{"document":{"doc_id":142906,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Baker and Kiefner  Associates Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation TTO Number 5 Apr. 2004","date":"2023-09-15","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0683","source_native_id":"PHMSA-2011-0023-0683","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":1564057,"raw_reference":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564058,"raw_reference":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc. Pressure Testing Formats Introduction","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564059,"raw_reference":"API, Recommended Practice for the Pressure Testing of Liquid Petroleum Pipelines, RP 1110, December 1981.","cited_authors":"API, Recommended Practice for the Pressure Testing of Liquid Petroleum Pipelines, RP 1110, December","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564060,"raw_reference":"Kiefner, John F., Willard A. Maxey “The Benefits and Limitations of Hydrostatic Testing”, 2000. Page 14","cited_authors":"Kiefner, John F., Willard A. Maxey “The Benefits and Limitations of Hydrostatic Testing”","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564061,"raw_reference":"2. Bergman, S. A., “Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?”, Pipeline and Gas Journal, December 1974.","cited_authors":"2. Bergman, S. A., “Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?”, Pipeline and Gas Journal, December","cited_year":"1974","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564062,"raw_reference":"3. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Evaluations of the Susceptibilities of Electric-Welded Pipe to Selective Seam-Weld Corrosion”, Eighth Biennial Joint Technical Meeting on Line Pipe Research, EPRG/NG-18, May 14-17, 1991.","cited_authors":"3. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Evaluations of the Susceptibilities of Electric-Welded Pipe to Selective Seam-Weld Corrosion”, Eighth Biennial Joint Technical Meeting on Line Pipe Research, EPRG/NG-18, May 14-17","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564063,"raw_reference":"4. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp461-481, 1973.","cited_authors":"4. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp461-481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564064,"raw_reference":"5. Kiefner, J. F. and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol. 43, Book Number 100396, 292 pages, 1996.","cited_authors":"5. Kiefner, J. F. and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol. 43, Book Number 100396, 292 pages","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564065,"raw_reference":"6. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—1, Pressure Ratios Key to Effectiveness”, Oil and Gas Journal, pp 54-61, July 31, 2000.","cited_authors":"6. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—1, Pressure Ratios Key to Effectiveness”, Oil and Gas Journal, pp 54-61, July 31","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564066,"raw_reference":"7. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—Conclusion, Model Helps Prevent Failures”, Oil and Gas Journal, pp 54-58. August 7, 2000. Page 35","cited_authors":"7. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—Conclusion, Model Helps Prevent Failures”, Oil and Gas Journal, pp 54-58. August 7","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564067,"raw_reference":"8. Kiefner, J. F., “Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments”, Proceedings of Engineering Technology Conference on Energy, Houston, Texas, February 2002.","cited_authors":"8. Kiefner, J. F., “Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments”, Proceedings of Engineering Technology Conference on Energy, Houston, Texas, February","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564068,"raw_reference":"ILI is an important investigation tool for determining the condition of a pipeline and is a significant part of a pipeline integrity management program recognized by codified provisions that promotes safe, efficient, and cost effective pipeline operation (NACE, 2000). However, all ILI tools are not equally effective for all types of defects. Rather, the selection of the tool, along with its resolution and accuracy requirements, must be targeted to the type of failure mechanism of concern. Code Provisions Relevant to ILI In the proposed rule making for 49 CFR 192, the operator can assess the integrity of a gas pipeline by one of the following methods: 1. Internal inspection (also known as ILI) 2. Pressure testing 3. Direct assessment 4. Any other method that provides an equivalent understanding of the condition of the line pipe 49 CFR 195.452 allows the operator of a liquid pipeline to assess the integrity of the line pipe by the following methods: 1. Internal inspection 2. Pressure testing (in accordance with 49 CFR 195 Subpart E) 3. Any other method that provides an equivalent understanding of the condition of the line pipe of which direct assessment is normally considered an alternative method.","cited_authors":"ILI is an important investigation tool for determining the condition of a pipeline and is a significant part of a pipeline integrity management program recognized by codified provisions that promotes safe, efficient, and cost effective pipeline operation (NACE","cited_year":"2000","cited_title":"However, all ILI tools are not equally effective for all types of defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564069,"raw_reference":"HAZ, and hook cracking (Kiefner, 2002). Hook cracks are manufacturing defects in the longitudinal weld of the pipe, caused by inclusions at the plate edge that are turned out of the plane of the steel during the welding process. It is the turning out of the metal at the weld that gives the characteristic “hook” or “J” shape to the crack (see Figure 5.1). These cracks may pass the manufacturer’s initial hydrostatic test, but fail later due to metal fatigue. Page 38","cited_authors":"HAZ, and hook cracking (Kiefner","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564070,"raw_reference":"MFL was the first method fully developed for pipeline ILI and has been the most widely used. (Bickerstaff, and NACE, 2000). The MFL tool induces an axial magnetic flux into the pipe wall between two poles of a magnet. A uniform homogeneous steel pipe without defects creates a uniform distribution of magnetic flux. Metal loss causes a disturbance in the magnetic flux, which, in a magnetically saturated pipe wall, “leaks” out. Sensors detect this leakage caused by the metal loss. Because the measurement of metal loss is indirect, only limited quantification using complex interpretation techniques is possible. MFL can be used to measure metal loss in both gas and liquid pipelines. Based on the testing needs, varying levels of sensitivity can be used. These levels are:","cited_authors":"MFL was the first method fully developed for pipeline ILI and has been the most widely used. (Bickerstaff, and NACE","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564071,"raw_reference":"2. Brown, William H., Wilson Rivera, “ILI Data Integratrion: Pipeline Integrity Analysis Using Multiple Inspection Technologies”, 2003.","cited_authors":"2. Brown, William H., Wilson Rivera, “ILI Data Integratrion: Pipeline Integrity Analysis Using Multiple Inspection Technologies”","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564072,"raw_reference":"NACE Corrosion 2002. 4. Kiefner, John F., Willard A. Maxey, “Periodic Hydrostatic Testing Or In-Line Inspection To Prevent Failures From Pressure-Cycle-Induced Fatigue”, 2000 Page 51","cited_authors":"NACE Corrosion","cited_year":"2002","cited_title":"Periodic Hydrostatic Testing Or In-Line Inspection To Prevent Failures From Pressure-Cycle-Induced Fatigue","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564073,"raw_reference":"Energy, February 2002. 6. NACE Technical Committee Report, “In-Line Nondestructive Inspection Of Pipelines” Publication 35100, December 2000 Page 52","cited_authors":"Energy, February","cited_year":"2002","cited_title":"In-Line Nondestructive Inspection Of Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564074,"raw_reference":"1. ASTM, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”, A 370, Annual Book of Standards, 2002.","cited_authors":"1. ASTM, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”, A 370, Annual Book of Standards","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564075,"raw_reference":"Standards, 2002. 3. Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering Materials, Third Ed., J. Wiley & Sons, Inc., 1989.","cited_authors":"Standards","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564076,"raw_reference":"ASTM, 1973. 5. Newman, J. C., and Raju, I. S., “An Empirical Stress-Intensity Factor Equation for the Surface Crack”, Eng. Fracture Mechanics, v. 15, Nov. 1981.","cited_authors":"ASTM","cited_year":"1973","cited_title":"An Empirical Stress-Intensity Factor Equation for the Surface Crack","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1564077,"raw_reference":"6. Rolfe, S. T., and Barson, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977. Page 78","cited_authors":"6. Rolfe, S. T., and Barson, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall","cited_year":"1977","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}