{"document":{"doc_id":145917,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 1 BOF Sec BH Stack Test 04/24-25/2012","date":"2019-08-16","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-0177","source_native_id":"EPA-HQ-OAR-2002-0083-0177","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2002-0083"],"rins":["RIN 2060-AV82","RIN 2060-AE48","RIN 2060-AT03","FR 2025-21787","RIN 2060-AW69"],"related":[{"doc_id":156931,"source":"docket_item","org":"EPA","doc_type":"other","title":"Legacy Index for Docket A-2000-44","date":"2001-02-02"},{"doc_id":20902,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"National Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing","date":"2001-07-13"},{"doc_id":135223,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB 83I Form for ICR No. 2003.02 OMB No. 2060 - New Collection","date":"2003-02-28"},{"doc_id":156930,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supporting Statement  for ICR No. 2003.02 OMB No. 2060 - New Collection","date":"2003-02-28"},{"doc_id":19646,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"National Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing","date":"2003-05-20"},{"doc_id":156865,"source":"docket_item","org":"EPA","doc_type":"other","title":"Settlement in the United States Court of Appeals for the District of Columbia Circuit in the Matter of AK Steel Corporation vs. USEPA, Case # 03-1207","date":"2005-09-13"},{"doc_id":156866,"source":"docket_item","org":"EPA","doc_type":"other","title":"Discussion Paper on Performance Test-Based Opacity Limits in the Iron & Steel MACT (Maximum Achievable Control Technology) Rule","date":"2005-09-13"},{"doc_id":156867,"source":"docket_item","org":"EPA","doc_type":"other","title":"Petitioners' Preliminary and Non-Binding Statement of Issues to be Raised","date":"2005-09-13"},{"doc_id":156868,"source":"docket_item","org":"EPA","doc_type":"other","title":"Proposed Alternative to Iron & Steel MACT (Maximum Achieveable Control Technology) Performance Test-Based Opacity Limits","date":"2005-09-13"},{"doc_id":156869,"source":"docket_item","org":"EPA","doc_type":"other","title":"Settlement of Iron & Steel MACT (Maximum Achievable Control Technology) Issues","date":"2005-09-13"},{"doc_id":156870,"source":"docket_item","org":"EPA","doc_type":"other","title":"Iron and Seel MACT (Maximum Achievable Control Technology) Standard for BOF ESP Conceptual Draft - COMS Corrective Action Trigger","date":"2005-09-13"},{"doc_id":159892,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA,/Office of Air Quality, Planning & Standards/Emission Standards Division from John L. Wittenborn and Russell S. Frye, Collier Shannon Scott PLLC re: MACT Standards","date":"2005-09-13"},{"doc_id":159893,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Notes from telephone conversation between Steve Fruh, USEPA, Metals Group; Phil Mulrine, USEPA. Metals Group; Steve Silverman, USEPA, Office of Genera Counsel; Andy Doyle, US Department Justice; Marvin Branscome, RTI; Bruce Steiner, Collier Shannon; Rich Zavoda, International Steel Group; Mike Long, International Steel Group; Tom Shepker, WCI Steel; Matthew Scherschel, Ispat Intland et al.","date":"2005-09-13"},{"doc_id":159894,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Marvin Branscome, USEPA/RTI from Jim R. Carson re: VEE monthly summaries","date":"2005-09-13"},{"doc_id":159895,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Attendance List for October 22, 2003 Meeting of USEPA and Steel Industry Litigants.","date":"2005-09-13"},{"doc_id":159896,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Marvin Branscome, RTI International from Jim Carson re: Sinter Plant","date":"2005-09-13"},{"doc_id":159897,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA, Office of Air Quality Planning and Standards/Emission Standards Division from Bruce A. Steiner, Collier Shannon Scott PLLC re: Iron & Steel MACT (Maximum Achievable Control Technology) rule","date":"2005-09-13"},{"doc_id":159898,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Steve Fruh, USEPA and Phil Mulrine, USEPA from Bruce Steiner, Collier, Shannon, Scott, PLLC re: proposed Iron and Steel MACT (Maximum Achievable Control Technology) Revisions","date":"2005-09-13"},{"doc_id":159899,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Estimate of Savings in Monitoring Costs","date":"2005-09-13"},{"doc_id":159901,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA from Rich Zavoda, ISG Cleveland Inc., re: Iron and Steel MACT (Maximum Achievable Control Technology)/NESHAP (National Emissions Standards for Hazardous Air Pollutants) Discussions","date":"2005-09-13"},{"doc_id":159902,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Opacity Limit for Sinter Coolers","date":"2005-09-13"},{"doc_id":159879,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Mittal Steel Call Summary","date":"2006-07-12"},{"doc_id":17791,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel Manufacturing Facilities","date":"2006-07-13"},{"doc_id":156833,"source":"docket_item","org":"EPA","doc_type":"other","title":"Docket Index Certification","date":"2009-09-21"},{"doc_id":159855,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Pew Response Letter","date":"2009-09-21"},{"doc_id":156832,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supplemental Petition for Reconsideration","date":"2009-09-23"},{"doc_id":129395,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 and 13563 review - II&S NPRM","date":"2019-08-16"},{"doc_id":129396,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of II&S RTR briefing materials and industry schematics - II&S NPRM 2060-AT03 06/13/2019","date":"2019-08-16"},{"doc_id":129397,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Memorandum of 06/18/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03)","date":"2019-08-16"},{"doc_id":129398,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the II&S NPRM (2060-AT03) (07/08/2019)","date":"2019-08-16"},{"doc_id":129399,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency request for supporting technical documents and EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)","date":"2019-08-16"},{"doc_id":129400,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review Interagency responses to EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)","date":"2019-08-16"},{"doc_id":129401,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Memorandum of 07/10/2019 Conference call between EPA, OMB, and AISI - II&S NPRM (2060-AT03)","date":"2019-08-16"},{"doc_id":129402,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of attendee list for 07/10/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03) (07/11/2019)","date":"2019-08-16"},{"doc_id":129403,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the II&S NPRM (2060-AT03) (07/15/2019)","date":"2019-08-16"},{"doc_id":129404,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review Transmittal of redline and clean versions of the revised proposal package  II&S NPRM (2060-AT03) (07/19/2019 12:24PM)","date":"2019-08-16"},{"doc_id":129405,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:38PM)","date":"2019-08-16"},{"doc_id":129406,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Response to OMB Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:49PM)","date":"2019-08-16"},{"doc_id":129407,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of Redline and Clean Versions of the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 1:16PM)","date":"2019-08-16"},{"doc_id":129408,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Confirmation of Revisions to Proposal Package Under E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 2:21PM)","date":"2019-08-16"},{"doc_id":129409,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Confirmation of OMB Conclusion to E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 5:55PM)","date":"2019-08-16"},{"doc_id":129410,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documentation of Changes Made During OMB Review Under E.O. 12866 and 13563  through July 19, 2019 - II&S NPRM","date":"2019-08-16"},{"doc_id":129411,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document Submitted to Conclude E.O. 12866 and 13563 Review - II&S NPRM","date":"2019-08-16"},{"doc_id":129412,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"40 CFR Part 63, Subpart FFFFF: Redline Comparison of Current Regulatory Text and Proposed Amendments","date":"2019-08-16"},{"doc_id":145517,"source":"docket_item","org":"EPA","doc_type":"data","title":"Section 114 II&S FAQ (12/02/2011)","date":"2019-08-16"},{"doc_id":145518,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Ashland, KY (AKS-Ashland-KY) Ladle Refiner Stack Test 10/13-18/2006","date":"2019-08-16"},{"doc_id":145520,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Ashland, KY (AKS-Ashland-KY) BOF Vessel No. 1 Scrubber Stack Test 06/13-14/2012","date":"2019-08-16"},{"doc_id":145521,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Middletown, OH (AKS-Middletown-OH) BOF Vessel 16 Scrubber Stack Test 12/8-9/2009","date":"2019-08-16"},{"doc_id":145522,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Middletown, OH (AKS-Middletown-OH) No. 3 Blast Furnace Stove Stack Test 02/6-7/2012","date":"2019-08-16"},{"doc_id":145523,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Summary of Previous Performance Test Results","date":"2019-08-16"},{"doc_id":145525,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 2 Vessel SC Venturi Scrubber SS&M Plan, October 16, 2006","date":"2019-08-16"},{"doc_id":145527,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BF C Opacity Observations 03/17-04/02/2009","date":"2019-08-16"},{"doc_id":145528,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BOF No. 1 & 2 Vessels Scrubbers No. 2 & 4 Stack Test 11/16/2007","date":"2019-08-16"},{"doc_id":145529,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Ladle Metallurgy Facility No. 1 Stack Test 03/21-22/2012","date":"2019-08-16"},{"doc_id":145530,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) Summary of Previous Performance Tests for No. 5 & No. 6 BF","date":"2019-08-16"},{"doc_id":145532,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 East Cathouse BH Previous Test Tables","date":"2019-08-16"},{"doc_id":145533,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 2SP LMF BH Previous Test Tables","date":"2019-08-16"},{"doc_id":145534,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 3 Sinter Plant DE BH Stack Test 03/7-8/2011","date":"2019-08-16"},{"doc_id":145535,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 4 Steel Producing Stack Test & Opacity Observation 04/11-13/2006","date":"2019-08-16"},{"doc_id":145536,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 West Cathouse BH Stack Test 02/28-3/5/2012","date":"2019-08-16"}],"references":[{"citation_id":1238613,"raw_reference":"PASS 1.836 T-DGM- 001 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 032812 Done By: PB / Date: 3/28/2012 15:15 Air Compliance Testing, Inc. (032812-Pre-Test Meter Console) 4/30/2012 4 - 11","cited_authors":null,"cited_year":null,"cited_title":"PASS 1.836 T-DGM- 001 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 032812 Done By: PB / Date: 3/28/2012 15:15 Air Compliance Testing, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1238614,"raw_reference":"MTB- 009 Pump Number PMP- 009 Job Number: 120401A Done By: PB / Date: 4/27/2012 15:28 Air Compliance Testing, Inc. (120401A-ALT-009 Post-Test Leak Check) 5/8/2012 4 - 12 Method 4 DGM Calibration History Type","cited_authors":null,"cited_year":null,"cited_title":"MTB- 009 Pump Number PMP- 009 Job Number: 120401A Done By: PB / Date: 4/27/2012 15:28 Air Compliance Testing, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1238615,"raw_reference":"PASS 2.067 T-DGM- 010 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 031912 Done By: MC / Date: 3/19/2012 15:56 Air Compliance Testing, Inc. (031912-Pre-Test Meter Console) 4/30/2012 4 - 21 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4\" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number","cited_authors":null,"cited_year":null,"cited_title":"PASS 2.067 T-DGM- 010 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 031912 Done By: MC / Date: 3/19/2012 15:56 Air Compliance Testing, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1238616,"raw_reference":"PASS 1.836 T-DGM- 001 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 032812 Done By: PB / Date: 3/28/2012 15:15 Air Compliance Testing, Inc. (032812-Pre-Test Meter Console) 4/30/2012 4 - 24","cited_authors":null,"cited_year":null,"cited_title":"PASS 1.836 T-DGM- 001 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 032812 Done By: PB / Date: 3/28/2012 15:15 Air Compliance Testing, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1238617,"raw_reference":"MTB- 006 Pump Number PMP- 006 Job Number: 120401 Done By: KL / Date: 5/4/2012 10:30 Air Compliance Testing, Inc. (120401A-ALT-009 Post-Test Leak Check) 5/8/2012 4 - 25","cited_authors":null,"cited_year":null,"cited_title":"MTB- 006 Pump Number PMP- 006 Job Number: 120401 Done By: KL / Date: 5/4/2012 10:30 Air Compliance Testing, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}