{"document":{"doc_id":145586,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Middletown, OH (AKS-Middletown-OH) No. 15 BOF Vessel Venturi Scrubber SS&M Plan, May 7, 2008","date":"2019-08-16","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-0099","source_native_id":"EPA-HQ-OAR-2002-0083-0099","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2002-0083"],"rins":["RIN 2060-AV82","RIN 2060-AE48","RIN 2060-AT03","FR 2025-21787","RIN 2060-AW69"],"related":[{"doc_id":156931,"source":"docket_item","org":"EPA","doc_type":"other","title":"Legacy Index for Docket A-2000-44","date":"2001-02-02"},{"doc_id":20902,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"National Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing","date":"2001-07-13"},{"doc_id":135223,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"OMB 83I Form for ICR No. 2003.02 OMB No. 2060 - New Collection","date":"2003-02-28"},{"doc_id":156930,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supporting Statement  for ICR No. 2003.02 OMB No. 2060 - New Collection","date":"2003-02-28"},{"doc_id":19646,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"National Emission Standards for Hazardous Air Pollutants: Integrated Iron and Steel Manufacturing","date":"2003-05-20"},{"doc_id":156865,"source":"docket_item","org":"EPA","doc_type":"other","title":"Settlement in the United States Court of Appeals for the District of Columbia Circuit in the Matter of AK Steel Corporation vs. USEPA, Case # 03-1207","date":"2005-09-13"},{"doc_id":156866,"source":"docket_item","org":"EPA","doc_type":"other","title":"Discussion Paper on Performance Test-Based Opacity Limits in the Iron & Steel MACT (Maximum Achievable Control Technology) Rule","date":"2005-09-13"},{"doc_id":156867,"source":"docket_item","org":"EPA","doc_type":"other","title":"Petitioners' Preliminary and Non-Binding Statement of Issues to be Raised","date":"2005-09-13"},{"doc_id":156868,"source":"docket_item","org":"EPA","doc_type":"other","title":"Proposed Alternative to Iron & Steel MACT (Maximum Achieveable Control Technology) Performance Test-Based Opacity Limits","date":"2005-09-13"},{"doc_id":156869,"source":"docket_item","org":"EPA","doc_type":"other","title":"Settlement of Iron & Steel MACT (Maximum Achievable Control Technology) Issues","date":"2005-09-13"},{"doc_id":156870,"source":"docket_item","org":"EPA","doc_type":"other","title":"Iron and Seel MACT (Maximum Achievable Control Technology) Standard for BOF ESP Conceptual Draft - COMS Corrective Action Trigger","date":"2005-09-13"},{"doc_id":159892,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA,/Office of Air Quality, Planning & Standards/Emission Standards Division from John L. Wittenborn and Russell S. Frye, Collier Shannon Scott PLLC re: MACT Standards","date":"2005-09-13"},{"doc_id":159893,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Notes from telephone conversation between Steve Fruh, USEPA, Metals Group; Phil Mulrine, USEPA. Metals Group; Steve Silverman, USEPA, Office of Genera Counsel; Andy Doyle, US Department Justice; Marvin Branscome, RTI; Bruce Steiner, Collier Shannon; Rich Zavoda, International Steel Group; Mike Long, International Steel Group; Tom Shepker, WCI Steel; Matthew Scherschel, Ispat Intland et al.","date":"2005-09-13"},{"doc_id":159894,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Marvin Branscome, USEPA/RTI from Jim R. Carson re: VEE monthly summaries","date":"2005-09-13"},{"doc_id":159895,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Attendance List for October 22, 2003 Meeting of USEPA and Steel Industry Litigants.","date":"2005-09-13"},{"doc_id":159896,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Marvin Branscome, RTI International from Jim Carson re: Sinter Plant","date":"2005-09-13"},{"doc_id":159897,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA, Office of Air Quality Planning and Standards/Emission Standards Division from Bruce A. Steiner, Collier Shannon Scott PLLC re: Iron & Steel MACT (Maximum Achievable Control Technology) rule","date":"2005-09-13"},{"doc_id":159898,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Email to Steve Fruh, USEPA and Phil Mulrine, USEPA from Bruce Steiner, Collier, Shannon, Scott, PLLC re: proposed Iron and Steel MACT (Maximum Achievable Control Technology) Revisions","date":"2005-09-13"},{"doc_id":159899,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Estimate of Savings in Monitoring Costs","date":"2005-09-13"},{"doc_id":159901,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Letter to Steve Fruh, USEPA from Rich Zavoda, ISG Cleveland Inc., re: Iron and Steel MACT (Maximum Achievable Control Technology)/NESHAP (National Emissions Standards for Hazardous Air Pollutants) Discussions","date":"2005-09-13"},{"doc_id":159902,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum to USEPA/Docket OAR from USEPA/OAQPS/ESD re: Opacity Limit for Sinter Coolers","date":"2005-09-13"},{"doc_id":159879,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Mittal Steel Call Summary","date":"2006-07-12"},{"doc_id":17791,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel Manufacturing Facilities","date":"2006-07-13"},{"doc_id":156833,"source":"docket_item","org":"EPA","doc_type":"other","title":"Docket Index Certification","date":"2009-09-21"},{"doc_id":159855,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Pew Response Letter","date":"2009-09-21"},{"doc_id":156832,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supplemental Petition for Reconsideration","date":"2009-09-23"},{"doc_id":129395,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 and 13563 review - II&S NPRM","date":"2019-08-16"},{"doc_id":129396,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of II&S RTR briefing materials and industry schematics - II&S NPRM 2060-AT03 06/13/2019","date":"2019-08-16"},{"doc_id":129397,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Memorandum of 06/18/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03)","date":"2019-08-16"},{"doc_id":129398,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Interagency Comments on the II&S NPRM (2060-AT03) (07/08/2019)","date":"2019-08-16"},{"doc_id":129399,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency request for supporting technical documents and EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)","date":"2019-08-16"},{"doc_id":129400,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review Interagency responses to EPA questions on the II&S NPRM (2060-AT03) (07/09/2019)","date":"2019-08-16"},{"doc_id":129401,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Memorandum of 07/10/2019 Conference call between EPA, OMB, and AISI - II&S NPRM (2060-AT03)","date":"2019-08-16"},{"doc_id":129402,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of attendee list for 07/10/2019 Conference call between EPA and OMB - II&S NPRM (2060-AT03) (07/11/2019)","date":"2019-08-16"},{"doc_id":129403,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Comments on the II&S NPRM (2060-AT03) (07/15/2019)","date":"2019-08-16"},{"doc_id":129404,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review Transmittal of redline and clean versions of the revised proposal package  II&S NPRM (2060-AT03) (07/19/2019 12:24PM)","date":"2019-08-16"},{"doc_id":129405,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:38PM)","date":"2019-08-16"},{"doc_id":129406,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Response to OMB Text Revisions to the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 12:49PM)","date":"2019-08-16"},{"doc_id":129407,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Transmittal of Redline and Clean Versions of the Revised Proposal Package - II&S NPRM (2060-AT03) (07/19/2019 1:16PM)","date":"2019-08-16"},{"doc_id":129408,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Confirmation of Revisions to Proposal Package Under E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 2:21PM)","date":"2019-08-16"},{"doc_id":129409,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: Confirmation of OMB Conclusion to E.O. 12866 and 13563 Review - II&S NPRM (2060-AT03) (07/19/2019 5:55PM)","date":"2019-08-16"},{"doc_id":129410,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documentation of Changes Made During OMB Review Under E.O. 12866 and 13563  through July 19, 2019 - II&S NPRM","date":"2019-08-16"},{"doc_id":129411,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document Submitted to Conclude E.O. 12866 and 13563 Review - II&S NPRM","date":"2019-08-16"},{"doc_id":129412,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"40 CFR Part 63, Subpart FFFFF: Redline Comparison of Current Regulatory Text and Proposed Amendments","date":"2019-08-16"},{"doc_id":145517,"source":"docket_item","org":"EPA","doc_type":"data","title":"Section 114 II&S FAQ (12/02/2011)","date":"2019-08-16"},{"doc_id":145518,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Ashland, KY (AKS-Ashland-KY) Ladle Refiner Stack Test 10/13-18/2006","date":"2019-08-16"},{"doc_id":145520,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Ashland, KY (AKS-Ashland-KY) BOF Vessel No. 1 Scrubber Stack Test 06/13-14/2012","date":"2019-08-16"},{"doc_id":145521,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Middletown, OH (AKS-Middletown-OH) BOF Vessel 16 Scrubber Stack Test 12/8-9/2009","date":"2019-08-16"},{"doc_id":145522,"source":"docket_item","org":"EPA","doc_type":"report","title":"AK Steel, Middletown, OH (AKS-Middletown-OH) No. 3 Blast Furnace Stove Stack Test 02/6-7/2012","date":"2019-08-16"},{"doc_id":145523,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Summary of Previous Performance Test Results","date":"2019-08-16"},{"doc_id":145525,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) No. 2 Vessel SC Venturi Scrubber SS&M Plan, October 16, 2006","date":"2019-08-16"},{"doc_id":145527,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BF C Opacity Observations 03/17-04/02/2009","date":"2019-08-16"},{"doc_id":145528,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Burns Harbor, IN (AM-BurnsHarbor-IN) BOF No. 1 & 2 Vessels Scrubbers No. 2 & 4 Stack Test 11/16/2007","date":"2019-08-16"},{"doc_id":145529,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Cleveland, OH (AM-Cleveland-OH) Ladle Metallurgy Facility No. 1 Stack Test 03/21-22/2012","date":"2019-08-16"},{"doc_id":145530,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) Summary of Previous Performance Tests for No. 5 & No. 6 BF","date":"2019-08-16"},{"doc_id":145532,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 East Cathouse BH Previous Test Tables","date":"2019-08-16"},{"doc_id":145533,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 2SP LMF BH Previous Test Tables","date":"2019-08-16"},{"doc_id":145534,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 3 Sinter Plant DE BH Stack Test 03/7-8/2011","date":"2019-08-16"},{"doc_id":145535,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) No. 4 Steel Producing Stack Test & Opacity Observation 04/11-13/2006","date":"2019-08-16"},{"doc_id":145536,"source":"docket_item","org":"EPA","doc_type":"report","title":"ArcelorMittal, Indiana Harbor East, IN (AM-IndianaHarbor-E) IH7 West Cathouse BH Stack Test 02/28-3/5/2012","date":"2019-08-16"}],"references":[{"citation_id":1235119,"raw_reference":"AKWEP 4.4.3.1 E Tools for the Job Task None Records None Job Procedures Notify pump tender by radio to check venturi pumps. If venturi pumps are OK, pump tender is to check hot well level and then go to quencher pit to restart quencher pump. After starting the quencher pumps, pump tender will notify melting pulpit. Furnace operator will monitor HMI Scrubbing Water Screen to confirm that the automatic valve is maintaining quencher tank level. Possible Quality Problem (to line item 2.1) If tank level is not controlling, electronic repair must inspect automatic valve and repair. Another problem could be the bubbler. Electronic repair must blow down the bubbler. If fitmace operator still does not have enough flow, pump tender will switch quencher pumps and maintenance will inspect automatic valves above quencher pumps to confirm valve operation. Form No. AICQSOPE; Rev. 1; 1/05 This document is onl valid for 24 hours from 3:03 .m November 8 2011. Steelmaking AKSteei 13-MELT-E8 E Department/Section Page 2 of 3 Version Level 08/16/2002 Revision Dote *CONFIDENTIAL', Property Of A I( Steel Du Not Duplicate Electronic repair and maintenance will notify furnace operator that the vessel is safe to operate after they determine that the scrubbing water system is controlling. Call the Main Gate on ext. 3694 so that Environmental Affairs can be notified as per","cited_authors":"AKWEP 4.4.3.1 E Tools for the Job Task None Records None Job Procedures Notify pump tender by radio to check venturi pumps. If venturi pumps are OK, pump tender is to check hot well level and then go to quencher pit to restart quencher pump. After starting the quencher pumps, pump tender will notify melting pulpit. Furnace operator will monitor HMI Scrubbing Water Screen to confirm that the automatic valve is maintaining quencher tank level. Possible Quality Problem (to line item 2.1) If tank level is not controlling, electronic repair must inspect automatic valve and repair. Another problem could be the bubbler. Electronic repair must blow down the bubbler. If fitmace operator still does not have enough flow, pump tender will switch quencher pumps and maintenance will inspect automatic valves above quencher pumps to confirm valve operation. Form No. AICQSOPE; Rev. 1; 1/05 This document is onl valid for 24 hours from 3:03 .m November 8","cited_year":"2011","cited_title":"Steelmaking AKSteei 13-MELT-E8 E Department/Section Page 2 of 3 Version Level 08/16/2002 Revision Dote *CONFIDENTIAL', Property Of A I( Steel Du Not Duplicate Electronic repair and maintenance will notify furnace operator that the vessel is safe to operate after they determine that the scrubbing water system is controlling","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1235120,"raw_reference":"AKWEP 4.4.3.1 E. 6. In the event of an environmental emergency, the department shall provide corrective and preventative action plans once the incident has been mitigated. Form No. AKQSOPE; Rev. 1; 1/05 [This document is only valid for 24 hours from 3:03 pm, November 8, 2011. Steelmaking At AK Steel Department/Section # 13-MELT-E8 E Page 3 of 3 08/16/2002 Version Level Revision Date *CONFIDENTIAL' Property MAK Steel — Do Not Duplicate Change Log Revision Date 5/19/94 5/15/02","cited_authors":"AKWEP 4.4.3.1 E. 6. In the event of an environmental emergency, the department shall provide corrective and preventative action plans once the incident has been mitigated. Form No. AKQSOPE; Rev. 1; 1/05 [This document is only valid for 24 hours from 3:03 pm, November 8","cited_year":"2011","cited_title":"Steelmaking At AK Steel Department/Section # 13-MELT-E8 E Page 3 of 3 08/16/2002 Version Level Revision Date *CONFIDENTIAL' Property MAK Steel — Do Not Duplicate Change Log Revision Date 5/19/94 5/15/02","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1235121,"raw_reference":"AC AK Steel # 13-EMER-50-E Steelmaking Department/Section Page 2 of 3 Version Level Revision Date o2n3noos *CONFIDENT Wt.* Property Of AK Steel — DNot Duplicate All safety measures administered. Record on the turn report the name of the person contacted at the main gate. Environmental Incident Form #AKMWEIF004 available on WebUDMS must also be completed. Form No. AKQSOPE; Rev. 1; 1/05 This document is onl valid for 24 hours from 3:03 ern November 8 2011. AKSteel Steelmaking Department/Section Page 3 of 3 Version Level Revision Date # 13-EMER-50-E *CON HD FATIAL* Properq 01A 02/13/2008 — Do Not Dui:diem Change Log Revision Date Version Changes 9/19/05 2/13/08","cited_authors":"AC AK Steel # 13-EMER-50-E Steelmaking Department/Section Page 2 of 3 Version Level Revision Date o2n3noos *CONFIDENT Wt.* Property Of AK Steel — DNot Duplicate All safety measures administered. Record on the turn report the name of the person contacted at the main gate. Environmental Incident Form #AKMWEIF004 available on WebUDMS must also be completed. Form No. AKQSOPE; Rev. 1; 1/05 This document is onl valid for 24 hours from 3:03 ern November 8","cited_year":"2011","cited_title":"AKSteel Steelmaking Department/Section Page 3 of 3 Version Level Revision Date # 13-EMER-50-E *CON HD FATIAL* Properq 01A 02/13/2008 — Do Not Dui:diem Change Log Revision Date Version Changes 9/19/05 2/13/08","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1235122,"raw_reference":"RESPONSIBILITIES Department managers are responsible for communicating this information to their personnel and reporting such events to the Main Gate/Security at 3694. Security will then be responsible for contacting Middletown Works Environmental Affairs. Approved by: Works General Manager Environmental Affairs Forrn No. AKWEP; Rev. 0; 1 /01 This document is oni valid for 24 hours from 2:54 pm, November 8, 2011. Origination Date: 04/04/2002","cited_authors":"RESPONSIBILITIES Department managers are responsible for communicating this information to their personnel and reporting such events to the Main Gate/Security at 3694. Security will then be responsible for contacting Middletown Works Environmental Affairs. Approved by: Works General Manager Environmental Affairs Forrn No. AKWEP; Rev. 0; 1 /01 This document is oni valid for 24 hours from 2:54 pm, November 8","cited_year":"2011","cited_title":"Origination Date: 04/04/2002","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1235123,"raw_reference":"LOCATION: Middletown SUBJECT: Environmental Notification For Spills,Upsets & Malfunctions Revision Date: 10/ I 6/2008 Page 2 of 3 Examples of Air Pollution Control Equipment Malfunctions 1. All outages of scrubbers, baghouses, hood collection systerns, etc.","cited_authors":null,"cited_year":null,"cited_title":"LOCATION: Middletown SUBJECT: Environmental Notification For Spills,Upsets & Malfunctions Revision Date: 10/ I 6/2008 Page 2 of 3 Examples of Air Pollution Control Equipment Malfunctions 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1235124,"raw_reference":"MSDS Book Tools for the Job Task Radio, Telephone, 4 Way Gas Meter Records Post-Explosion Checklist Job Procedures An Emergency Response Team shall be defined for each section of the Steelmaking Department. The Department consists of three sections: Melting, Pit / Ladle Met, and Caster. Each Steelmaking section will have an emergency response team on each turn. The emergency response team will consist of: Fomi No. AKQSOPE; Rev. 1; 1/05 IThis document is only valid for 24 hours from 3:04 pm November 8, 2011. Steelmaking Department/Section M AKSteel # 13-ACTPLN E Page 2 of 12 10/12/2011 Version Level Revimion Date *CONFIDENTIAL* Properly Of AK Steel Do Not Duplicate Melting Melter Furnace Operator Vessel Recorder Maint. Shift Manager Pit / Ladle Met Shift Manager Ladle Met Operator(s) Operations Leader Caster Shift Manager Strand Operator Water Attendant Ladleman Withdrawal Torch Oper. Maint. Shift Manager Only Emergency_ Resp nse Tearn rnernbers are authorized to respond to emergency situaticAn_s_ALoth_er erri_pkrnust e to aame_d_a_leasinlass_reque_stegl ju_ariemergeirsigaparlaa teacasnemimr.to..proyide_assistance. The EMERGENCY RESPONSE TEAM must:","cited_authors":"MSDS Book Tools for the Job Task Radio, Telephone, 4 Way Gas Meter Records Post-Explosion Checklist Job Procedures An Emergency Response Team shall be defined for each section of the Steelmaking Department. The Department consists of three sections: Melting, Pit / Ladle Met, and Caster. Each Steelmaking section will have an emergency response team on each turn. The emergency response team will consist of: Fomi No. AKQSOPE; Rev. 1; 1/05 IThis document is only valid for 24 hours from 3:04 pm November 8","cited_year":"2011","cited_title":"Steelmaking Department/Section M AKSteel # 13-ACTPLN E Page 2 of 12 10/12/2011 Version Level Revimion Date *CONFIDENTIAL* Properly Of AK Steel Do Not Duplicate Melting Melter Furnace Operator Vessel Recorder Maint","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}