. ICF, 10/2010. TVA (No date, presumably 2009) According to TVA Inspector General (2011), for the first quarter of 2008, Permit #073-0041 required that the Dry Ash Stack be tested for seven constituents. The permit was then modified, which increased the number of constituents to 12. Semiannual testing was required for the first half of calendar year 2008 and then switched to quarterly to determine baseline data for a new well. Comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211): “This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria. Allegations in the Reference Document also claim Damage to Little Bayou Creek and the Ohio River but provide no surface water sampling or scientific studies of these water bodies to support the claim.” IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 TVA (2009a): TVA Disposal Facility Assessment: Phase 1 Plant Summary, Shawnee Fossil Plant (SHF) (June 2009). Accessed Online May 2012. http://www.tva.gov/power/stantec/ky/rpt_005_appndx_c_shf_171468118.pdf
TVA (2009): Submission from TVA to Richard Kinch, USEPA, Re: Request for Information under
CERCLA Section 104(e) for Ash Management Units (March 25, 2009). Accessed Online May 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys/tva-fossil.pdf Quarles and Segall (2010): Slow Motion Spills: CCW and Water in Kentucky, Sierra Club, Kentucky Waterway Alliance, and Global Environmental, LLC, 2010. Accessed Online May 2012. http://kentucky.sierraclub.org/resources/Environmental_Research/Coal_Combustion_Waste_and_Water_I n_KY_042110.pdf Risky Business (2011): Risky Business: Coal Ash Threatens America’s Groundwater Resources at 19 More Sites. Environmental Integrity Project Report, Dec. 13, 2011. EPA-HQ-RCRA-2011-0392-0259. Accessed Online May 2012. http://www.environmentalintegrity.org/documents/121311EIPThirdDamageReport.pdf
EIP et al., (2013): Closing the Floodgates: How the Coal Industry is Poisoning Our Water and How We Can Stop It, Waterkeeper Alliance, Environmental Integrity Project, Clean Water Action, Earthjustice, Beyond Coal, and Sierra Club, July 23, 2013. Accessed Online August 2013. http://www.environmentalintegrity.org/news_reports/documents/2013_07_23_ClosingTheFloodgatesFinal.pdf
TVA Inspector General (2011): Final Report – Inspection 2009-12991 – TVA's Groundwater Monitoring at Coal Combustion Products Disposal Areas, TVA Office of the Inspector General Inspection Report, June 21, 2011. Accessed Online November 2012. http://oig.tva.gov/reports/PDF/11rpts/2009-12991.pdf
TVA (2005): NOxOUT Selective Noncatalytic Reduction Demonstration, Shawnee Fossil Plant - Unit 1, West Paducah, Kentucky, Final Environmental Assessment, Project Number: 2005-44, Tennessee Valley
Authority, April 2005. Accessed Online December 2012. http://www.tva.gov/environment/reports/shawnee/ea.pdf
EIP (2011): Petition for objection to Tennessee Valley Authority Title V Permit No. V-09-002 Rl for the operation of the Shawnee Fossil Plant in West Paducah, Kentucky, Environmental Integrity Project and the Southern Alliance for Clean Energy, submitted to the Administrator of the U.S. Environmental Protection Agency, February 28, 2011. Accessed Online December 2012. http://www.epa.gov/region7/air/title5/petitiondb/petitions/shawnee_petition2011.pdf Carey and Stickney (2005): Groundwater Resources of McCracken County, Kentucky, Daniel I. Carey and John F. Stickney, County Report 79, Series XII, Kentucky Geological Survey, University of
Kentucky, 2004. Accessed Online December 2012. http://www.uky.edu/KGS/water/library/gwatlas/McCracken/McCracken.htm Hopkins (1966): The Fresh-Saline Water Interface in Kentucky, H.T. Hopkins, U.S. Geological Survey, Kentucky Geological Survey, University of Kentucky, in cooperation with United States Geological
Survey, Department of the Interior, 1966. Accessed Online December 2012. http://kgs.uky.edu/kgsweb/download/wrs/SALINE.PDF IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Free, et al., (1957): Geology and Ground-Water Resources of the Paducah area, Kentucky. H. L. Free, Jr., W. H. Walker, and L. M. MacCary, in cooperation with the Agricultural and Industrial Development
Board, Commonwealth of Kentucky, Geologic Survey Water Supply Paper 1417, 1957. Accessed Online December 2012. http://pubs.usgs.gov/wsp/1417/report.pdf Clausen et al., (1995): Redacted Final Report on Drive-Point Profiling of the Northwest Plume and Analysis of Related Data, Paducah Gaseous Diffusion Plant, J.L. Clausen, J.L. Zutman, D.A. Pickering, and N.D. Farrow, Prepared by Environmental Management and Enrichment Facilities, Kevil, Kentucky 42053, Document Number: KY/ER-66, April 1995. Accessed Online December 2012. http://www.paducaheic.com/media/44982/I-04613-0032a-ARI24.PDF Clausen and Richards (1994): Treatability Studies Using Iron Filings to Remediate Trichloroethylene and
KY/ER-51, Environmental Restoration: Paducah ER WM, February 1994. Accessed Online December 2012. http://www.paducaheic.com/media/38622/I-00111-0015-GRC01.PDF
TVA (No date, presumably 2009): TVA’s Conversion of Wet Ash and Gypsum to Dry Storage. TVA. Accessed Online August 2014. http://www.tva.gov/news/Kingston/dry_ash.pdf Focused Feasibility Study (2010): Focused Feasibility Study for the Southwest Groundwater Plume Volatile Organic Compound Sources (Oil Landfarm and C-720 Northeast and Southeast Sites) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky, DOE/LX/07-0186&D2/R2. Prepared for the U.S. Department of Energy Office of Environmental Management, Environmental Management Activities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky, June 2010 (Revised July 2010). Accessed Online December 2012. http://latakentucky.com/PublicDocuments/SW%20Plume%20FFS%20D2R2/SW%20Plume%20FFS%20 D2%20R1%20CLEAN%20with%20Replacement%20Pages.pdf Significant Differences to the ROD (2010): Explanation of Significant Differences to the Record of Decision for the Interim Remedial Action of the Northwest Plume at the Paducah Gaseous Diffusion
Kentucky, LLC, for the U.S. Department of Energy Office of Environmental Management, December 2010. Accessed Online December 2012. http://www.epa.gov/superfund/sites/rods/fulltext/e2011040003786.pdf O’Brian & Gere (2013): Dam Safety Assessment of CCR Impoundments, TVA Shawnee Fossil Power
Plant, Final Report. O’Brian & Gere, February 4, 2013. Accessed Online July 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/index.htm#T IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 PTb18. Spurlock Power Station, Eastern Kentucky Power Cooperative (EKPC), Maysville, Mason County, Kentucky Type: Landfill and Surface Impoundment. Background and Description: The Spurlock Power Station is a 1,557 nameplate generation capacity facility,329 located in Maysville, Kentucky. The Station has disposed of coal combustion residual (CCR) from the Eastern Kentucky Power Cooperative (EKPC)330 in a landfill since the 1970s.331 The landfill was permitted as an “inert landfill” in 1979 and a construction/operation permit was issued in 1982 and renewed in 1996.332 It is unknown if a liner is present at the original phases, however a 389 acre expansion in 1996 was lined with two feet of clay.333 A 57-acre, 1976-constructed bottom ash pond with a capacity of 1,750,000 cubic yards is also present at Spurlock Station.334 The site is located approximately one mile from the Ohio River, over Quaternary Ohio River alluvium and glacial outwash. The landfill is located on Upper Ordovician-age limestone and shale of the Outer Bluegrass structural dome and The Plant consists of the following generation units, with their nameplate/net generating capacity and their corresponding commissioning dates: Unit 1: 358/325 MW (1977); Unit 2: 592/525 MW (1981); Unit 3: 329/268
MW (2005), and Unit 4: 278/278 MW (2009). Units 3 and 4 use circulating fluidized bed technology (http://www.ekpc.coop/pressreleases/2009%20press%20releases/2009-04-01_Spurlock4_commercial_start.pdf), burning high-sulfur bituminous coal from Kentucky. The gross calorific value of this high-ash (20%) coal is 10,400
BTU/lb (http://www.alstom.com/Global/Power/Resources/Documents/Brochures/spurlock-station-4-datasheet.pdf). The boiler technology provides Spurlock Unit 4 with the capability to fire a wide range of coals and up to 20% cofiring of petroleum coke, biomass, and approximately five million tires per year. As part of an innovative four-year project to study using switchgrass, in December 2008 University of Kentucky and EKPC demonstrated switchgrass’ potential as an alternative fuel to generate electricity at the Spurlock Station. The switchgrass was mixed with the coal feedstock, replacing 1 to 2 percent of the coal normally used (http://www.kentuckycleanfuels.org/resources/fuelsandtechnologies/powerplant.htm). The Eastern Kentucky Power Cooperative (EKPC) is a not-for-profit generation and transmission electric utility with headquarters in Winchester, Ky. Currently in receipt of fly ash and FGD gypsum.
RCRA Permit # 081-00005. According to KPEC’s comment to the October 2011 NODA (EPA-HQ-RCRA2011-0392-0209), the total permitted area of the Spurlock Landfill is 389 acres, of which 177 acres are designated for fill. According to EIP (2010a), one phase of the Spurlock Station ash landfill (Area A) is located on a ridge and two phases (Areas B and C) are located in spring-fed hollows, each containing an intermittent stream. The horizontal expansion of Area C, permitted in 2005, occupies 54.48 acres. The liner has a permeability of 1 x 10-7 cm/sec. According to EIP (2010a), citing an EKPC report, EKPC performed a “liner risk analysis” as part of their application for a horizontal expansion further into adjacent hollows. The risk analysis included a Synthetic Precipitation Leaching Procedure (SPLP) for fly ash and bottom ash. The result of that test showed arsenic leaching from the ash at 0.066 mg/L, or 6.6 times higher than the current EPA
East Kentucky Power Cooperative (2009). According to Dewberry and Davis (2011, Appendix B, Document 9), the impoundment is lined with a 15-18” clay liner, with a leak rate (estimated at construction) of 91 (± 20 percent) gallon/minute. According to EIP (2010a), the impoundment is located 200 feet from the Ohio River: for location, see Dewberry and Davis (ibid, Appendix A, Document 1). It is regulated under KPDES Permit No. KY0022250. IIb Potential CCR Damage Cases
EIP (2010a) claims that the exceedances in groundwater are located 750 feet beyond the coal ash landfill boundary, which is later described as 750 feet beyond the permitted area at IW-7. However, later in the EIP (2010a),
PART I (Cases 1-32) December 2014 well.339 Whereas statistical analyses of groundwater data have been required since at least 2005, such analysis was only performed once (2006) in four years. In a January 2008 letter to the Division, EKPC concluded that “no meaningful statistics can be performed” because the data set was so small, even though the 2006 analysis indicated multiple statistically significant increases (SSIs) in parameter concentrations. The Kentucky Division of Waste Management (KDWM) does not require that a potentiometric surface diagram be submitted with groundwater reports and as a result, it is unable to determine the location of any well or the direction and rate of groundwater flow at the site. Given that there is no true reported up-gradient well, the results of the statistical analyses likely indicate more significant contamination because there is no ambient, unaffected background well to compare downgradient and side-gradient well results. Instead, down-gradient wells are compared to wells that have already been affected by CCR.
EKPC submits that340 EIP’s (2010a) annotation of the sites of wells MW-1, MW-2, and MW-3 is incorrect; and that MW-l (also known as IW-8) is the reference well, that is located side-gradient to the fill Areas in a location that is unaffected by landfill operations, as required by Kentucky regulations.
EKPC claims also that the results of groundwater sampling do not indicate the presence of contamination in MW-1, MW-2 or MW-A; and that Kentucky’s permitted groundwater standard for arsenic is 0.050 ppm, not 0.010 ppm. Finally, in response to EIP’s (2010a) map (p. 73), which shows a drinking water well within the plant boundary, EKPC states that no drinking water well exists on the site, and that the groundwater at the site is not used as a drinking water source. Contrary to the claims made in In 2010(a), all of the monitoring wells are within the permit boundary, there is no demonstrated impact to groundwater beyond the permit boundary, and there are no drinking water wells within one mile of the permit boundary as required by the permit conditions.341
MW-2A and MW-3A down-gradient and outside waste area C, which is down-gradient of Areas A and B. The new monitoring wells are still on the power plant’s property, but beyond the new solid waste boundary. Arsenic has not been detected in the replacement wells MW-2A and MW-3A during the two initial characterization samples required by the 401 KAR 45:160, Section 7. Therefore, there is no violation of federal or state open dumping requirements. (ii) EKPC owns the land between the landfill and the Ohio River, the natural destination for the groundwater under the landfill. Therefore, there is no damage shown to off-site groundwater. With the non-detect readings in the new monitoring wells, there is In KPEC’s comment to the October 2011 NODA (EPA-HQ-RCRA-2011-0392-0209), KPEC states that the Spurlock Landfill and its groundwater monitoring system have been permitted by the Kentucky Division of Waste Management in accordance with the requirements of 401 KAR Chapter 45, and that EKPC has followed all design requirements in effect at the time of development of each phase of the landfill. Comment to the proposed CCR rule docket: EPA-HQ-RCRA- 2009-0640-6991, and KPEC’s comment to the October 2011 NODA: EPA-HQ-RCRA-2011-0392-0209.
KPEC also states: “The picture showing the location of the drinking water wells on page 72 shows all of the wells to be upgradient of the shallow water flow. The one well downgradient appears to be on Spurlock property and is most likely the withdrawal point for the power station…Moreover, the direction of groundwater flow beneath the Spurlock Landfill is away from the drinking water wells shown on the map.” (Reference to the EIP 2010a aerial map on page 72). Comment to the 2011 NODA docket: EPA-HQ-RCRA- 2011-0392-0219. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 little threat to the 25 private wells and three public wells within a two- and five-mile radius, respectively, of the site.343, 344 Evaluation against Proven Damage Criteria345 Criteria Criterion 1: Documented exceedances of Evaluation Onsite groundwater data exceeded the primary EPA
MCL for arsenic. Onsite groundwater data exceeded EPA SMCLs for sulfate and TDS. No offsite groundwater data are available. primary maximum contaminant levels (MCLs) or other health-based standards measured in groundwater at sufficient distance from the waste management unit to indicate that hazardous constituents have migrated to the extent that they could cause human health concerns Criterion 2: Where a scientific study provides None documented evidence of another type of damage to human health or the environment (e.g., ecological damage) Criterion 3: Where there has been an None administrative ruling or court decision with an explicit finding of specific damage to human health or the environment Resolution: In September 2010, EKPC was directed by the KDWM to conduct an assessment to determine the cause of the detection of arsenic in MW-3 at a concentration exceeding the permit limit.
ICF (2010a). More recently, KDEP stated (KDEP Division of Waste Management comment to the October 2011 NODA:
EPA-HQ-RCRA-2011-0392-0219) that the Commonwealth placed the facility in the groundwater assessment phase, the owners performed corrective action and recent monitoring confirmed a return to compliance.
KDWM and KPEC comments to the 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0219, and EPA-HQRCRA-2011-0392-0209, respectively. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 USWAG claims this site does not meet the criteria for a damage case.348
ICF (2010) Rationale: Potential Damage. <Although the EIP/EJ/SC August 2010 Report indicates that exceedances of primary and secondary MCLs had occurred offsite, it is apparent that these exceedances actually occur at well IW-7, which is located onsite.349 Therefore, there has not been any assessment of groundwater or surface water offsite and there are no other impact or damage claims. There are no regulatory corrective actions, administrative rulings, or court decisions associated with the landfill.> References
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #13, Environmental Integrity Project, EarthJustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #13. ICF, 10/2010. Quarles and Segall (2010): Slow Motion Spills: CCW and Water in Kentucky/Sierra Club, KY Waterway
Alliance, and Global Environmental, LLC, 2010. Accessed Online May 2012. http://kentucky.sierraclub.org/resources/Environmental_Research/Coal_Combustion_Waste_and_Water_I n_KY_042110.pdf East Kentucky Power Cooperative (2009): Response to Request for Information under Section 104 (e) of Comprehensive Environmental, Response, Compensation and Liability Act, 42 U.S.C. 9604(e), March 24, 2009. Accessed Online May 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys/east-ky.pdf Currens (2002): Kentucky is Karst Country! What You Should Know About Sinkholes and Springs,
James C. Currens, Kentucky Geological Survey, University of Kentucky, Lexington, Information Circular 4, Series XII, 2002. Accessed Online December 2012. http://kgs.uky.edu/kgsweb/olops/pub/kgs/ic04_12.pdf Hopkins (1966): The Fresh-Saline Water Interface in Kentucky, H.T. Hopkins, U.S. Geological Survey, Kentucky Geological Survey, University of Kentucky, in cooperation with United States Geological
Survey, Department of the Interior, 1966. Accessed Online December 2012. http://kgs.uky.edu/kgsweb/download/wrs/SALINE.PDF Weir et al., (1984): Lithostratigraphy of Upper Ordovician Strata Exposed in Kentucky, G.W. Weir, W.L.
Kentucky, Kentucky Geological Survey, 1984. Accessed Online December 2012. Comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211): “This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria. The alleged off‐site impacted well is not off‐site, but is located within the property boundary of the site.”
However, as stated in greater detail in EIP (2010a) and in Quarles and Segall (2010) and summarized above,
John F. Stickney, County Report 78, Series XII, Kentucky Geological Survey, University of Kentucky, 2004. Accessed Online December 2012. http://www.uky.edu/KGS/water/library/webintro.htm Dewberry and Davis (2011): Coal Combustion Residue Impoundment Round 9 - Dam Assessment Report H.L. Spurlock Power Station, Spurlock Ash Pond, East Kentucky Power Cooperative, Maysville,
Kentucky, Dewberry and Davis, December 2011. Accessed Online January 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/ekypc_spurlock_final.pdf PTb19. Big Cajun 2 Power Plant, NRG Energy - Louisiana Generating, LLC, New Roads, Pointe Coupee Parish, Louisiana Type: Surface Impoundments, Surge- and Treatment Ponds. Background and Description: The Big Cajun 2 Power Plant,350 located in New Roads, Louisiana (approximately 35 miles northwest of Baton Rouge), has disposed of coal combustion residuals (CCRs) According to NRM’s website: http://www.nrgenergy.com/about/assets.html, the Plant’s coal-fueled generating capacity is 1,742 MW. According to Sourcewatch, the Plant’s nameplate capacity is 1,871 MW, comprising the following units (with their commissioning dates): 626 MW (1981), 626 MW (1982), and 619 MW (1983) (http://www.sourcewatch.org/index.php?title=Big_Cajun_II_Power_Plant). A recent NRM pilot project at the Big Cajun II electrical generating station to evaluate local conditions for locally growing switchgrass and high-biomass sorghum as renewable biomass fuels, to determine their capacity for replacing a portion (10 percent) of the coal at the plant to reduce its carbon intensity failed when the crops yielded only a fraction of the expected biomass. (Dallas IIb Potential CCR Damage Cases
News, Sept. 30, 2009: http://energyandenvironmentblog.dallasnews.com/archives/2009/09/nrg-to-try-replacing-coalwith.html and http://theadvocate.com/home/279165-79/its-not-easy-going-green.html. According to Shaw Environmental and Infrastructure Inc. (2006), the total acreage of the fly ash ponds is cited as 295 acres (in Dewberry & Davis, LLC, 2011, Appendix A, Document 4). According to the Response to EPA Request for Information (2009), the corresponding waste capacities of the two ash ponds and two water treatment ponds are (in the sequence cited above): 1,750, 1,188, 457.2, and 127.8 acre-feet. As of 2009, the fly ash pond was 65 percent full and the bottom ash pond was 54 percent full. The surge pond was not evaluated by Dewberry & Davis, LLC (ibid), because it is below grade and has no dam or embankments. Two of the five ponds are clay-lined, while it is not clear whether the two remaining ponds are also lined. According to
EIP (2010a), the permit application for the bottom ash and fly ash ponds was submitted to LDEQ in 1982, and the permit was issued on June 20, 1986. According to Dewberry & Davis, LLC (ibid), the Louisiana Department of Environmental Quality (DEQ) granted the most recent LPDES permit to Big Cajun II Generating Station for wastewater discharge (permit No. LA0054135) in March, 2010, and also has permitted the solid waste management units as Type I Industrial Surface Impoundment (Permit No. P-0108.) According to Shaw Environmental and
Infrastructure Inc. (2006), the Plant sells its fly ash for beneficial reuse as cement additive. According to Shaw Environmental and Infrastructure Inc. (ibid), this finding is based on some 230, 10-foot borings. Approximately 7 percent of the test boring indicated a clay thickness ranging from 2 to 3 feet: a 1-foot layer of re-compacted clay was added to these areas to insure that the liner had the required minimum of 3 feet of recompacted clay. IIb Potential CCR Damage Cases
Historically, the highest groundwater elevations have been found at MW-85C and MW-85D, which are down-gradient of all ponds and are located nearest the Primary Treatment Pond, the Surge Pond, and the Bottom Ash pond. Big Cajun recently recognized that “divergent flow exists to the east and west originating from the center of the ash impoundment area”.356 The higher groundwater elevations in pond area wells suggest groundwater mounding beneath the ponds due to leakage from one or more of those ponds, causing localized reversal of groundwater flow to the west away from the river. Impact and Damage Claims: EIP (2010a) indicates that levels of selenium exceeded the primary EPA Maximum Contaminant Level (MCL) in onsite groundwater. Additionally, total dissolved solids (TDS) exceeded the secondary MCL (SMCL) in onsite groundwater.