Memorandum to Nabanita Modak Fischer- Cost and Impacts for Other Solid Waste Incineration Unit Review
Other documents for the same rulemaking
References: 2 extracted, 0 linked to papers
Jones, EPA, November 26, 2012. 3. United States Department of Labor, Bureau of Labor Statistics, June 2018, “Table 2. Civilian workers, by occupational and industry group. Appendix A Cost Calculations – Detailed Result Appendix A-1. Stack Test Cost Algorithms Parameters/Costs Equation A. Parameters 1. Cost index a. 2018 b. 2008 B. Testing Costs, $ 1. Method 5 (PM) 2. Method 9 (opacity) 3. Method 10 (CO) 4. Method 26 (HCl) 5. Method 29 (metals) 6. Method 23 (CDD/CDF) 7. Method 7E (NOX) 8. Method 6C (SO2) Values 603.1 575.4 = $12,000 x (603.1/575.4) = $2,500 x (603.1/575.4) = $7,000 x (603.1/575.4) = $7,000 x (603.1/575.4) = $14,000 x (603.1/575.4) = $26,000 x (603.1/575.4) = $7,000 x (603.1/575.4) $13,000 $3,000 $7,000 $7,000 $15,000 $27,000 $7,000 = $7,000 x (603.1/575.4) $7,000 All Pollutants (VSMWC and IWI Units) $57,333 Term (years) Interest Rate (%) 3.25% 0.08529 (0.0325*(1+0.0325)^15)/((1+0.0325)^15-1) Notes: 1. Initial testing costs to be annualized over 15 years at 3.25% interest. Note that annualized TCI are not included for the OSWI baseline scenario, because it is assumed these costs were already incurred. 2. Testing costs have been rounded to the nearest $1,000 to be consistent with level of rounding in
CISWI costs. 3. Multiple test costs adjusted by 2/3 in nationwide cost estimates to account for travel, accommodations, methods/sampling trains, etc. common to the tests. Sources: 1. Table 6: Stack Testing, Monitoring, and Recordkeeping Costs from Final Reconsideration Compliance Cost Analyses for CISWI Units. Memo from Eastern Resesarch Group to Toni Jones, EPA, November 26, 2012. 2. Bank Prime Loan Rate. May 14, 2020. https://fred.stlouisfed.org/series/DPRIME Table 6C. Stack Testing Costs Appendix A Table 6C. Stack Testing Costs Parameters/Costs Equation A. Parameters 1. Cost index a. 2008 d. 1992 B. Testing Costs, $ 1. Method 5 (PM) 2. Method 9 (opacity) 3. Method 10 (CO) 4. Method 26 (HCl) 5. Method 29 (metals) 6. Method 23 (CDD/CDF) 7. Method 7E (NOX) 8. Method 6C (SO2) Values 575.4 358.2 = $8,000 x (575.4/358.2) = $1,000 x (575.4/358.2) + $1,500 = $4,000 x (575.4/358.2) + $1,000 = $5,000 x (575.4/358.2) = $8,000 x (575.4/358.2) + $2,000 = $21,000 x (575.4/358.2) - $5,000 = $5,000 x (575.4/358.2) = $5,000 x (575.4/358.2) $12,000 $2,500 $7,000 $7,000 $14,000 $26,000 $7,000 $7,000 Annualized: All pollutants: (Energy recovery units, incinerators, small, remote units) $55,000 $6,039 Annual everything except PM, Hg, HCl, and (Waste-burning kilns) opacity $40,667 $4,465