Damage Case Compendium Technical Support Document, Volume IIb Part One: Potential Damage Cases - DCN SE04460
Other documents for the same rulemaking
References: 510 extracted, 0 linked to papers
USGS (1981): Hydraulic characteristics of an underdrained irrigation circle, Muskegon County, wastewater disposal system, Michigan. 1981, McDonald, M. G., United States Geological Survey Water Supply Paper: 2081. Accessed Online August 2014. http://pubs.er.usgs.gov/publication/wsp2081
USGS (1996): Hydrogeologic Framework of Mississippian Rocks in the Central Lower Peninsula of Michigan. D.B. Westjohn and T.L. Weaver, U.S. Geological Survey Water-Resources Investigations Report 94-4246. Lansing, Michigan, 1996. Accessed Online August 2014. http://.www.pubs.usgs.gov/wri/1994/4246/report.pdf PTb28. John Warden Ash Site, L’Anse, Baraga County, Michigan Type: Ash Landfill (Mixed with Municipal Solid Waste or On Top of a MSW Landfill) Brief Description: This site was submitted by the Michigan Department of Natural Resources and Environment (DNRE), together with seven other sites, to the CCR Proposed Rule docket.502 According to Michigan DNRE (2010), this unlined, Type III industrial (Low Hazard) landfill, formerly owned by Upper Peninsula Power Co. (UPPCO),503 received ash from the John H. Warden Generating Station Michigan DNRE (2010). Facility ID: 07-000002: Michigan DEQ (2000). The site is apparently located at the distal section and south of Old Dump Road, south of the town of L’Anse. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 between 1974 and 1993.504 It is one of five Type III sites in Michigan505 that were formerly licensed to accept solid waste but are now closed. Located three-quarters of a mile from Keweenaw Bay on Lake
Michigan, a subsidiary of Traxys North America, LLC biomass-fueled electric plant, which went into commercial operation in late 2009. Upper Peninsula Power Company (UPPCO) is a subsidiary of Upper Peninsula Energy Corporation (UPEN). It was incorporated in 1947 under the laws of the State of Michigan as an electric utility engaged in the generation, purchase, transmission, distribution and sale of electric energy in the Upper Peninsula of Michigan. UPPCO was the original owner of the John H. Warden Generating Station, which has been in operation since 1959. During 1993 the Warden Station was upgraded to have natural gas burning capability in addition to coal. Effective January 1, 1994, the station was taken out of service and placed in service lay-up status (mothballed): http://google.brand.edgar-online.com/EFX_dll/EDGARpro.dll?FetchFilingHtmlSection1?SectionID=245507-868750845&SessionID=47tTFCxxrrzsN27. In 2010, the Station was granted $11.69 Million to replace the original 60
MW plant by a 20 MW (17.7 MW net) boiler (#1) fueled by biomass or fossil-fuel: Biomass Accountability Project (2011). In addition to providing renewable energy for Michigan’s economy, the biomass plant utilized paper mill waste from a nearby mill as part of its fuel input (Traxys, no date). The others are B.C. Cobb, Muskegon; Muskegon County Landfill, Muskegon; North Lansing Landfill, Lansing; and Pine Hill Landfill, Marquette. Note that co-disposal of municipal-, industrial-, and special waste is rather common in Michigan. For instance, according to Michigan DEQ (2002), Baraga County has requested Michigan DEQ to export its solid waste to the Wood Island Landfill in Wetmore, Ontonagon County. This Type II Sanitary Landfill was licensed to accept residential, commercial, industrial, and construction & demolition waste, as well as contaminated soils and special waste. The latter included foundry sands, fly ash and auto shredded fluff. IIb Potential CCR Damage Cases
GEM Center for Science and Environmental Outreach, Michigan Technological University, July 2000, Table 4.20a. Operating and Closed Waste Disposal Sites in the Lake Superior Basin--Michigan (p. 2 of 2). Accessed Online August 2014. http://cseo.mtu.edu/community/planning/FinalReport/Appendix3Tables/SIT4-20A.pdf Upper Peninsula Power Company (1998): 10K Filing, March 26, 1998, Part I. Accessed Online August 2014. http://google.brand.edgaronline.com/EFX_dll/EDGARpro.dll?FetchFilingHtmlSection1?SectionID=245507-868750845&SessionID=47tTFCxxrrzsN27 Michigan DEQ (2002): Baraga County Solid Waste Management Plan. Michigan Department of Environmental Quality, Waste Management Division, Feb. 26, 2002. Accessed Online August 2014. Baraga - State of Michigan Traxys (No date): L'Anse Warden Electric Company, LLC. Accessed Online August 2014. http://www.whitepineep.com/Lanse.html Michigan DNR (1973): Water Investigation 11, Ground Water and Geology of Baraga County, Michigan. State Michigan Department of Natural Resources Geological Survey Division, C. J. Doonan, and J. R.
Byerlay, Lansing, Michigan 1973. Prepared in cooperation with the Water Resources Division of the Geological Survey, United States Department of the Interior. Accessed Online August 2014. http://www.michigan.gov/documents/deq/GIMDL-WI11_216293_7.PDF Upper Peninsula Power Company (1998). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Biomass Accountability Project (2011): Biomass Electricity: Clean Energy Subsidies for a Dirty Industry - The case for ending taxpayer and ratepayer subsidies that harm public health, environment, climate, and forests. Produced by the Biomass Accountability Project, Margaret Sheehan, Esq., Samantha Chirillo, Josh Schlossberg, Dr. William Sammons, Matt Leonard, Energy Justice Network, June 2011. Accessed Online August 2011. Biomass Electricity in the - No Biomass Burning PTb29. Consumer Energy B.C. Cobb Landfill, Muskegon County, Michigan Type: Ash Surface Impoundment Brief Description: This site was submitted by the Michigan Department of Natural Resources and Environment (DNRE), together with seven other sites, to the CCR Proposed Rule docket.508 According to Michigan DNRE (2010), this unlined, Type III industrial (Low Hazard) landfill received ash from the B.C. Cobb Plant in a surface impoundment from 1970-1982. The site is one of five Type III sites in Michigan509 that were formerly licensed to accept solid waste but are now closed.510 There are three monitoring wells at the site.
Engineering, September 25, 2013. Accessed Online August 2014. http://www.power-eng.com/articles/2013/09/consumers-energy-receives-approval-to-delay-retiring-coalfired-units.html Consumer Energy Company comment to the August 2013 NODA docket: EPA-HQ-RCRA-2012-0028-0068, and Attachment 2: Guidelines for Area 4 and 4A Inspection, Operation and Monitoring. Consumer Energy Corporation, B.C. Cobb Generating Facility, Muskegon, Michigan, May 2005 (Rev 1). Prepared by STS Consultants, Ltd.: http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2012-0028-0068. Comprising six wells (MH-1 through MH-6) and 14 perimeter piezometers. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 PTb30. Consumers Energy J.H. Campbell, West Olive, Port Sheldon Township, Ottawa
Olive, Michigan 49460) has a generating capacity of 1,450 MW. It is located on a 2,000-acre site along the Lake Michigan shoreline next to Pigeon Lake along the Lake Michigan shoreline, about 10 miles south of the city of Grand Haven. Units 1 (260 MW) and 2 (360 MW) began operating in 1962 and 1967, respectively, and Unit 3 (830
MW) - in 1980. Campbell Units 1 and 3 burn 100 percent western coal. Campbell Unit 2 burns a blend of eastern and low-sulfur western coal. Western coal makes its way from Wyoming and Montana, while eastern coal arrives from a variety of states. The complex consumes about 6 million tons of coal per year, and the plant produces about 208,000 tons ash/year. The others are John Warden Ash Site, L’Anse, Baraga County; Muskegon County Landfill, Muskegon; North Lansing Landfill, Lansing; and Pine Hill Landfill, Marquette. According to Clear Water Fund (2013), this site consists of several “cells” the last of which were closed in 2012.
Currently, the site comprises five ponds (one of which is retired) and seven landfills. The current, active landfill has a double, synthetic liner and a leachate collection system. Besser et al., (1996). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 wildlife and laboratory animals. However, human consumption of moderate quantities of fish from Pigeon River and Pigeon Lake should not result in excessive selenium intake. Resolution: There is no consent order. RAP (Cells 1-7); RAP (Cells A-K impoundment, south of cells 17): restrictive deed covenant. Groundwater extraction (can be suspended if criteria are met), mixing zone criteria: boron, lithium, selenium.520 According to Michigan DEQ (2013), the following cells: A, B, D, E, F, G-1, G-2, H, J, and K have final closure certified pursuant to the Consumer’s Energy RAP presented on August 9, 1999, and last revised on January 31, 2008. The closed units encompass 142 acres of the site’s total 410 acres.521 Basis for Consideration as a Potential Damage Case: On-site groundwater exceedance of State health standards for boron, lithium, antimony, and selenium and release of same to surface water.
References Michigan DNRE (2010): Michigan Department of Natural Resources and Environment (DNRE) comment to the proposed CCR Rule docket: EPA-HQ-RCRA-2009-0640-6815, Attachment 5: Table of Michigan’s Proven Damage Cases. Accessed Online August 2014. http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2009-0640-6815 Besser et al., (1996): Selenium Accumulation and Hazards in a Fish Community Affected by Coal Fly Ash Effluent. Besser J. M., J. P. Giesy, R. W. Brown, J. M. Buell, and G. A. Dawson, Ecotoxicology & Environmental Safety 35, 7-15 (1996). Accessed Online August 2014.
NPPD is a public corporation and political subdivision of the state of Nebraska. Ash Pit #4, the monitoring data of which was not reviewed by EIP (2010a), has a compacted clay liner and a leachate collection system. Nebraska Department of Environmental Quality Comment to the October 2011 NODA docket: EPA-HQ-RCRA2011-0392-0217. NDEQ states that this site was constructed in 1989, prior to promulgation of the regulations that now apply to coal ash landfills. The substantial new requirements for fossil fuel combustion ash (FCCA) landfills, including liner requirement, were adopted in 1993. For instance, the currently operating landfill, Ash Pit #4, was designed to the newer regulatory standards, with a compacted clay liner, a leachate collection system, and an evaporation pond. Gosselin et al., (2001) and Gosselin et al., (2003). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 secondary EPA MCL (SMCL) in onsite groundwater. From 2002 onward, the two down-gradient monitoring wells for Ash Pit #3 have detected steadily rising levels of selenium (up to 0.073 mg/L) and sulfate (over 350 mg/L). The full extent of the contamination is unknown because these are the only two down-gradient wells for the coal ash landfill. According to EIP (2010a), both down-gradient monitoring wells have shown increases over time of typical CCR contaminants, such as selenium in MW-3 and sulfates in MW-4. In MW-3, selenium concentrations have followed a steadily increasing trend from 2002 to 2009. Selenium concentrations in
MW-3 have increased from concentrations as low as 0.014 mg/L in 2001 to as high as 0.0728 mg/L in 2006, exceeding the MCL of 0.050 mg/L. Sulfate levels in MW-4 have steadily increased over time, rising from 50 mg/L in 2001 to a high of 381 mg/L in 2007, surpassing the Secondary MCL (SMCL) of 250 mg/L. According to EIP (2010a), NPPD argues that the selenium levels are from naturally occurring sources since the selenium levels in laboratory coal ash leachate tests were an order of magnitude less than those found in onsite groundwater.
EIP (2010a) claims that water quality in “up-gradient” well MW-1 also appears to be heavily influenced with both chloride and sulfate levels showing steadily increasing patterns in the wells. NPPD blames this increase on cooling water discharge to a wetlands area up-gradient of the well. However, the closeness of
EPA-HQ-RCRA-2009-0640-7533. Nebraska Department of Environmental Quality Comment to the October 2011 NODA docket: EPA-HQ-RCRA2011-0392-0217.
EPA-HQ-RCRA-2009-0640-7533. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 dramatically, the likely remedial action for this site would be continued groundwater monitoring and/or restricted groundwater use. Evaluation against Proven Damage Criteria530 Criteria Criterion 1: Documented exceedances of primary Evaluation Onsite groundwater exceeded the primary EPA maximum contaminant levels (MCLs) or other healthMCL for selenium. based standards measured in groundwater at sufficient Onsite groundwater exceeded the EPA SMCL distance from the waste management unit to indicate for sulfate. that hazardous constituents have migrated to the extent No offsite groundwater data are available. that they could cause human health concerns Criterion 2: Where a scientific study provides documented evidence of another type of damage to human health or the environment (e.g., ecological damage) Criterion 3: Where there has been an administrative ruling or court decision with an explicit finding of specific damage to human health or the environment None NDEQ has required NPPD to install additional wells and extended the post-closure groundwater monitoring period from 10 years to 15 years due to evidence of contamination. Resolution: After closure of the landfill in 1999, NDEQ required groundwater monitoring for ten years. In 2009, NDEQ extended the post-closure groundwater monitoring period through 2014 due to evidence of contamination and requested that additional wells be installed to further delineate the plume.
NDEQ claims531 that the information obtained to date suggests that additional investigation is warranted at Ash Pit #3. In December 2010, additional wells were installed in the down gradient direction from the landfill. The facility will conduct six semi-annual sampling events of all groundwater monitoring wells around the facility and perform statistical analysis of these results.
ICF (2010a) Rationale: Potential Damage. <Groundwater exceedances of primary and secondary MCLs have been found onsite. There has not been any assessment of groundwater offsite and there are no other impact or damage claims. Additional well installation and post-closure groundwater monitoring was extended by five additional years by NDEQ due to evidence of contamination; however, there are no other regulatory corrective actions, administrative rulings, or court decisions associated with the landfill.>
ICF (2010a). Comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0217. Comment to the October 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211): “The Nebraska DEQ (2009) extended the post closure groundwater monitoring period by 5 years and requested that additional monitoring wells be installed. This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria. The ash pond in question was removed from service in 1999 and is currently in post‐closure monitoring phase. The only alleged off‐site receptor of groundwater is one irrigation-well identified in the Reference Document as being located within one mile of the site. No well location or other identifying information was provided, nor could a determination be made as to whether the well location is upgradient or down-gradient from the site with respect to groundwater flow direction.” IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 References
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #21, Environmental Integrity Project, EarthJustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #21. ICF, 10/2010. Gosselin et al., (2003): The Complex Dakota Aquifer: Managing Groundwater in Nebraska, David C.
Gosselin, F. Edwin Harvey and Charles Flowerday. Geotimes, April 2003. Accessed Online May 2012. http://www.geotimes.org/apr03/feature_nebraska.html Gosselin et al., (2001): Geochemical Evolution of Ground Water in the Great Plains (Dakota) Aquifer of Nebraska: Implications for the Management of a Regional Aquifer System, David C. Gosselin, F. Edwin
Harvey, and Carol D. Frost. Ground Water 39:1 (2001), pp. 98–108. Accessed Online May 2012. http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1141&context=natrespapers&seiredir=1&referer=http%3A%2F%2Fwww.google.com%2Fsearch%3Fq%3Dlancaster%2Bcounty%2Bnebr aska%2Bregional%2Baquifer%26hl%3Den%26gbv%3D2%26gs_l%3Dhp.1.0.0j0i8i30l9.3093.13686.0.1 5967.29.16.0.13.13.0.250.1844.7j7j2.16.0...0.0.SXYH_QqyV0s%26safe%3Don%26oq%3Dlancaster%2 Bcounty%2Bnebraska%2Bregional%2Baquifer%26aq%3Df%26aqi%3D%26aql%3D#search=%22lancas ter%20county%20nebraska%20regional%20aquifer%22
DOE (1998): Environmental Monitoring Summary, Entombed Hallam Nuclear Power Facility, James D.
Paulson, Project Manager, U.S. Department of Energy, Chicago Operations Office, Environmental Programs Group, March 11, 1998. Accessed Online December 2012. www.lm.doe.gov/Hallam/LTSM00002733.pdf PTb32. Asheville Steam Electric Plant, Duke Energy (formerly: Progress Energy),533
Carolina, and immediately east of the French Broad River, has two unlined535 coal ash impoundments that accept CCR from the Asheville Plant. One (so called the 1982 ash pond) is actively being used for wet Progress Energy and Duke Energy merged into one corporation in July 2012. The Asheville Electric Plant is the largest electric generating facility in Western North Carolina. Located near
Skyland, N.C., the plant consists of two coal-fired units (376 MW steam capacity) and two combustion turbine units (324 MW-capacity). The Asheville Plant began commercial operation in 1964, with additions in 1971, 1999 and 2000: https://www.progress-energy.com/assets/www/docs/company/plantbrochure.pdf
However, the appendices to the Dewberry & Davis, Inc. for Lockheed Martin (2009) Final Report indicate that a geomembrane was installed in the 1964 pond during the construction (2005) of the artificial wetland inside this Pond. IIb Potential CCR Damage Cases
USWAG’s voluntary monitoring effort.543 The GW-series wells and wells PZ-19 and PZ-22 have been Fly ash, bottom ash and boiler slag, as well as ash sluice water, categorical low volume wastewater, coal pile storm water, and runoff and other storm water. However, according to Fig. 1: Asheville Ash Ponds Water Level Map – November 13, 2012, prepared by Synterra for Progress Energy, the 1982 pond has become a dry CCR stacking unit: http://portal.ncdenr.org/web/wq/hot-topics/coalashregulation/gwatermonitoring, Map. Dewberry & Davis, Inc. for Lockheed Martin (2009). The constructed wetlands treatment system is a continuous flow-through, with 750,000 ft3 capacity. It consists of equalization basins, a bulrush area, a rock filter, and a cattail area.
Duke Energy (2013). The 320-acre Lake Julian, a site of recreational fishing and other leisure activities, was built in 1963; it doubles also as the Plant’s cooling reservoir. http://www.citizentimes.com/article/20110715/HOMEGARDEN/307160011/South-Asheville-s-Lake-Julian-an-urban-respite The Asheville Plant’s wastewater treatment system also includes components that discharge only to other parts of the system, including: (i) an ash pond constructed in 1964, which can discharge to Outfall 001; (ii) a Chemical Metal Cleaning Treatment System, which can discharge through internal Outfall 004 and flow to Outfall 001; and (iii) a
FGDS wet scrubber wastewater treatment system, which discharges through internal Outfall 005 and flows to Outfall 001. According to Soil Survey of Buncombe County, North Carolina (2009), and Dewberry & Davis, Inc. for Lockheed Martin (2009), the rock within the impoundment areas is located within the Ashe Metamorphic Suite and Tallulah Falls Formation, a muscovite-biotite gneiss rock (locally sulfidic, inter-layered and gradational with mica schist, minor amphibolites, and hornblende gneiss). It is inferred that the upper section of these rocks is deeply weathered, forming a substantial horizon of saprolite. For the distribution of the groundwater monitoring wells and the groundwater contours of the saprolite groundwater table, see http://portal.ncdenr.org/web/wq/hot-topics/coalashregulation/gwatermonitoring, Map, and Attachment A (Asheville Progress Energy Water Level Map), for the November 13, 2012 and March 11, 2009 mounded configuration of the water table around the 1982 (“New”) Ash Pond, respectively, as drawn by SynTerra. Appalachian Voices and Clean Water for North Carolina comment to the Steam Electric Industry/CCR Rule joint docket: EPA-HQ-RCRA-2013-0209-0037. This mounding is confirmed also by the similarity of constituent levels in a ‘background’ compliance boundary wells (CB-1) to that of contaminant levels in down-gradient CB wells (e.g., in
CB-1, pH ranged in the sampling period between Nov. 2010 and April 2014 from 4.4 to 5.4, which, with the IIb Potential CCR Damage Cases
USWAG claims549 that this case does not meet the criteria for a damage case because the allegations are only for on‐site groundwater and surface water. Tests in a home located between the French Broad River and an ash disposal pond at the Asheville power plant showed that its private well contains unsafe levels of contamination, according to the NC DENR. On October 23, 2013, state environmental officials said they would make Duke Energy provide residents of the home with alternative drinking water by November 15.550 In July 2014, NC DENR has ordered Duke Energy to install monitoring wells in a residential neighborhood outside Asheville to determine exception of well CB-4B, where pH values of 6.2-7.6 have been recorded, are essentially in the same range as in the ‘down-gradient’ monitoring wells). Response to EPA CWA 308 and RCRA 3007 Information Request, August 2010 (A CD provided by
EPA/OECA). According to NC DENR Division of Water Quality (DWQ) feedback in response to EPA’s Region 4 inquiry following stakeholders’ complaints in the 2010 Knoxville and Charlotte Public Hearings (a January 3, 2012 email from L. DiGaetano to A. Livnat, EPA/OSWER), additional groundwater monitoring wells were installed at the Compliance Boundary in February 2011.
NC Admin. Code title 15A, Subchapter 2L, herein: ‘2L Rules’. Progress Energy’s, in its comment to the October 2011 NODA’s docket: EPA-HQ-RCRA-2011-0392-0272, claims that “iron and manganese… are common natural components of groundwater in North Carolina. When background concentrations exceed the published standard, background becomes the standard. Until a complete assessment is done (required by NC rules) of groundwater movement, all sources of contamination, and geochemical processes at work, any determination of damages and appropriate corrective actions are premature and likely inaccurate.”
Appendix L, pp. 1032-1046, and Figs. 1-3; Response to EPA CWA 308 and RCRA 3007 Information Request, August 2010 (A CD provided by EPA/OECA). Also, Progress Energy’s comment to the October 2011 NODA’s docket: EPA-HQ-RCRA-2011-0392-0272. Comment to the 2001 NODA docket (EPA-HQ-RCRA- 2011-0392-0211): “The information provided for the Site does not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria.” Winston-Salem Journal (2013). IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 human health or the environment (e.g., ecological damage) Criterion 3: Where there has been an administrative ruling or court decision with an explicit finding of specific damage to human health or the environment North Carolina Department of Environment and Natural Resources (DENR) has not required any corrective action and has no plans to take any regulatory action until groundwater contamination reaches the compliance boundary. Resolution: According to NC vs.
Duke Energy (2013), since 2006, Duke Energy Progress has taken the following actions to maintain and upgrade the ash ponds and associated components of its wastewater treatment system at the Asheville Plant: (i) dewatering and removal of ash from the 1982 pond to increase storage capacity; (ii) structural improvements to the 1964 pond dam; (iii) installation of a drainage system to ensure stability of the 1964 pond; (iv) dewatering of and sediment removal from a stormwater pond to prepare for its eventual use as a settling basin; and (v) construction of a lined stilling basin. In addition, from 2006 to 2010, Duke Energy Progress engaged in voluntary groundwater monitoring at the Asheville Plant and submitted the results to DWQ. 554, 555 Following a 2009 letter DWQ sent to Progress Energy, directing them to place wells at their Compliance Boundaries (CBs) to help DENR determine if further action will be required, in 2010, Duke Energy Progress installed additional groundwater monitoring wells and began submitting mandatory groundwater monitoring data to DWQ.556
DWQ on April 22, 2013. NC DENR’s comment to the proposed CCR rule docket: EPA-HQ-RCRA-2009-0640-9282. According to Response to EPA CWA 308 and RCRA 3007 Information Request, August 2010 (A CD provided by EPA/OECA), in 2006 the PZ- groundwater monitoring series wells were installed as part of an ash Monofillsiting Study. Additional monitoring wells (GW-series) were installed in 2007 as part of USWAG’s voluntary monitoring effort. The GW-series wells and wells PZ-19 and PZ-22 have been sampled on a semi-annual basis since installation. The Compliance Boundary wells installed in 2010/2011 are sampled on a quaternary basis.
CB-7, and CB-8; and three background wells: CB-1, CB-5 (anthropomorphic floodplain well), and CB-9. For locations and a potentiometric map, see: http://portal.ncdenr.org/web/wq/hottopics/coalashregulation/gwatermonitoring, Map. According to NC DENR Division of Water Quality’s (DWQ) feedback in response to EPA’s Region 4 inquiry following stakeholders’ complaints in the 2010 Knoxville and Charlotte Public Hearings (a January 3, 2012 email from L. DiGaetano to A. Livnat, EPA/OSWER), additional groundwater monitoring wells were installed at the Compliance Boundary in February 2011. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 On March 22, 2013, The North Carolina DENR filed a lawsuit seeking to require Progress Energy to address groundwater contamination at its coal-fired plant in Asheville asking the state court to order the utility to abate groundwater contamination and conduct further evaluation of the source and extent of contamination found around the facility.563 NC DENR claims that monitoring at the Asheville Steam Station has shown violations of groundwater standards for thallium,564 boron,565 chloride, selenium, sulfate, iron, and manganese, at the facility's compliance boundary, 500 feet from the permitted waste disposal area.566 In addition, although cadmium levels were measured “well below” the water quality standard, the chemical recently was detected. State water quality inspectors also observed liquid seeping from the facility's two coal ash ponds and other locations into the French Broad River, in violation of state and federal water quality laws.567 No drinking water violations at nearby wells have been found. NC
DENR asked the court to order Progress Energy to stop the unlawful discharges and assess the cause, significance, and extent of the thallium and seepage violations. The agency also requested that the utility conduct additional sampling and more thoroughly evaluate groundwater quality. A Progress Energy representative said the company is evaluating the matter but denied violating its permit conditions. On May 20, 2013, NC DENR filed a complaint amending its March 2013 filing against Duke Energy over leaks and contamination at its Asheville Plant, adding similar issues found at the Riverbend Plant568 to the State’s lawsuit. According to Bloomberg BNA (July 2013), Duke Energy and NC DENR have tentatively reached a settlement, a proposed consent order has been filed in two state superior courts569 and public comments are being sought.570 Under the terms of the proposed agreement, the utility would be required to take steps to protect water quality at the two power plants and pay a fine of $99,112. Duke Energy also faces monetary penalties if it fails to meet the deadlines for any of the 33 specific compliance actions in
Progress Energy (2013). On October 1, 2010, the NC DNER DWQ Director established interim maximum concentration (IMAC) values for parameters for which a standard had not been established under the 2L Rules. The IMAC for thallium is 0.2 µg/L. Groundwater samples collected from the Plant’s Ash Treatment System monitoring wells between November 2010 and November 2012 show exceedances of the IMAC for thallium (CB-2: 0.21 µg/L in November 2012; CB-3, in six out of six sampling events; and in the recently installed CB-3R: one-time). Boron 2L standard of 0.7 mg/L was exceeded in compliance wells CB-6 and CB-8 in seven out of seven sampling events from November 2010 to November 2012 (maximum: 0.985 and 1.36 mg/L, respectively), and in compliance well CB-3 prior to its discontinuation as a monitoring well (maximum: 0.895 mg/L, July 2012). In addition, compliance well CB-3R contained boron concentration of 1.29 mg/L during the November 2012 sampling event. For chloride (CB-8), selenium (CB-8), and sulfate (CB-6), exceedances occurred in the quarterly sampling events between November 2010 and November 2011 but not since, rendering the compliance status of these wells for these particular constituents unclear. Iron was noted to exceed the 2L standard in four wells and manganese - in six monitoring wells in all or most of the sampling events in these wells from November 2010 to November 2012. The full quarterly sampling record of the CB wells (between Nov. 2010 and April 2014) shows the