ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 1 BOF Vessel No. 1 & No. 2 Stack Test 10/20-24/2011
Other documents for the same rulemaking
References: 11 extracted, 0 linked to papers
PASS 1.610 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (090811.xls-Pre-Test Meter Console) 9/26/2011 Job Number: 110908 Done By: KL / Date: 9/8/2011 16:06 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
MTB- 010 Pump Number PMP- 010 Air Compliance Testing, Inc. (092611.xls-Meter Box Pre-Test Leak Check) 10/11/2011
PASS 2.022 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/11/2011 Job Number: 110902 Done By: PB / Date: 9/26/2011 10:43 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
MTB- 018 Pump Number PMP- 018 Air Compliance Testing, Inc. (092611.xls-Meter Box Pre-Test Leak Check) 10/20/2011
PASS 1.910 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/20/2011 Job Number: 092611 Done By: MC / Date: 9/26/2011 15:59
MTB- 018 Pump Number PMP- 006 Air Compliance Testing, Inc. (111012A.xls-ALT-009 Post-Test Leak Check) 11/18/2011 Job Number: 111012A Done By: PB / Date: 11/18/2011 12:15
PASS 2.022 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110902 Done By: PB / Date: 9/26/2011 10:43 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/11/2011 4 - 38 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 1.610 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110908 Done By: KL / Date: 9/8/2011 16:06 Air Compliance Testing, Inc. (090811.xls-Pre-Test Meter Console) 9/26/2011 4 - 41 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 2.346 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 092311 Done By: MC / Date: 9/23/2011 16:34 Air Compliance Testing, Inc. (092311.xls-Pre-Test Meter Console) 11/3/2011 4 - 44 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 1.910 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 092611 Done By: MC / Date: 9/26/2011 15:59 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/20/2011 4 - 47 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
PASS 1.850 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110902 Done By: PB / Date: 9/26/2011 16:44 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 11/14/2011 4 - 50