Policy Replication

ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 1 BOF Vessel No. 1 & No. 2 Stack Test 10/20-24/2011

Docket document2019-08-16 · EPA · report · EPA-HQ-OAR-2002-0083-0179
RIN 2060-AV82, RIN 2060-AE48, RIN 2060-AT03, RIN FR 2025-21787, RIN 2060-AW69 · Docket EPA-HQ-OAR-2002-0083

Other documents for the same rulemaking

2001-02-02 Docket documentLegacy Index for Docket A-2000-44
2001-07-13 Federal RegisterNational Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing
2003-02-28 Docket documentOMB 83I Form for ICR No. 2003.02 OMB No. 2060 - New Collection
2003-02-28 Docket documentSupporting Statement for ICR No. 2003.02 OMB No. 2060 - New Collection
2003-05-20 Federal RegisterNational Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing
2005-09-13 Docket documentSettlement in the United States Court of Appeals for the District of Columbia Circuit in the Matter of AK Steel Corporation vs. USEPA, Case # 03-1207
2005-09-13 Docket documentDiscussion Paper on Performance Test-Based Opacity Limits in the Iron & Steel MACT (Maximum Achievable Control Technology) Rule
2005-09-13 Docket documentPetitioners' Preliminary and Non-Binding Statement of Issues to be Raised
2005-09-13 Docket documentProposed Alternative to Iron & Steel MACT (Maximum Achieveable Control Technology) Performance Test-Based Opacity Limits
2005-09-13 Docket documentSettlement of Iron & Steel MACT (Maximum Achievable Control Technology) Issues
2005-09-13 Docket documentIron and Seel MACT (Maximum Achievable Control Technology) Standard for BOF ESP Conceptual Draft - COMS Corrective Action Trigger
2005-09-13 Docket documentLetter to Steve Fruh, USEPA,/Office of Air Quality, Planning & Standards/Emission Standards Division from John L. Wittenborn and Russell S. Frye, Collier Shannon Scott PLLC re: MACT Standards
2005-09-13 Docket documentNotes from telephone conversation between Steve Fruh, USEPA, Metals Group; Phil Mulrine, USEPA. Metals Group; Steve Silverman, USEPA, Office of Genera Counsel; Andy Doyle, US Department Justice; Marvin Branscome, RTI; Bruce Steiner, Collier Shannon; Rich Zavoda, International Steel Group; Mike Long, International Steel Group; Tom Shepker, WCI Steel; Matthew Scherschel, Ispat Intland et al.
2005-09-13 Docket documentEmail to Marvin Branscome, USEPA/RTI from Jim R. Carson re: VEE monthly summaries
2005-09-13 Docket documentAttendance List for October 22, 2003 Meeting of USEPA and Steel Industry Litigants.
2005-09-13 Docket documentEmail to Marvin Branscome, RTI International from Jim Carson re: Sinter Plant
2005-09-13 Docket documentLetter to Steve Fruh, USEPA, Office of Air Quality Planning and Standards/Emission Standards Division from Bruce A. Steiner, Collier Shannon Scott PLLC re: Iron & Steel MACT (Maximum Achievable Control Technology) rule
2005-09-13 Docket documentEmail to Steve Fruh, USEPA and Phil Mulrine, USEPA from Bruce Steiner, Collier, Shannon, Scott, PLLC re: proposed Iron and Steel MACT (Maximum Achievable Control Technology) Revisions
2005-09-13 Docket documentMemorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Estimate of Savings in Monitoring Costs
2005-09-13 Docket documentLetter to Steve Fruh, USEPA from Rich Zavoda, ISG Cleveland Inc., re: Iron and Steel MACT (Maximum Achievable Control Technology)/NESHAP (National Emissions Standards for Hazardous Air Pollutants) Discussions
2005-09-13 Docket documentMemorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Opacity Limit for Sinter Coolers
2006-07-12 Docket documentMittal Steel Call Summary
2006-07-13 Federal RegisterNational Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel Manufacturing Facilities
2009-09-21 Docket documentDocket Index Certification
2009-09-21 Docket documentPew Response Letter
2009-09-23 Docket documentSupplemental Petition for Reconsideration
2019-08-16 Docket documentDocument submitted to initiate E.O. 12866 and 13563 review - II&S NPRM
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of II&S RTR briefing materials and industry schematics - II&S NPRM 2060-AT03 06/13/2019
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Memorandum of 06/18/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Interagency Comments on the II&S NPRM (2060-AT03) (07/08/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency request for supporting technical documents and EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review Interagency responses to EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Memorandum of 07/10/2019 Conference call between EPA, OMB, and AISI - II&S NPRM (2060-AT03)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of attendee list for 07/10/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03) (07/11/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the II&S NPRM (2060-AT03) (07/15/2019)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review Transmittal of redline and clean versions of the revised proposal package II&S NPRM (2060-AT03) (07/19/2019 12:24PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:38PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Response to OMB Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:49PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Transmittal of Redline and Clean Versions of the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 1:16PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Confirmation of Revisions to Proposal Package Under E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 2:21PM)
2019-08-16 Docket documentPart of E.O. 12866 and 13563 Review: Confirmation of OMB Conclusion to E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 5:55PM)
2019-08-16 Docket documentDocumentation of Changes Made During OMB Review Under E.O. 12866 and 13563 through July 19, 2019 - II&S NPRM
2019-08-16 Docket documentDocument Submitted to Conclude E.O. 12866 and 13563 Review - II&S NPRM
2019-08-16 Docket document40 CFR Part 63, Subpart FFFFF: Redline Comparison of Current Regulatory Text and Proposed Amendments
2019-08-16 Docket documentSection 114 II&S FAQ (12/02/2011)
2019-08-16 Docket documentAK Steel, Ashland, KY (AKS-Ashland-KY) Ladle Refiner Stack Test 10/13-18/2006
2019-08-16 Docket documentAK Steel, Ashland, KY (AKS-Ashland-KY) BOF Vessel No. 1 Scrubber Stack Test 06/13-14/2012
2019-08-16 Docket documentAK Steel, Middletown, OH (AKS-Middletown-OH) BOF Vessel 16 Scrubber Stack Test 12/8-9/2009
2019-08-16 Docket documentAK Steel, Middletown, OH (AKS-Middletown-OH) No. 3 Blast Furnace Stove Stack Test 02/6-7/2012
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Summary of Previous Performance Test Results
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 2 Vessel SC Venturi Scrubber SS&M Plan, October 16, 2006
2019-08-16 Docket documentArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BF C Opacity Observations 03/17-04/02/2009
2019-08-16 Docket documentArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BOF No. 1 & 2 Vessels Scrubbers No. 2 & 4 Stack Test 11/16/2007
2019-08-16 Docket documentArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Ladle Metallurgy Facility No. 1 Stack Test 03/21-22/2012
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) Summary of Previous Performance Tests for No. 5 & No. 6 BF
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 East Cathouse BH Previous Test Tables
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 2SP LMF BH Previous Test Tables
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 3 Sinter Plant DE BH Stack Test 03/7-8/2011
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 4 Steel Producing Stack Test & Opacity Observation 04/11-13/2006
2019-08-16 Docket documentArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 West Cathouse BH Stack Test 02/28-3/5/2012

References: 11 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
PASS 1.610 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (090811.xls-Pre-Test Meter Console) 9/26/2011 Job Number: 110908 Done By: KL / Date: 9/8/2011 16:06 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
MTB- 010 Pump Number PMP- 010 Air Compliance Testing, Inc. (092611.xls-Meter Box Pre-Test Leak Check) 10/11/2011
research reportNot linked to a paper · refsec
PASS 2.022 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/11/2011 Job Number: 110902 Done By: PB / Date: 9/26/2011 10:43 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
MTB- 018 Pump Number PMP- 018 Air Compliance Testing, Inc. (092611.xls-Meter Box Pre-Test Leak Check) 10/20/2011
research reportNot linked to a paper · refsec
PASS 1.910 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/20/2011 Job Number: 092611 Done By: MC / Date: 9/26/2011 15:59
research reportNot linked to a paper · refsec
MTB- 018 Pump Number PMP- 006 Air Compliance Testing, Inc. (111012A.xls-ALT-009 Post-Test Leak Check) 11/18/2011 Job Number: 111012A Done By: PB / Date: 11/18/2011 12:15
research reportNot linked to a paper · refsec
PASS 2.022 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110902 Done By: PB / Date: 9/26/2011 10:43 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/11/2011 4 - 38 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
PASS 1.610 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110908 Done By: KL / Date: 9/8/2011 16:06 Air Compliance Testing, Inc. (090811.xls-Pre-Test Meter Console) 9/26/2011 4 - 41 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
PASS 2.346 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 092311 Done By: MC / Date: 9/23/2011 16:34 Air Compliance Testing, Inc. (092311.xls-Pre-Test Meter Console) 11/3/2011 4 - 44 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
PASS 1.910 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 092611 Done By: MC / Date: 9/26/2011 15:59 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 10/20/2011 4 - 47 Meter Box Pre-Test Leak Check Remove the front panel from the meter box Disconnect the fan Hook up the proper pump to the meter box Close both the fine and coarse adjustment valves Connect the DH hoses on the front of the meter box Remove the copper elbow from stainless tube at the exit side of gas meter Stopper the stainless tube with a rubber stopper Disconnect the DH static line from the orifice (bottom) Plug in leak check tube into the static side of the orifice Blowing into the leak check tube, pressurize the system to 5-7 inches and clamp off Hold for one minute No leakage should occur. If leak is present, it must be corrected Affix (w/ electrical tape) the copper elbow onto the stainless tube at the exit side of gas meter Reassemble meter box Plug in capped swagelok stem at sample inlet Start pump, bringing system vacuum to at least 15 in. Hg Note DGM reading, start timer Observe DGM for one minute No leakage should occur. If leak is present, it must be corrected Check oil wick position (should be 1/4" above the black O-ring) Check pump oil level (should be at fill line) Meter Box Number
research reportNot linked to a paper · refsec
PASS 1.850 T-DGM- 006 Add Values to 30 Day Calibration History Add Values to Dry Gas Meter Calibration History Tag Meter Box Job Number: 110902 Done By: PB / Date: 9/26/2011 16:44 Air Compliance Testing, Inc. (092611.xls-Pre-Test Meter Console) 11/14/2011 4 - 50
research reportNot linked to a paper · refsec