Policy Replication

AK Steel, Middletown, OH (AKS-Middletown-OH) No. 16 BOF Vessel Venturi Scrubber SS&M Plan, May 7, 2008

Docket document2019-08-16 · EPA · report · EPA-HQ-OAR-2002-0083-0100
RIN 2060-AV82, RIN 2060-AE48, RIN 2060-AT03, RIN FR 2025-21787, RIN 2060-AW69 · Docket EPA-HQ-OAR-2002-0083

Other documents for the same rulemaking

2001-02-02 Docket documentLegacy Index for Docket A-2000-44
2001-07-13 Federal RegisterNational Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing
2003-02-28 Docket documentOMB 83I Form for ICR No. 2003.02 OMB No. 2060 - New Collection
2003-02-28 Docket documentSupporting Statement for ICR No. 2003.02 OMB No. 2060 - New Collection
2003-05-20 Federal RegisterNational Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing
2005-09-13 Docket documentSettlement in the United States Court of Appeals for the District of Columbia Circuit in the Matter of AK Steel Corporation vs. USEPA, Case # 03-1207
2005-09-13 Docket documentDiscussion Paper on Performance Test-Based Opacity Limits in the Iron & Steel MACT (Maximum Achievable Control Technology) Rule
2005-09-13 Docket documentPetitioners' Preliminary and Non-Binding Statement of Issues to be Raised
2005-09-13 Docket documentProposed Alternative to Iron & Steel MACT (Maximum Achieveable Control Technology) Performance Test-Based Opacity Limits
2005-09-13 Docket documentSettlement of Iron & Steel MACT (Maximum Achievable Control Technology) Issues
2005-09-13 Docket documentIron and Seel MACT (Maximum Achievable Control Technology) Standard for BOF ESP Conceptual Draft - COMS Corrective Action Trigger
2005-09-13 Docket documentLetter to Steve Fruh, USEPA,/Office of Air Quality, Planning & Standards/Emission Standards Division from John L. Wittenborn and Russell S. Frye, Collier Shannon Scott PLLC re: MACT Standards
2005-09-13 Docket documentNotes from telephone conversation between Steve Fruh, USEPA, Metals Group; Phil Mulrine, USEPA. Metals Group; Steve Silverman, USEPA, Office of Genera Counsel; Andy Doyle, US Department Justice; Marvin Branscome, RTI; Bruce Steiner, Collier Shannon; Rich Zavoda, International Steel Group; Mike Long, International Steel Group; Tom Shepker, WCI Steel; Matthew Scherschel, Ispat Intland et al.
2005-09-13 Docket documentEmail to Marvin Branscome, USEPA/RTI from Jim R. Carson re: VEE monthly summaries
2005-09-13 Docket documentAttendance List for October 22, 2003 Meeting of USEPA and Steel Industry Litigants.
2005-09-13 Docket documentEmail to Marvin Branscome, RTI International from Jim Carson re: Sinter Plant
2005-09-13 Docket documentLetter to Steve Fruh, USEPA, Office of Air Quality Planning and Standards/Emission Standards Division from Bruce A. Steiner, Collier Shannon Scott PLLC re: Iron & Steel MACT (Maximum Achievable Control Technology) rule
2005-09-13 Docket documentEmail to Steve Fruh, USEPA and Phil Mulrine, USEPA from Bruce Steiner, Collier, Shannon, Scott, PLLC re: proposed Iron and Steel MACT (Maximum Achievable Control Technology) Revisions
2005-09-13 Docket documentMemorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Estimate of Savings in Monitoring Costs
2005-09-13 Docket documentLetter to Steve Fruh, USEPA from Rich Zavoda, ISG Cleveland Inc., re: Iron and Steel MACT (Maximum Achievable Control Technology)/NESHAP (National Emissions Standards for Hazardous Air Pollutants) Discussions
2005-09-13 Docket documentMemorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Opacity Limit for Sinter Coolers
2006-07-12 Docket documentMittal Steel Call Summary
2006-07-13 Federal RegisterNational Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel Manufacturing Facilities
2009-09-21 Docket documentDocket Index Certification
2009-09-21 Docket documentPew Response Letter
2009-09-23 Docket documentSupplemental Petition for Reconsideration
2019-08-16 Docket documentDocument submitted to initiate E.O. 12866 and 13563 review - II&S NPRM
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of II&S RTR briefing materials and industry schematics - II&S NPRM 2060-AT03 06/13/2019
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Memorandum of 06/18/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Comments on the II&S NPRM (2060-AT03) (07/08/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency request for supporting technical documents and EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review Interagency responses to EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Memorandum of 07/10/2019 Conference call between EPA, OMB, and AISI - II&S NPRM (2060-AT03)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of attendee list for 07/10/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03) (07/11/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the II&S NPRM (2060-AT03) (07/15/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review Transmittal of redline and clean versions of the revised proposal package II&S NPRM (2060-AT03) (07/19/2019 12:24PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:38PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Response to OMB Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:49PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of Redline and Clean Versions of the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 1:16PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Confirmation of Revisions to Proposal Package Under E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 2:21PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Confirmation of OMB Conclusion to E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 5:55PM)
2019-08-16 Docket documentDocumentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through July 19, 2019 - II&S NPRM
2019-08-16 Docket documentDocument Submitted to Conclude E.O. 12866 and 13563 Review - II&S NPRM
2019-08-16 Docket document40 CFR Part 63, Subpart FFFFF: Redline Comparison of Current Regulatory Text and Proposed Amendments
2019-08-16 Docket documentSection 114 II&S FAQ (12/02/2011)
2019-08-16 Docket documentAK Steel, Ashland, KY (AKS-Ashland-KY) Ladle Refiner Stack Test 10/13-18/2006
2019-08-16 Docket documentAK Steel, Ashland, KY (AKS-Ashland-KY) BOF Vessel No. 1 Scrubber Stack Test 06/13-14/2012
2019-08-16 Docket documentAK Steel, Middletown, OH (AKS-Middletown-OH) BOF Vessel 16 Scrubber Stack Test 12/8-9/2009
2019-08-16 Docket documentAK Steel, Middletown, OH (AKS-Middletown-OH) No. 3 Blast Furnace Stove Stack Test 02/6-7/2012
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Summary of Previous Performance Test Results
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 2 Vessel SC Venturi Scrubber SS&M Plan, October 16, 2006
2019-08-16 Docket documentArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BF C Opacity Observations 03/17-04/02/2009
2019-08-16 Docket documentArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BOF No. 1 & 2 Vessels Scrubbers No. 2 & 4 Stack Test 11/16/2007
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Ladle Metallurgy Facility No. 1 Stack Test 03/21-22/2012
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) Summary of Previous Performance Tests for No. 5 & No. 6 BF
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 East Cathouse BH Previous Test Tables
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 2SP LMF BH Previous Test Tables
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 3 Sinter Plant DE BH Stack Test 03/7-8/2011
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 4 Steel Producing Stack Test & Opacity Observation 04/11-13/2006
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 West Cathouse BH Stack Test 02/28-3/5/2012

References: 7 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
AKWEP 4.4.3.1 E Tools for the Job Task None Records None Job Procedures Notify pump tender by radio to check venturi pumps. If venturi pumps are OK, pump tender is to check hot well level and then go to quencher pit to restart quencher pump. After starting the quencher pumps, pump tender will notify melting pulpit. Furnace operator will monitor HMI Scrubbing Water Screen to confirm that the automatic valve is maintaining quencher tank level. Possible Quality Problem (to line item 2.1) If tank level is not controlling, electronic repair must inspect automatic valve and repair. Another problem could be the bubbler. Electronic repair must blow down the bubbler. If furnace operator still does not have enough flow, pump tender will switch quencher pumps and maintenance will inspect automatic valves above quencher pumps to confirm valve operation. Form No. AKQSOPE; Rev. 1; 1/05 •This document is only valid for 24 hours from 3:03 •m,November 8, 2011. AKSteei # 13-MELT-E8 E Steelmaking Department/Section Page 2 of 3 Version Level Revision Date 08/16/2002 *CON F DENTIAL'' rroperty (ri AK Sted O. No Dnplicare Electronic repair and maintenance will notify furnace operator that the vessel is safe to operate after they determine that the scrubbing water system is controlling. Call the Main Gate on ext. 3694 so that Environmental Affairs can be notified as per
research reportNot linked to a paper · refsec
AKWEP 4.4.3.1 E. 6. In the event of an environmental emergency, the department shall provide corrective and preventative action plans once the incident has been mitigated. Form No. AKQSOPE; Rev. 1; 1 /05 This document is only valid for 24 hours from 3:03 m November 8 2011. Steelmaking At AK Steel Department/Section Page 3 of 3 Version Level Revision Date # 13-MELT-E8 E 05116/2002
research reportNot linked to a paper · refsec
AKWEP 4.4.3.1E Tools for the Job Task None Records Melting Tum Delay Sheet MWBOF #046 Scrubber Differential Pressure and Water Flow Rate Corrective Action Plan MWBOF #112 Vessel Primary Emissions Control System Malfunction Procedure Reporting Form MWBOF #113 Job Procedures A report must be logged by telephone to Security - Main Gate - Phone 3694 whenever there is an occurrence such as: Pouring hot metal at emergency pouring station. Lancing vessel skulls with oxygen pipes. Failure of main hot metal pouring station baghouse system. Failure of main skimmer baghouse system. Vessel off-gas system control problems if significant. Outside desulf baghouse system failures. Whenever a heat is dumped on ground. Failure of the secondary emissions baghouse system. Form No. AKQSOPE; Rev. I; 1/05 This document is onl valid for 24 hours from 3:03 m November 8 2011.
research reportNot linked to a paper · refsec
AC AK Steel # 13-0172-04E Steelmaking. / Melting Department/Section Page 2 of 3 Version Level Revision Date 05/04/2009 *CONFIDENTIAL* Property Of AK Steel - Du Not Duplicate The report must detail: When was the occurrence? What caused occurrence? How long will this condition continue? Any other details pertaining to occurrence. In the event that an exceedance (i.e. a value below the operating limit) of an oxygen blow hour average differential pressure and/or water flow rate across the venturi scrubber occurs form MWBOF #112 (Scrubber Differential Pressure and Water Flow Rate Corrective Action Plan) will be filled out completely. Note that the investigation into the cause of the exceedance must begin within 1 hour of the event. This will be the responsibility of the Melter and BOF maintenance supervisor on duty. When finished it is to be faxed to Environmental Affairs at 3079. In the event that a vessel scrubber (primary emissions control systern) fails while the vessel is processing a heat forrn MWBOF #113 (Vessel Prirnary Emissions Control System Malfunction Procedure Reporting Form) is to be filled out by the melter and faxed to Environmental Affairs at 3079. (Note that Environmental Affairs must be notified according to AKWEP 4.4.3.1 E.)
research reportNot linked to a paper · refsec
AC AK Steel # 13-EMER-50-E Page 3 of 3 02/13/2008 Version Level Revision Date
research reportNot linked to a paper · refsec
RESPONSIBILITIES Department managers are responsible for communicating this information to their personnel and reporting such events to the Main Gate/Security at 3694. Security will then be responsible for contacting Middletown Works Environmental Affairs. Approved by: Works General Manager Environmental Affairs Form No. AKWEP; Rev. 0; 1101 This document is only valid for 24 hours from 2:54 m November 8 2011. Origination Date: 04/04/2002
research reportNot linked to a paper · refsec
LOCATION: Middletown SUBJECT: Environmental Notification For Spills,Upsets & Malfunctions Revision Date: 10/16/2008 AXS1eal Page 2 of 3 Examples of Air Pollution Control Equipment Malfunctions 1. All outages of scrubbers, baghouses, hood collection systems, etc.
research reportNot linked to a paper · refsec