Damage Case Compendium Technical Support Document, Volume IIa: Potential Damage Cases - DCN SE04459
Other documents for the same rulemaking
References: 514 extracted, 0 linked to papers
System, Hennepin, Illinois, GZA GeoEnvironmental, Inc., Norwood, Massachusetts, December 6, 2012. Accessed Online January 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/dynegy_hennepin_final.pdf Reinertsen (1988): A Guide to the Geology of the Canton Area, Fulton County, Geological Science Field
Resources, Illinois Department of Natural Resources, March 1999. Accessed Online January 2014. http://www.isws.uiuc.edu/pubdoc/MP/ISWSMP-187.pdf
EPRI (1999): Guide for Comanagement of Mill Rejects at Coal-Fired Power Plants, EPRI, Palo Alto, CA, and USWAG, Washington DC, June 1999. TR-108994. Accessed Online October 2014. http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=TR-108994 PTa08. Ameren (formerly: Central Illinois Public Service Co., CIP) Hutsonville Power Station,135 Crawford County, Hutsonville, Illinois Type: Surface Impoundments.136 According to http://www.sourcewatch.org/index.php?title=Hutsonville_Power_Station, the Plant’s nameplate generation capacity is 150 MW, achieved by two 75 MW units that came on line in 1953 and 1954. According to http://www.powermag.com/issues/cover_stories/Top-Plants-Hutsonville-Power-Station-Crawford-CountyIllinois_2178.html, the two oldest generation units that came online in 1940-1941, were retired in 1981. The power plant was originally designed to use bituminous, high sulfur Illinois Basin coal, but fully converted to PRB coal in 2006, following a test burn in 2004. According to an October 4, 2011, news release by Ameren, the Hutsonville Station was slated for closure by the end of 2011 (http://phx.corporate-ir.net/phoenix.zhtml?c=91845&p=irolnewsArticle&ID=1613335&highlight=). Closure took place as planned (http://articles.chicagotribune.com/2012-0507/news/sns-rt-utilities-firstenergycoal-factboxl1e8g38dr-20120503_1_coal-fired-power-plants-gas-plants-coalplants/2.
NPDES #IL0004120. IIa. CCR Damage Case Reassessment December 2014 Background and Description: The Hutsonville Power Station is located in Crawford County, Illinois, on the west bank of the Wabash River between the towns of Hutsonville and York. According to Ameren (2009), there are four impoundments on the Station’s grounds: Ash Pond A, receiving fly ash (14 acres, on line since 1986); Ash Pond B, receiving fly ash and bottom ash (4.4 acres, on line since 2000); Ash
Pond C, receiving fly ash and bottom ash (2 acres, on line since 2000);137 and Bottom Ash Pond (1.2 acres, on line since 1940). The apparent source term for the contamination, however, is a fifth pond, Pond D, a 22 acres, unlined fly ash impoundment located about 100 feet from the river. Pond D was constructed in 1968 and removed from service in 2000 and is presently undergoing closing.138 Ameren estimates that during its 30 years of active operation, Pond D accumulated approximately 950,000 cubic yards of ash, about 280,000 cubic yards of which lie below the water table.139 According to EPRI (2010), groundwater flow is toward the Wabash River.
AECOM (2009) and NRT (2009) claim that there are two water bearing units of interest in the vicinity of Pond D: the uppermigration zone140 and the deep alluvial aquifer.141 A confining layer is present that restricts vertical migration of groundwater between these two aquifers.142 Groundwater flow direction in both aquifers is eastward, toward the Wabash River.143 There are no dwellings down-gradient between the site and the Ash Ponds A, B and C, with geomembrane liner, have not been implicated. For location of the Plant and ponds, see NRT (2009), Figures 1 and 2, respectively. According to GZA GeoEnvironmental (2012), a portion of Pond D has been permanently closed and capped as a landfill. The Plant’s CCR operation was as follows: Pond A receives fly ash from the facility via a sluice transport pipe. Solids were allowed to settle and water was discharged from Pond A into Pond B. Pond B received fly ash
AECOM (2009), Appendix D. In contrast to the 18 monitoring wells presented in Table 2-2 of NRT, ibid, that were drilled between 1984 and 2004, according to GZA GeoEnvironmental, ibid (narrative and Figure 8), there are only eight groundwater monitoring wells: four wells (M-2 through M-5) are located along the southern and eastern portions of impoundment A; one well (M-3) is located along the southwestern portion of impoundment B; and three wells (M-6 through M-8) are located south and east of pond D. This apparent discrepancy with NRT’s data may suggest that ten of the Hutsonville Plant’s monitoring wells were abandoned towards or shortly after the Plant’s retirement.
IEPA approved Ameren’s Pond D Closure and post-closure plans, and on January 30, 2013, Ameren notified IEPA that it has concluded the closure of Pond D.153 Consistent with state and federal guidance for site remediation, Ameren conducted a human health risk assessment (HHRA) and an ecological risk assessment (ERA) in support of the closure of Pond D. These studies have demonstrated that the current environmental conditions associated with Pond-D are protective of human health and the environment under current and reasonably foreseeable future conditions and land use. Closure plan/activities for Pond D are expected to result in groundwater meeting Illinois Class I Groundwater Quality Standards at the Station property boundary in the future. Therefore, the closure plan/activities for Pond D are also protective of human health and the environment. According to EPRI (2010), the actions required under the 2000 Consent Order have been completed and the Consent Order is released. A groundwater monitoring program is in effect, and remediation is pending. Basis for Consideration as a Potential Damage Case: “The exceedances found at this site, sulfate, total dissolved solids and manganese, are of non-health-based standards. Therefore, this case is a potential damage case.”154 References
EPA (2007): Coal Combustion Waste Damage Case Assessments, Case #53 and a reference therein (Memorandum from SAIC to Dennis Ruddy regarding Rationale and Conclusions Regarding CommenterIdentified Fossil Fuel Combustion Waste Damage Cases, April 20, 2000). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015 Although agreeing that the proposed contamination levels will render the groundwater involved unsuitable for some purposes, CIPS argued that the groundwater will nonetheless not be polluted when judged by the Illinois Act's* definition of "water pollution," arguing that an adjusted standard should be granted because it has allegedly established that (1) the groundwater involved is located in close proximity to a large body of water, in this case the Wabash River; (2) the groundwater flows into the Wabash; (3) CIPS owns all of the property through which the groundwater flows; and (4) the contaminated groundwater will have no impact on the water quality of the Wabash.
Finally, CIPS attempted to establish that there will not likely be a need for this particular water in the foreseeable future, and argued that an adjusted standard is thus warranted. * Ill. Rev. Stat. 1983, ch. 111 1/2, par. 1003(nn).
Illinois EPA (2011). According to GenerationHub (2014), the Hutsonville power plant’s contamination has migrated off-site. Hydraulic containment is part of the corrective action at Hutsonville that is needed to pull back contamination that has gone off-site and to prevent further migration of off-site contamination. https://www.ameren.com/Environment/Pages/ManagingWaste.aspx
EPRI (2010): Evaluation of Coal Combustion Product Damage Cases, Volume 2: Site Information. EPRI 1020554, Final Report, September 2010. Accessed Online August 2012. http://www.epri.com/search/Pages/results.aspx?sq=1&k=Evaluation%20of%20Coal%20Combustion%20 Product%20Damage%20Cases Cherry et al., (2000): Review of the Global Adverse Environmental Impacts to Ground Water and Aquatic Ecosystems from Coal Combustion Wastes. Donald S. Cherry, Rebecca J. Currie, and
David J. Soucek, Biology Department, Virginia Tech., Blacksburg, Virginia, prepared for Hoosier Environmental Council and Citizens Coal Council, Indianapolis, Indiana, March 28, 2000. Accessed Online August 2012. http://www.citizenscoalcouncil.org/wp-content/uploads/2012/07/A-REVIEW-OF-THE-ADVERSEENVIRONMENTAL-IMPACTS-OF-COAL-COMBUS.htm Illinois EPA (2011): IEPA’s Ash Impoundments Strategy Progress Report, October 2011. Accessed Online August 2012. http://www.epa.state.il.us/water/ash-impoundment/documents/ash-impoundment-progress-102511.pdf Ameren (2009): Response to Request for Information under CERCLA Section 104(e), March 26, 2009. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys/ameren.pdf
AECOM (2009): Hutsonville Power Station Pond D Closure – Human Health and Ecological Risk Assessment. AECOM, Inc., Document No.: 10418-003, April 2009. Accessed Online August 2012. http://www.ameren.com/Environment/Documents/PondDRiskAssessment.pdf
EPRI (2002): Manganese Occurrence near Three Coal Ash Impoundments in Illinois, Hensel, B., Lee, L.S, P. Burns, I. Murarka, EPRI Report No.1005257. Supreme Court of Illinois (1987): Central Illinois Public Service Company (CIPS Co.) v. Pollution Control Board, 116 Ill.2d 397 (1987), 507 N.E.2d 819. Central Illinois Public Service Company v. The Pollution Control Board. Nos. 63577, 63583 cons., Supreme Court of Illinois, April 2, 1987. Accessed Online August 2012. http://www.leagle.com/xmlResult.aspx?page=4&xmldoc=1987513116Ill2d397_1489.xml&docbase=CSL WAR2-1986-2006&SizeDisp=7
NRT (2009): Pond D Closure Alternatives Report, Hutsonville Power Station, Crawford County Illinois. Prepared by Natural Resource Technology for Ameren Services, April 27, 2009. Accessed Online July 2014. https://www.ameren.com/.../PondDClosureAlternativesReport.pdf
GZA GeoEnvironmental (2012 ): Final Report Round 10 Dam Assessment, Ameren Energy Generating Company – Hutsonville Power Station, Pond A, Pond B, Pond D, Hutsonville, Illinois, GZA
GeoEnvironmental, Norwood, Massachusetts, October 16, 2012. Accessed Online January 2014. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/ameren_hutson_final.pdf GenerationHub (2014): Illinois board readies look at proposed coal waste rule: The Illinois EPA is proposing new rules for waste from coal-fired power plants. GenerationHub, January 24, 2014. Accessed Online July 2014. http://generationhub.com/pages/article_print.php?aid=2014/01/24/illinois-board-readies-look-atproposed-coal-waste IIa. CCR Damage Case Reassessment December 2014 PTa09. Commonwealth Edison/Midwest Generation Powerton Plant – Mahoney Landfill,
EPA (2007) and a document cited therein155 provide a detailed description of this site and its history.156 The only recent revisions157 comprise a correction of the landfills’ area from 438 acres (as cited in the 1988 Report to Congress) to 40 acres (based on scaling of air photos) and a change in the Plant’s ownership.158 The disposal site consisted of two adjacent landfills located on the bank of Lost Creek that received fly ash, bottom ash, and boiler slag from the Commonwealth Edison Powerton Plant located one mile to the north. The large, older landfill was used for the disposal of CCR from 1972 to 1978. This landfill was designed with an eight-inch ‘Poz-o-Pac’ liner (consisting of a mix of fly ash, slag, and lime).159 However, the Arthur D. Little, Inc. study (1985) observed an absence of liner material during coring operations at most sampling sites. The newer, smaller landfill has a five-foot ‘Poz-o-Pac’ liner, and was used for disposal from 1978 to 1982. It was originally constructed in an abandoned gravel borrow pit.160 Cooling Comment to the 2007 NODA docket: EPA-HQ-RCRA-2006-0796-0022. Cited in EPA (2007). Original study goes back to Envirosphere (1978) and Arthur D. Little, Inc. (1985), and is
Arthur D. Little, Inc. (1985). It is possible that Illinois Coal (1979) addressed this landfill (”ComEd is installing a $60 million wet limestone scrubber on one of four boilers at its Powerton plant near Pekin. The plant is built atop porous soils; because of potential ground water contamination, the state has not yet given the company the requisite permits to dump sludge nearby.”) IIa. CCR Damage Case Reassessment December 2014 water is supplied from the 1,426 acres Powerton Lake.161 The water table at the site occasionally intercepted the ash along the down-gradient edge of the older landfill. The Plant is located in an area of Quaternary fuvioglacial deposits,162 which has a very high potential for aquifer recharge.163
EIP (2011) raises claims about a new damage case associated with the Powerton Plant. These claims, still not addressed by the Utility or the State, relate to the plant’s three active ash ponds: an Ash Basin (holding 31 million gallons), a Secondary Basin (holding 7.5 million gallons), and a Bypass (stormwater) Basin (holding 2.2 million gallons). The stormwater basin is unlined.164 Impact: Groundwater contamination was detected in on-site wells in 1985.165 This case was originally identified during the review of candidate damage cases for the 1988 Report to Congress on Wastes from the Combustion of Coal by Electric Utility Power Plants. Although it was rejected as a proven damage case in EPA’s 1993 Supplemental Analysis of Potential Risks to Human Health and the Environment from Large-Volume Coal Combustion Waste (EPA 1993), this case was re-examined in light of EPA’s subsequently developed criteria for categorizing cases as “potential” damage cases. There were exceedances of primary MCLs for cadmium, lead, and nitrate and secondary MCLs for iron, manganese, and sulfate in ground water and surface water at the site.166 The exceedances of secondary MCLs in ground water appear attributable to the management of CCR. According to EPRI (2010), no homes were observed between the site and the Lost Creek.
EIP (2011) cites evidence for recent groundwater impacts, based on ten down-gradient wells that were first sampled in December, 2010.167 Arsenic exceeded the MCL in one well (26 ppb). Lead exceeded the
MCL in the same well, with a concentration of 39 ppb, 2.6 times the MCL. The LHA for manganese was exceeded in five wells at up to 3.5 ppm, 11.7 times LHA.168 Resolution: The large, older landfill has been closed after ceasing operation in 1978 and capped with two feet of soil cover. There is no information on whether the newer, smaller landfill has been also closed Powerton Lake, built on the floodplain of the Illinois River in 1971 by Commonwealth Edison Company downstream of the Plant, is managed by the Department of Natural Resources as a Fish & Wildlife Area and is open to the public for recreational fishing. It also serves as a receptacle for the plant’s closed cycle cooling water system and the power plant’s wastewater (EIP et al., 2013, Page 17). According to Hlinka et al., (1999, page 11) and Reinstern (1988), the glaciofluvial materials were deposited by meltwater that discharged along the front of the ice sheets during the Kansan, Illinoisan, and Wisconsinan Stages of the Pleistocene Series. These materials were subsequently reworked by prevailing winds to form the small sand dunes. The Kankakee Flood associated with the meltdown of the Valparaiso ice sheet during the Wisconsin-Stage glaciation generated much of the glaciofluvial sequence.
Illinois EPA (2011). See Powerton’s spokesman: http://www.pjstar.com/news/x1238774052/Environmental-groups-file-complaintover-coal-ash?zc_p=0 Comment to the 2007 NODA docket: EPA-HQ-RCRA-2006-0796-0022. For Primary Drinking Water Standards (PDWSs), cadmium exceeded in eight of nine down-gradient well
IEPA. Additionally, on October 3, 2012, four citizens groups170 filed a complaint with the Illinois Pollution Control Board against the Powerton Plant as well as other three Midwest Generation plants.171 Based on Powerton’s own monitoring reports since 2010, at which time monitoring was mandated by
TDS have been measured which exceed Illinois GQS and/or open dumping standards.172 Two of the three ponds at the site are used for ash disposal173 and both are lined. The third, a stormwater retention basin, is unlined. The filed complaint asks Midwest Generation to stop disposing ash in the ponds, start hauling the ash to a landfill in a closed system, and remediate the site to remove all contaminants. Basis for Consideration as a Potential Damage Case: There are exceedances of primary and secondary MCLs in ground water and surface water at the site. The exceedances of secondary MCLs in ground water appear attributable to management of CCW. The exceedances are located in on-site wells and are for constituents with non-health-based standards. Therefore, this case is categorized as a potential damage case.174 References Sierra Club et al., (2012): Sierra Club, Environmental Law and Policy Center, Prairie Rivers Network, and Citizens against Ruining the Environment, Complainants, v. Midwest Generation, LLC, Respondents, Before the Illinois Pollution Control Board. Filed Oct. 3, 2012. Accessed Online December 2014. www.environmentalintegrity.org/.../10-3-12%20ELPC-Complaint%20wi...
EPA (2007): 2007 Coal Combustion Waste Damage Case Assessments, Case #40 and reference therein (Compendium of nineteen alleged coal combustion wastes damage cases, May 3, 2007: EPA-HQ-RCRA2006-0796-0022). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015
EPA (1993): Supplemental Analysis of Potential Risks to Human Health and the Environment from Large-Volume Coal Combustion Waste, US EPA, Appendix D: Summary of Sites with Groundwater
Monitoring, July 30, 1993. Available from the docket for the 1999 Regulatory Determination for Fossil Fuel Combustion (Part 1), EPA-HQ-RCRA-1993-0042-1642. Sierra Club et al, (2012); EIP et al., (2013) and references therein. Environmental Integrity Project, Environmental Law and Policy Center, Prairie Rivers Network, and Citizens against Ruining the Environment. Sierra Club et al, (ibid) and http://www.pjstar.com/news/x1238774052/Environmental-groups-file-complaintover-coal-ash?zc_p=0. The three other plants are Joliet 29, Waukegan, and Will County. Sierra Club et al, (ibid). They are periodically dredged out and the ash is hauled to a landfill. Comment to the 2007 NODA docket, ibid. IIa. CCR Damage Case Reassessment December 2014 Envirosphere (1979): Report to Utility Solid Waste Activities Group and Edison Electric Institute on Environmental Effects of Utility Solid Waste Disposal. Envirosphere Company, New York, New York. July 1979. EPA Docket Number PATA S0021.
Arthur D. Little, Inc. (1985): Full-scale Field Evaluation of Waste Disposal from Coal-fired Electric Generating Plants. Volume 1. Prepared for Environmental Protection Agency, Research Triangle Park, North Carolina. Little (Arthur D.), Inc., Cambridge, Massachusetts. June 1985. PB85-228054.
EPA (1988): Report to Congress on Wastes from the Combustion of Coal by Electric Utility Power
Plants, Appendix E: Arthur D. Little Study of Waste Disposal at Coal-Fired Power Plants, EPA/530-SW88-002. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/coal-rtc.pdf Midwest Generation Powerton Generation Station (2005): Midwest Generation Powerton Generation Station Fact Sheet, Hanuary 2005. Accessed Online January 2013. http://www.edison.com/files/2005_factsheet_powerton.pdf Illinois EPA (2011): IEPA’s Ash Impoundments Strategy Progress Report, October 2011. Accessed Online August 2012. http://www.epa.state.il.us/water/ash-impoundment/documents/ash-impoundment-progress-102511.pdf
EIP (2011): Risky Business: Coal Ash Threatens America’s Groundwater Resources at 19 More Sites, Environmental Integrity Project, December 12, 2011. EPA-HQ-RCRA-2011-0392-0259. Accessed Online January 2013. http://www.environmentalintegrity.org/documents/121311eipthirddamagereport.pdf Illinois Coal (1979): James Krohe Jr., Illinois Periodicals Online, Illinois Issues, September 1979. Accessed Online January 2013. http://www.lib.niu.edu/1979/ii790914.html PeoriaStory (2013): Pekin power plant purchased, October 21, 2013. Accessed Online January 2014. http://peoriastory.typepad.com/peoriastory/2013/10/pekin-power-plant-purchased.html Reinertsen (1988): A Guide to the Geology of the Canton Area, Fulton County, Geological Science Field
PRB by rail to Danville and then trucked to the Vermilion site), the relatively small size of the unit and its older technologies, weak electricity demand, and uncertainty regarding future regulatory requirements. The Vermilion power station has been officially retired from service on December 1, 2011. (http://investing.businessweek.com/research/stocks/private/snapshot.asp?privcapId=34485342).
TDS, and pH (at least sulfate and TDS in down-gradient wells are in excess of their SMCLs.) No monitoring data for trace metals, trace elements, or organics were available. The August 2011 draft reissued NPDES Permit does require semi-annual monitoring and reporting of a variety of trace metals, in addition to phenol and cyanide.188 According to EPRI (2010), the reported groundwater exceedances of sulfate, iron, manganese, and chloride are all based on a database provided by the power company listing all groundwater monitoring results from 1994 through December 2008. EPRI claims that a hydrogeological evaluation performed for the power company in 2002/2003 concluded that all these exceedances were due to factors other than a release from the ash impoundment, in particular, factors related to the presence of coal in the bedrock and former coal mining in the area. EPRI claims that this conclusion is corroborated by the low boron concentrations observed in site monitoring wells.
IEPA and Dynegy surveys conducted in 2009, verified one potable well up-gradient of the ash impoundments, a well used by the facility itself, and no private wells located down-gradient of the impoundments.
Finally, surface water monitoring of the Middle Fork of the Vermilion River does not currently indicate impairment for any potential contaminant.189 Resolution: According to IEPA (2011), a groundwater monitoring plan has been approved for the site, and the results of the initial one year of monitoring, a GMZ application, and a Corrective Action Plan Lining is cited in IEPA (ibid), but Dewberry and Davis (ibid, Appendix C, Document 21) claim that the New East Ash Pond System is unlined. According to Vermilion (2009), this originally 12 acres area, now 28 acres, 340 acre-feet capacity pond had about 34 acre-feet filled with CCR (fly ash, bottom ash, boiler slag, and ‘other’, associated waste). Dewberry & Davis (2012) presented different data, whereby this Pond has an area of 20 acres and 556 acre-feet in storage capacity, of which 331 acre-feet were available during the survey.
EPRI (2010). There, Figure 1. Cherry et al., (2000) cite the following exceedances in monitoring wells down-gradient of the East Ash Pond: sulfate: 610 mg/L, TDS: 1,500 mg/L, and boron: 1.4 mg/L.
IEPA (ibid). http://www.epa.state.il.us/public-notices/2011/dynegy-vermilion/index.pdf
IEPA (ibid). IIa. CCR Damage Case Reassessment December 2014 (including a Closure Work Plan) to deal with contamination issues at the site was due April 1, 2012. According to EPRI (2010), the groundwater monitoring program is in effect. Basis for Consideration as a Potential Damage Case: “The exceedances found at this site, sulfate and total dissolved solids, are of non-health-based standards. Therefore, this case is a potential damage case.”190 References
EPA (2007): Coal Combustion Waste Damage Case Assessments, Case #52 and a reference therein (Memorandum from SAIC to Dennis Ruddy regarding Rationale and Conclusions Regarding CommenterIdentified Fossil Fuel Combustion Waste Damage Cases, April 20, 2000). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015 Cherry et al., (2000): Review of the Global Adverse Environmental Impacts to Ground Water and Aquatic Ecosystems from Coal Combustion Wastes. Donald S. Cherry, Rebecca J. Currie, and
IEPA (2011): Illinois Environmental Protection Agency (IEPA)’s Ash Impoundments Strategy Progress
Report, October 2011. Accessed Online August 2012. http://www.epa.state.il.us/water/ash-impoundment/documents/ash-impoundment-progress-102511.pdf Vermilion (2009): Response to Request for Information under CERCLA Section 104(e), March 24, 2009. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys/dynegy-vermilion.pdf Dewberry & Davis (2011): Coal Combustion Waste Impoundment Round 6 – Final Dam Assessment
Illinois, Dewberry & Davis, LLC, November 2012. Accessed Online August 2012. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys2/dynegy-vermilion-final.pdf Draft NPDES Permit (2012): National Pollutant Discharge Elimination System (NPDES) No. IL0004057 for Dynegy Midwest Generation LLC Vermillion Power Station, 10188 East 2150 North, Oakwood, Illinois 61858, Illinois, Public Notice Beginning Date: August 22, 2012. Environmental Protection Agency Bureau of Water, Division of Water Pollution Control, Permit Section. Accessed Online January 2014. http://www.epa.state.il.us/public-notices/2012/dynegy-vermilion/index.pdf
NPDES IL0000108. A public notice for a renewed/modified NPDES Permit No. IL0064785 was issued on June 8, 2012. According to http://www.ameren.com/sites/aem/AboutAEM/Documents/AEMGenerationPortfolio.pdf, the Plant’s generating capacity is 895 MW. According to http://www.sourcewatch.org/index.php?title=Coffeen_Power_Station, the Plant’s nameplate capacity is 1,005 MW, comprising two generation units (389 MW and 617 MW) that came on line in 1965 and 1972, respectively. According to Ameren’s March 10, 2010 Media Release (http://ameren.mediaroom.com/index.php?s=43&item=793), and Kleinfelder (2011), the plant is located on a peninsula between two branches of Coffeen Lake, about two miles south of the Town of Coffeen. The 1,200-acre, man-made cooling lake is managed by the Illinois Department of Natural Resources. Coffeen Lake provides outdoor recreational activities for boaters, anglers, campers and hunters. A 73-acre cooling basin and a series of 24 cooling towers were built and placed in service in July 2000 to keep Coffeen Lake temperatures within allowable limits during times of extreme heat.
EPRI (2010). In service since 1979: 23 acres in area, 500 acre-feet capacity. In service since 2009: 17 acres in area, 243 acre-feet capacity. For the location of the disposal and recycling units, see Kleinfelder (ibid), Figures 1 and 2. According to NPDES Permit No.
IL0064785 (2012), the facility operates a landfill for the disposal of coal combustion waste and scrubber sludge. Wastewater is generated from water which percolates through cell D, stormwater which contacts the exposed face of fly ash in Cell E, and storm water which contacts the cover areas of cells A, B, C, D and E. Facility operation results in an intermittent discharge of leachate and storm water from outfall 001. The proposed, reissued NPDES permit adds leachate to the permit as an authorized waste stream, for a total of 26 parameters to be discharged in a controlled manner. According to Kleinfelder (ibid), a Decommissioned Ash Pond is located between the Gypsum Reclaim Pond and the Recycle Ash Pond. The pond was decommissioned and capped in 1981. Kleinfelder (ibid), Section 3.3. IIa. CCR Damage Case Reassessment December 2014 Impact: According to EPA (2007), monitoring data at this site200 showed levels of sulfate, total dissolved solids, and manganese in down-gradient wells in excess of their secondary MCLs. Two of the three wells for which the commenters provided data appear to be located directly underneath the landfill area. A May 18, 1995 memorandum from the Illinois Environmental Protection Agency (IEPA) documents areas of
EPA chronic WQC by about four times. According to EPRI (2010), based on groundwater monitoring data from 1982 to 1997, pre-mitigation monitoring showed exceedances of sulfate and manganese. Post-mitigation monitoring, based on samples obtained in 2008-2009, detected onsite exceedances of boron, cadmium, chromium, nickel, thallium, iron, manganese, and sulfate.201 Resolution: IEPA’s May 1995 memo documents areas of dead grass on-site, due to groundwater seepage; and a July 1996 memo discusses IEPA’s recognition of contamination to groundwater as a result of ash disposal operations at the site. As of late in 1998, no further administrative action is known to have taken place regarding the implications of the July 1996 memo.
CCR indicator concentrations, suggesting a potential alternative cause for the observed concentrations. IIa. CCR Damage Case Reassessment December 2014 According to EPRI (2010), the caps of Cells A-D and of Cell E consist of 3-feet of clay with hydraulic conductivity of 10-7 cm/sec. Additional remedial options are being evaluated to eliminate two seeps, where high boron concentrations in the discharge are stressing vegetation. A groundwater monitoring program is in effect.
EPA (2007): Coal Combustion Waste Damage Case Assessments, Case #56 and a reference therein (Memorandum from SAIC to Dennis Ruddy regarding Rationale and Conclusions Regarding CommenterIdentified Fossil Fuel Combustion Waste Damage Cases, April 20, 2000). http://www.regulations.gov/#!documentDetail;D=EPA-HQ-RCRA-2006-0796-0015