{"document":{"doc_id":142842,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Kowalewski Pipeline Integrity Management An Evaluation to Help Improve PHMSAs Oversight of Performance Based Pipeline Safety Programs October 2013","date":"2023-09-21","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0768","source_native_id":"PHMSA-2011-0023-0768","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":1553816,"raw_reference":"MAOP. In this report, the term MAOP is used for both, simply for convenience. From observations by many pipeline inspectors and region directors. Also see Muhlbauer, page 106. See PHMSA/PRCI report: Investigate Fundamentals and Performance Improvements Of Current In-Line Inspection Technologies For Mechanical Damage Detection (Phase 1 report), prepared by Blade Energy Partners, May 2008.","cited_authors":"MAOP. In this report, the term MAOP is used for both, simply for convenience. From observations by many pipeline inspectors and region directors. Also see Muhlbauer, page 106. See PHMSA/PRCI report: Investigate Fundamentals and Performance Improvements Of Current In-Line Inspection Technologies For Mechanical Damage Detection (Phase 1 report), prepared by Blade Energy Partners, May","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553817,"raw_reference":"FAQ 8.18 (liquid pipelines) and FAQ-102 (gas pipelines). Explained in Normal Accidents: Living with High-Risk Technologies, by Charles Perrow. James Reason, in Managing the Risks of Organizational Accidents (pp.85-105). Ibid. (p.51) Ibid. (p.55) (148) Program Evaluation: Pipeline Integrity Management October 31, 2013 Risk modeling and risk assessment 49 CFR 195.452(e)(1). FAQs elaborate on this – for example, in FAQ 1.5 (for liquid pipelines): Recognized industry practices include those found in national consensus standards or reference guides. In FAQ 1.6: Use of an alternative must provide an equivalent (or better) result than using the recognized practice. Pipeline Risk Management Manual: Ideas, Techniques, and Resources (Third Edition), by W.","cited_authors":null,"cited_year":null,"cited_title":"FAQ 8.18 (liquid pipelines) and FAQ-102 (gas pipelines)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553818,"raw_reference":"Kent Muhlbauer (2004) In fact, many standards provide these same general choices as acceptable ways of evaluating risk – including","cited_authors":"Kent Muhlbauer","cited_year":"2004","cited_title":"In fact, many standards provide these same general choices as acceptable ways of evaluating risk – including","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553819,"raw_reference":"ISO/IEC 31010:2009 Risk Management – Risk Assessment Techniques, and Guidance on Risk Assessment for Offshore Installations: Offshore Information Sheet No. 3/2006 (2006) – Health and Safety Executive (UK). Based on interviews with PHMSA inspectors. Also noted in the ANPRM published August 25, 2011 for gas transmission pipelines. See The Failure of Risk Management: Why It’s Broken and How to Fix It (Douglas W. Hubbard, published by John Wiley & Sons, Inc., 2009) for an extensive discussion of these weaknesses in index-scoring models. Oil Pipeline Characteristics and Risk Factors: Illustrations from the Decade of Construction (Kiefner and Trench for American Petroleum Institute, December 2001) Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July 2008) for a discussion of the issues and a comparison of several approaches. Extensively demonstrated in research by Daniel Kahneman and Amos Tversky. The Failure of Risk Management: Why It’s Broken and How to Fix It. See What’s Wrong with Risk Matrices? (Louis Anthony Cox, Jr., Risk Analysis, Vol. 28, No. 2, 2008) The Failure of Risk Management: Why It’s Broken and How to Fix It.","cited_authors":"ISO/IEC 31010:2009 Risk Management – Risk Assessment Techniques, and Guidance on Risk Assessment for Offshore Installations: Offshore Information Sheet No. 3/2006","cited_year":"2006","cited_title":"– Health and Safety Executive (UK)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553820,"raw_reference":"ISO 31000, API 1160, ASME B31.8S, and Pipeline Risk Management Manual, among others. Adapted from The Failure of Risk Management: Why It’s Broken and How to Fix It. Judgment and Uncertainty: Heuristics and Biases, by Amos Tversky and Daniel Kahneman (1982). See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July 2008) for a discussion of the issues and a comparison of several approaches. Ibid.","cited_authors":"ISO 31000, API 1160, ASME B31.8S, and Pipeline Risk Management Manual, among others. Adapted from The Failure of Risk Management: Why It’s Broken and How to Fix It. Judgment and Uncertainty: Heuristics and Biases, by Amos Tversky and Daniel Kahneman","cited_year":"1982","cited_title":"See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July 2008) for a discussion of the issues and a comparison of several approaches","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553821,"raw_reference":"OMB Memorandum M-07-24 – principles for risk assessment. See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July 2008) as a potential starting point. Data quality This process is explored in much more detail in the Data Quality Assessment.","cited_authors":"OMB Memorandum M-07-24 – principles for risk assessment. See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July","cited_year":"2008","cited_title":"as a potential starting point","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553822,"raw_reference":"FAQ-240 Liquid Inspection Protocol 5.02, December 2007. Gas IM Protocols, Revision 5, 1/1/2008 See the PHMSA Data Quality Assessment, 2009. October 31, 2013 The analysis of PIPP provides a good illustration of this – one variable (past accidents) was a relatively good predictor of risk. By combining it in a model with 10-11 weak risk factors, the effect was washing out the most useful (predictive) information the program had about a company’s risk. Metrics See Managing the Risks of Organizational Accidents, page 121. In comments on the proposed rule, NTSB commented that the requirement had to contain unequivocal guidance if operators are to use it to improve their programs, and suggested the agency develop measures. OPS simply responded that it had not revised the guidance. See Chemical Safety Board paper, and the DOT Information Quality Guidelines. See Barriers and Accident Prevention, by Erik Hollnagel, for a good discussion of barrier functions and use, and the role of barriers in accidents. See Managing the Risks of Organizational Accidents, page 126.","cited_authors":"FAQ-240 Liquid Inspection Protocol 5.02, December","cited_year":"2007","cited_title":"Gas IM Protocols, Revision 5, 1/1/2008 See the PHMSA Data Quality Assessment, 2009","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553823,"raw_reference":"Ibid, page 107. For example, to determine the likelihood of certain consequences given a failure, you need all failures. When failure data are screened based on the outcome you are looking for in the first place, it’s impossible to determine the relative risks in the presence or absence of certain conditions. From Managing the Risks of Organizational Accidents (p.119) Ibid. (p. 114) Inspection/oversight This risk model shared many of the same weaknesses as PIPP and RRIM, but is no longer used. Gas IM Protocols meeting Jan 2005, p. 64 See FAQ 11.1","cited_authors":"Ibid, page 107. For example, to determine the likelihood of certain consequences given a failure, you need all failures. When failure data are screened based on the outcome you are looking for in the first place, it’s impossible to determine the relative risks in the presence or absence of certain conditions. From Managing the Risks of Organizational Accidents (p.119) Ibid. (p. 114) Inspection/oversight This risk model shared many of the same weaknesses as PIPP and RRIM, but is no longer used. Gas IM Protocols meeting Jan","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553824,"raw_reference":"FAQ 8.13 From Inspection Program Briefing Sheet. Enforcement The definition of safety culture, from the DOT Safety Council. There is a fairly extensive literature on enforcement and compliance, ranging across the disciplines of economics, law, and organizational psychology. See Making Things Stick: Enforcement and Compliance, by A. G. Heyes, Oxford Review of Economic Policy (1998) Most inspectors I interviewed.","cited_authors":"FAQ 8.13 From Inspection Program Briefing Sheet. Enforcement The definition of safety culture, from the DOT Safety Council. There is a fairly extensive literature on enforcement and compliance, ranging across the disciplines of economics, law, and organizational psychology. See Making Things Stick: Enforcement and Compliance, by A. G. Heyes, Oxford Review of Economic Policy","cited_year":"1998","cited_title":"Most inspectors I interviewed","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553825,"raw_reference":"See, for example, The Theory of Public Enforcement of Law, by A Mitchell Polinsky and Steven Shavell, October 2005. (150) Program Evaluation: Pipeline Integrity Management October 31, 2013 This emphasis has been reflected at least as far back as 2006, and was expressed explicitly in the PHMSA Strategic Plan (2006-2011). Program management See Managing the Risks of Organizational Accidents, by James Reason (p. 181) Managing the Risks of Organizational Accidents – James Reason (1997). Section 12(d) of the National Technology Transfer Act of 1995 (P.L. 104-113, or \"the Act\") codified the policies of Circular A-119. Section 12(d)(1) states that \"Except as provided in paragraph (3) of this subsection, all Federal agencies and departments shall use technical standards that are developed or adopted by voluntary consensus standards bodies, using such technical standards as a means to carry out policy objectives or activities determined by the agencies and departments. See Federal Register December 1, 2000 (hazardous liquid IM rule), page 75382.","cited_authors":"See, for example, The Theory of Public Enforcement of Law, by A Mitchell Polinsky and Steven Shavell, October","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1553826,"raw_reference":"Ibid, p. 75394 – In comments on the proposed rule, Fuel Safe Washington noted that “Appendix C [the risk model illustration] is completely undermined by allowing operators to apply their own weights or values to risk factors.” OPS responded simply that it “continues to believe that the guidance in Appendix C will be helpful to operators …” See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July 2008). Framed by Jim von Hermann in a QMS overview discussion with the Associate Administrator for Pipeline Safety. See Managing the Risks of Organizational Accidents, by James Reason Explained in Normal Accidents: Living with High-Risk Technologies, by Charles Perrow. The DOT Safety Council completed an extensive literature review on safety culture in 2011. NTSB also has advocated for several years that transportation companies should develop safety management systems; SMS was on NTSB’s “Most Wanted” list of safety improvements in 2012. This is a focus of some research being done now by the DOT Safety Council 76 FR 303 (for hazardous liquid pipelines) published October 10, 2010 and 76 FR 5308 (for gas transmission pipelines) published August 25, 2011 (151)","cited_authors":"Ibid, p. 75394 – In comments on the proposed rule, Fuel Safe Washington noted that “Appendix C [the risk model illustration] is completely undermined by allowing operators to apply their own weights or values to risk factors.” OPS responded simply that it “continues to believe that the guidance in Appendix C will be helpful to operators …” See Data-Driven Risk Models Could Help Target Pipeline Safety Inspections – Bureau of Transportation Statistics Special Report SR-010 (Kowalewski and Young, July","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}