{"document":{"doc_id":144378,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"71 FR 13289","date":"2022-06-16","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0532","source_native_id":"PHMSA-2011-0023-0532","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":1991544,"raw_reference":"PO 00000 Frm 00057 Fmt 4700 Sfmt 4700 E:\\FR\\FM\\15MRR1.SGM 15MRR1 * * * § 192.8 13302 Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Rules and Regulations ■ 4. Add a new § 192.8 to read as follows: § 192.8 How are onshore gathering lines and regulated onshore gathering lines determined? (a) An operator must use API RP 80 (incorporated by reference, see § 192.7), to determine if an onshore pipeline (or part of a connected series of pipelines) is an onshore gathering line. The determination is subject to the limitations listed below. After making this determination, an operator must determine if the onshore gathering line is a regulated onshore gathering line under paragraph (b) of this section. (1) The beginning of gathering, under section 2.2(a)(1) of API RP 80, may not extend beyond the furthermost downstream point in a production operation as defined in section 2.3 of fields may not be more than 50 miles from each other, unless the Administrator finds a longer separation distance is justified in a particular case (see 49 CFR § 190.9). (4) The endpoint of gathering, under section 2.2(a)(1)(D) of API RP 80, may not extend beyond the furthermost","cited_authors":null,"cited_year":null,"cited_title":"PO 00000 Frm 00057 Fmt 4700 Sfmt 4700 E:\\FR\\FM\\15MRR1.SGM 15MRR1 * * * § 192.8 13302 Federal Register / Vol","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}