{"document":{"doc_id":143144,"source":"docket_item","org":"EPA","doc_type":"report","title":"JH Campbell Power Plant Pond A 2021 Annual Groundwater Monitoring and Corrective Action Report","date":"2023-05-18","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2020-0107-0127","source_native_id":"EPA-HQ-OLEM-2020-0107-0127","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2020-0107"],"rins":["RIN 2050-AH39","RIN 2050-AH14","RIN 2050-AH36"],"related":[{"doc_id":128985,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; ANPRM cleared by the Office of Management and Budget on September 18, 2020","date":"2020-10-14"},{"doc_id":128986,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; ANPRM submitted to the Office of Management and Budget on July 23, 2020","date":"2020-10-14"},{"doc_id":77724,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2020-10-14"},{"doc_id":7149,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Proposed Rule CCR Legacy Rule RIA","date":"2023-05-18"},{"doc_id":7164,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 6, 2023","date":"2023-05-18"},{"doc_id":7173,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft RIA cleared by OMB 050423","date":"2023-05-18"},{"doc_id":128181,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; Proposed Rule submitted to the Office of Management and Budget on March 6, 2023","date":"2023-05-18"},{"doc_id":128182,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft Proposed Rule cleared by OMB 050423","date":"2023-05-18"},{"doc_id":143131,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waukegan 2018 Annual GWMCA Report","date":"2023-05-18"},{"doc_id":143133,"source":"docket_item","org":"EPA","doc_type":"report","title":"R. M. Schahfer Generating Station 2018 Annual GWMCA Report- Landfill Phase V and VI","date":"2023-05-18"},{"doc_id":143134,"source":"docket_item","org":"EPA","doc_type":"report","title":"Seminole Generating Station Increment One Landfill 2018 Annual GWMCA Report","date":"2023-05-18"},{"doc_id":143136,"source":"docket_item","org":"EPA","doc_type":"report","title":"JB Sims - 2020 Alternate Source Demonstration Unit 3","date":"2023-05-18"},{"doc_id":143137,"source":"docket_item","org":"EPA","doc_type":"report","title":"New Castle Annual GWMCA Report 2021 Ash Landfill","date":"2023-05-18"},{"doc_id":143138,"source":"docket_item","org":"EPA","doc_type":"report","title":"Huntington CCR Landfill Corrective Measures Assessment","date":"2023-05-18"},{"doc_id":143139,"source":"docket_item","org":"EPA","doc_type":"report","title":"JB Sims 2021 Annual Groundwater Monitoring & Corrective Action Report","date":"2023-05-18"},{"doc_id":143140,"source":"docket_item","org":"EPA","doc_type":"report","title":"EIP (2019) Coal’s Poisonous Legacy: Groundwater Contaminated by Coal Ash Across the U.S.","date":"2023-05-18"},{"doc_id":143141,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waukegan 2019 Annual GWMCA Report","date":"2023-05-18"},{"doc_id":143142,"source":"docket_item","org":"EPA","doc_type":"report","title":"Huntington CCR Landfill Remedy Selection Report","date":"2023-05-18"},{"doc_id":143143,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EPA (2014) Human and Ecological Risk Assessment of Coal Combustion Residuals","date":"2023-05-18"},{"doc_id":143145,"source":"docket_item","org":"EPA","doc_type":"report","title":"JH Campbell Power Plant Ponds 1-2 North and 1-2 South, 2021 Annual GWMCA Report","date":"2023-05-18"},{"doc_id":143146,"source":"docket_item","org":"EPA","doc_type":"report","title":"JB Sims Fourth Quarter 2021 Monitoring Report- Response to comments","date":"2023-05-18"},{"doc_id":143148,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waukegan 2020 Annual GWMCA Report","date":"2023-05-18"},{"doc_id":143149,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waukegan EAP and WAP History of Construction 2016","date":"2023-05-18"},{"doc_id":143150,"source":"docket_item","org":"EPA","doc_type":"report","title":"JH Campbell Semiannual Progress Report - Selection of Remedy, Ponds 1-2 North and 1-2 South, and Pond A","date":"2023-05-18"},{"doc_id":143151,"source":"docket_item","org":"EPA","doc_type":"report","title":"Reid Gardner - Annual GMR 2018 Pond E-1","date":"2023-05-18"},{"doc_id":150272,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EIA (2017)","date":"2023-05-18"},{"doc_id":155087,"source":"docket_item","org":"EPA","doc_type":"other","title":"U.S. EPA (2019)","date":"2023-05-18"},{"doc_id":155088,"source":"docket_item","org":"EPA","doc_type":"other","title":"Waukegan - Boring Well Logs","date":"2023-05-18"},{"doc_id":155089,"source":"docket_item","org":"EPA","doc_type":"other","title":"Proposed Compliance Deadlines for Legacy CCR Surface Impoundments and CCR Management Units","date":"2023-05-18"},{"doc_id":157992,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"JB Sims -EGLE Enforcement Notice March 2022","date":"2023-05-18"},{"doc_id":157993,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket - Copyright Documents for Legacy CCRMU Proposed Rule","date":"2023-05-18"},{"doc_id":157994,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"JB Sims - 2021 Revised Closure Plan Units 1 and 2 and Unit 3","date":"2023-05-18"},{"doc_id":157995,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"JB Sims - 2021 Letter-to-EGLE-ASD-Response","date":"2023-05-18"},{"doc_id":77710,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2023-05-18"},{"doc_id":157988,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket - Webinar Legacy CCRMU Proposed Rule - APPA-NRECA","date":"2023-06-09"},{"doc_id":157989,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket - Webinar Legacy CCRMU Proposed Rule - USWAG-CCIG-Environmental","date":"2023-06-09"},{"doc_id":157990,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket - Webinar Legacy CCRMU Proposed Rule - ASTSWMO-States","date":"2023-06-09"},{"doc_id":157985,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket- Webinar Legacy CCRMU Proposed Rule-USWAG Affiliates","date":"2023-07-07"},{"doc_id":157986,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket- Meeting with Environmental NGOs May 31 2023","date":"2023-07-07"},{"doc_id":155074,"source":"docket_item","org":"EPA","doc_type":"other","title":"062823 Chicago Public Hearing Transcript","date":"2023-07-27"},{"doc_id":155075,"source":"docket_item","org":"EPA","doc_type":"other","title":"062823 Chicago Public Hearing Transcript- Condensed Format","date":"2023-07-27"},{"doc_id":157981,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket- Meeting with Environmental NGOs May 31 2023","date":"2023-07-27"},{"doc_id":157984,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memo to docket- Webinar Legacy CCRMU Proposed Rule-USWAG Affiliates","date":"2023-07-27"},{"doc_id":155035,"source":"docket_item","org":"EPA","doc_type":"other","title":"Transcript for Virtual Hearing for Legacy CCR Proposed Rule 7-12-23","date":"2023-08-08"},{"doc_id":142719,"source":"docket_item","org":"EPA","doc_type":"report","title":"U.S. EPA. 2014d. Radiation Risk Assessment at CERCLA Sites: Q&A. OSWER 9285.6-20. Prepared by the Office of Land and Emergency Response. Washington, DC. June","date":"2023-11-14"},{"doc_id":142720,"source":"docket_item","org":"EPA","doc_type":"report","title":"U.S. EPA. 2014a. Final Human and Ecological Risk Assessment of Coal Combustion Residuals. RIN: 2050-AE81. Prepared by the EPA Office of Solid Waste and Emergency Response. Washington, DC. December","date":"2023-11-14"},{"doc_id":142721,"source":"docket_item","org":"EPA","doc_type":"data","title":"U.S. EIA. 2022a. Most U.S. Coal is Mined in the West, but Most Coal Mining Jobs are in the East. Last updated on 11/08/2022. Available online at: https://www.eia.gov/todayinenergy/detail.php?id=54579","date":"2023-11-14"},{"doc_id":142723,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft Risk Assessment of Coal Combustion Residuals Legacy Impoundments and CCR Management Units. 2023. Prepared By: United States Environmental Protection Agency Office of Land and Emergency Management Office of Resource Conservation and Recovery. October","date":"2023-11-14"},{"doc_id":142724,"source":"docket_item","org":"EPA","doc_type":"report","title":"LANL. 1981. Second Annual Report Radioactive Emissions from Coal Production and Utilization. LA-8825-PR. Prepared by P. Wagner and N.R. Griener. Los Alamos, New Mexico. July","date":"2023-11-14"},{"doc_id":142725,"source":"docket_item","org":"EPA","doc_type":"report","title":"LANL. 1982. Third Annual Report Radioactive Emissions from Coal Production and Utilization: October 1, 1980 – September 30, 1981. LA-9359-PR. Prepared by P. Wagner and N.R. Greiner for the U.S. DOE under Contract No. W-7405-ENG-36. Los Alamos, NM. June","date":"2023-11-14"},{"doc_id":142726,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EPA. 1984. Impacts of Coal Combustion on Trace Elements in the Environment: Wisconsin Power Plant Impact Study. EPA-600/S3-84-070. Office of Research and Development. Duluth, Minnesota. July","date":"2023-11-14"},{"doc_id":142727,"source":"docket_item","org":"EPA","doc_type":"report","title":"TVA. 2010. Kingston Ash Recovery Project Non-Time-Critical Removal Action Embayment/Dredge Cell Engineering Evaluation/Cost Analysis (EE/CA). Prepared by Jacobs","date":"2023-11-14"},{"doc_id":142729,"source":"docket_item","org":"EPA","doc_type":"data","title":"ANL. 2015. Data Collection Handbook to Support Modeling Impacts of Radioactive Material in Soil and Building Structures. ANL/EVS/TM-14/4. Prepared for the U.S. Department of Energy (DOE) under contract DE-AC02-06CH11357. Chicago, IL","date":"2023-11-14"},{"doc_id":142730,"source":"docket_item","org":"EPA","doc_type":"report","title":"INDOT. 1998. Identification and Quantification of Radionuclides in Coal Ash. FHWA/IN/JTRP-98/01. Prepared by J. E. Alleman, F. M. Clikeman, and T. Skronski. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana","date":"2023-11-14"},{"doc_id":142732,"source":"docket_item","org":"EPA","doc_type":"report","title":"U.S. EPA. 2003c. Addendum to the EPACMTP Technical Background Document. Office of Solid Waste, Washington, DC. Available as document ID number EPA-HQ-RCRA-2003-0001-0166 at www.regulations.gov","date":"2023-11-14"},{"doc_id":142733,"source":"docket_item","org":"EPA","doc_type":"data","title":"USGS. 2002. Characterization and Modes of Occurrence of Elements in Feed Coal and Fly Ash - An Integrated Approach. USGS Fact Sheet-038-02. May","date":"2023-11-14"},{"doc_id":142735,"source":"docket_item","org":"EPA","doc_type":"report","title":"LANL. 1980. Radioactive Emissions from Coal Production and Utilization. LA-8618-PR. Prepared by P. Wagner, D.R. Dreesen, E.M. Wewerka, N.R. Greiner. Los Alamos, New Mexico. December","date":"2023-11-14"},{"doc_id":142737,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EPA. 1989. Risk Assessment Guidance for Superfund Volume I Human Health Evaluation Manual (Part A). EPA/540/1-89/002. Prepared by the Office of Emergency and Remedial Response, Washington, DC. December","date":"2023-11-14"},{"doc_id":142738,"source":"docket_item","org":"EPA","doc_type":"report","title":"EPRI. 1995. Laboratory Characterization of Atmospheric Fluidized-Bed Combustion By-Products. TR-105527. Palo Alto, California","date":"2023-11-14"},{"doc_id":142739,"source":"docket_item","org":"EPA","doc_type":"report","title":"U.S. EPA. 1999. Peer Review of EPA’s Hazardous Waste Identification Rule Risk Assessment Model - The Vadose Zone and Saturated Zone Modules Extracted from EPACMTP for HWIR99. Office of Solid Waste. Washington, DC","date":"2023-11-14"}],"references":[{"citation_id":1106977,"raw_reference":"ARCADIS. May 13, 2016. Summary of Monitoring Well Design, Installation, and Development – Pond A. JH Campbell Electric Generation Facility – West Olive, Michigan. Prepared for Consumers Energy Company.","cited_authors":"ARCADIS. May 13","cited_year":"2016","cited_title":"Summary of Monitoring Well Design, Installation, and Development – Pond A. JH Campbell Electric Generation Facility – West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106978,"raw_reference":"ARCADIS. May 18, 2016. Electric Generation Facilities RCRA CCR Detection Monitoring Program. JH Campbell Monitoring Program Sample and Analysis Plan, West Olive, Michigan. Prepared for Consumers Energy Company. Consumers Power Company. September 1996. Hydrogeological Monitoring Plan for","cited_authors":"ARCADIS. May 18","cited_year":"2016","cited_title":"Electric Generation Facilities RCRA CCR Detection Monitoring Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106979,"raw_reference":"TRC. October 2017. Groundwater Statistical Evaluation Plan – JH Campbell Power Plant,","cited_authors":"TRC. October","cited_year":"2017","cited_title":"Groundwater Statistical Evaluation Plan – JH Campbell Power Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106980,"raw_reference":"TRC. January 2018. Annual Groundwater Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan. Prepared for Consumers Energy Company.","cited_authors":"TRC. January","cited_year":"2018","cited_title":"Annual Groundwater Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106981,"raw_reference":"TRC. October 15, 2018. Groundwater Protection Standards, Consumers Energy, JH Campbell","cited_authors":"TRC. October 15","cited_year":"2018","cited_title":"Groundwater Protection Standards, Consumers Energy, JH Campbell","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106982,"raw_reference":"TRC. January 2019. 2018 Annual Groundwater Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan. Prepared for Consumers Energy Company.","cited_authors":"TRC. January","cited_year":"2019","cited_title":"2018 Annual Groundwater Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106983,"raw_reference":"TRC. March 2019; Revised July 2019. Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan. Prepared for Consumers Energy Company.","cited_authors":"TRC. March 2019; Revised July","cited_year":"2019","cited_title":"Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106984,"raw_reference":"TRC. September 2019. Assessment of Corrective Measures, JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units, West Olive, Michigan. Prepared for Consumers Energy Company.","cited_authors":"TRC. September","cited_year":"2019","cited_title":"Assessment of Corrective Measures, JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106985,"raw_reference":"TRC. January 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report and Fourth Quarter 2019 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan. Prepared for Consumers Energy.","cited_authors":"TRC. January","cited_year":"2020","cited_title":"2019 Annual Groundwater Monitoring and Corrective Action Report and Fourth Quarter 2019 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106986,"raw_reference":"TRC. April 2020. First Quarter 2020 Hydrogeological Monitoring Report, JH Campbell Power","cited_authors":"TRC. April","cited_year":"2020","cited_title":"First Quarter 2020 Hydrogeological Monitoring Report, JH Campbell Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106987,"raw_reference":"TRC. October 2020. Third Quarter 2020 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan. Prepared for Consumers Energy.","cited_authors":"TRC. October","cited_year":"2020","cited_title":"Third Quarter 2020 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106988,"raw_reference":"USEPA. 2009. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities, Unified Guidance. Office of Conservation and Recovery. EPA 530/R‐09‐007.","cited_authors":"USEPA","cited_year":"2009","cited_title":"Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities, Unified Guidance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106989,"raw_reference":"USEPA. April 2015. 40 CFR Parts 257 and 261. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. 80 Federal Register 74 (April 17, 2015), pp. 21301-21501 (80 FR 21301).","cited_authors":"USEPA. April","cited_year":"2015","cited_title":"40 CFR Parts 257 and 261","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106990,"raw_reference":"USEPA. July 2018. 40 CFR Part 257. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Amendments to the National Minimum Criteria (Phase One, Part One); Final Rule. 83 Federal Register 146 (July 30, 2018), pp. 36435-36456 (83 FR 36435).","cited_authors":"USEPA. July","cited_year":"2018","cited_title":"40 CFR Part 257","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106991,"raw_reference":"USEPA. April 2018. Barnes Johnson (Office of Resource Conservation and Recovery) to James Roewer (c/o Edison Electric Institute) and Douglas Green, Margaret Fawal (Venable","cited_authors":"USEPA. April","cited_year":"2018","cited_title":"Barnes Johnson (Office of Resource Conservation and Recovery) to James Roewer (c/o Edison Electric Institute) and Douglas Green, Margaret Fawal (Venable","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106992,"raw_reference":"LLP). Re: Coal Combustion Residuals Rule Groundwater Monitoring Requirements. April 30, 2018. United States Environmental Protection Agency, Washington, D.C. 20460. Office of Solid Waste and Emergency Response, now the Office of Land and Emergency Management.","cited_authors":"LLP). Re: Coal Combustion Residuals Rule Groundwater Monitoring Requirements. April 30","cited_year":"2018","cited_title":"United States Environmental Protection Agency, Washington, D.C. 20460","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106993,"raw_reference":"TRC | Consumers Energy X:\\WPAAM\\PJT2\\418422\\0000\\2021Q2\\R418422.0 POND A.DOCX Final July 2021 Table 1 Summary of Groundwater Elevation Data – Second Quarter 2021","cited_authors":null,"cited_year":null,"cited_title":"TRC | Consumers Energy X:\\WPAAM\\PJT2\\418422\\0000\\2021Q2\\R418422.0 POND A.DOCX Final July 2021 Table 1 Summary of Groundwater Elevation Data – Second Quarter 2021","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106994,"raw_reference":"TRC. January 2021. Sample and Analysis Plan, Electric Generation Facilities RCRA CCR Assessment Monitoring Program, JH Campbell Power Plant Pond A, West Olive, Michigan. Prepared for Consumers Energy.","cited_authors":"TRC. January","cited_year":"2021","cited_title":"Sample and Analysis Plan, Electric Generation Facilities RCRA CCR Assessment Monitoring Program, JH Campbell Power Plant Pond A, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106995,"raw_reference":"TRC. April 2021. First Quarter 2021 Hydrogeological Monitoring Report, JH Campbell Power","cited_authors":"TRC. April","cited_year":"2021","cited_title":"First Quarter 2021 Hydrogeological Monitoring Report, JH Campbell Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106996,"raw_reference":"TRC. October 2021. Third Quarter 2021 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan. Prepared for Consumers Energy.","cited_authors":"TRC. October","cited_year":"2021","cited_title":"Third Quarter 2021 Hydrogeological Monitoring Report, JH Campbell Power Plant, Pond A CCR Unit, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106997,"raw_reference":"TRC | Consumers Energy X:\\WPAAM\\PJT2\\418422\\0000\\2021Q4\\R418422.0 POND A.DOCX Final January 2022 Table 1 Summary of Groundwater Elevation Data – Fourth Quarter 2021","cited_authors":null,"cited_year":null,"cited_title":"TRC | Consumers Energy X:\\WPAAM\\PJT2\\418422\\0000\\2021Q4\\R418422.0 POND A.DOCX Final January 2022 Table 1 Summary of Groundwater Elevation Data – Fourth Quarter 2021","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106998,"raw_reference":"Olive, Michigan. Prepared for Consumers Energy Company. Golder Associates. January 2018. JH Campbell Generating Facility Bottom Ash Ponds 1-2 Closure","cited_authors":"Olive, Michigan. Prepared for Consumers Energy Company. Golder Associates. January","cited_year":"2018","cited_title":"JH Campbell Generating Facility Bottom Ash Ponds 1-2 Closure","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1106999,"raw_reference":"TRC Environmental Corporation. January 2022. 2021 Annual Groundwater Monitoring and Corrective Action Report, JH Campbell Power Plant, Pond A CCR Unit. Prepared for Consumers Energy Company.","cited_authors":"TRC Environmental Corporation. January","cited_year":"2022","cited_title":"2021 Annual Groundwater Monitoring and Corrective Action Report, JH Campbell Power Plant, Pond A CCR Unit","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1107000,"raw_reference":"TRC Environmental Corporation. January 2021. Sample Analysis Plan for JH Campbell Bottom Ash Ponds 1-2 and Pond 3. Prepared for Consumers Energy Company.","cited_authors":"TRC Environmental Corporation. January","cited_year":"2021","cited_title":"Sample Analysis Plan for JH Campbell Bottom Ash Ponds 1-2 and Pond 3","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1107001,"raw_reference":"TRC Environmental Corporation. September 2019. Assessment of Corrective Measures, Consumers Energy Company JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units. Prepared for Consumers Energy Company.","cited_authors":"TRC Environmental Corporation. September","cited_year":"2019","cited_title":"Assessment of Corrective Measures, Consumers Energy Company JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1107002,"raw_reference":"TRC Environmental Corporation. March 2019; Revised July 2019. Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan. Prepared for Consumers Energy Company","cited_authors":"TRC Environmental Corporation. March 2019; Revised July","cited_year":"2019","cited_title":"Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}