{"document":{"doc_id":141910,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 2, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08","url":"https://www.regulations.gov/document/NRC-2020-0101-0143","source_native_id":"NRC-2020-0101-0143","status":"fetched","abstract":null,"action":null},"dockets":["NRC-2020-0101"],"rins":["RIN 3150-AK55"],"related":[{"doc_id":144679,"source":"docket_item","org":"NRC","doc_type":"other","title":"Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-03-08"},{"doc_id":155609,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2020 - Scoping Summary Report for the Advanced Nuclear Reactor Generic EIS","date":"2021-03-09"},{"doc_id":144678,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20  - Scoping Meeting Slides  - Advanced Reactor Generic Environmental Impact Statement","date":"2021-03-15"},{"doc_id":155606,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Scoping Meeting Transcript Advanced Reactor GEIS","date":"2021-03-15"},{"doc_id":155608,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Summary of Scoping Meeting Conducted for Advanced Reactor Generic EIS","date":"2021-03-15"},{"doc_id":3993,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Draft Regulatory Analysis","date":"2021-12-15"},{"doc_id":128628,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"Redline Prelimiary Draft Regulatory Guide DG-4032","date":"2021-12-15"},{"doc_id":144487,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-12-15"},{"doc_id":144488,"source":"docket_item","org":"NRC","doc_type":"other","title":"SECY-21-0098:  Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-12-15"},{"doc_id":155481,"source":"docket_item","org":"NRC","doc_type":"other","title":"Preliminary Draft Interim Staff Guidance COL-ISG-30:  Advanced Reactor Applications - Environmental Considerations for Advanced Nuclear Applications that Reference the GEIS (NUREG- 2249)","date":"2021-12-15"},{"doc_id":155483,"source":"docket_item","org":"NRC","doc_type":"other","title":"Clean Preliminary Draft Regulatory Guide DG-4032","date":"2021-12-15"},{"doc_id":127639,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations,” Redline/Strikeout Version to Support Public Comment","date":"2024-10-03"},{"doc_id":141918,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft Interim Staff Guidance, COL-ISG-030, “Environmental Considerations for New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249)","date":"2024-10-03"},{"doc_id":154695,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Energy and System Design Mitigation Alternatives White Paper Report","date":"2024-10-03"},{"doc_id":154696,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates White Paper","date":"2024-10-03"},{"doc_id":154697,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations”","date":"2024-10-03"},{"doc_id":2616,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-04"},{"doc_id":3986,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"09/2024 - Draft Regulatory Analysis for the 10 CFR Part 51, Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2024-10-04"},{"doc_id":141911,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Supporting Statement for Information Collections Contained in the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2024-10-04"},{"doc_id":141913,"source":"docket_item","org":"NRC","doc_type":"other","title":"Proposed Rule: Congressional Letters for the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-04"},{"doc_id":141914,"source":"docket_item","org":"NRC","doc_type":"other","title":"11/2002 - NUREG-0586, Supplement 1, Vol. 1, [1:2] Cover - Appendix D, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.","date":"2024-10-04"},{"doc_id":141915,"source":"docket_item","org":"NRC","doc_type":"other","title":"11/2002 - NUREG-0586, Supplement 1, Vol. 1, [2:2] Appendix E - End, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.","date":"2024-10-04"},{"doc_id":141916,"source":"docket_item","org":"NRC","doc_type":"other","title":"04/17/24 - Staff Requirements Memorandum (SRM)-SECY-21-0098, “Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101)”","date":"2024-10-04"},{"doc_id":141917,"source":"docket_item","org":"NRC","doc_type":"other","title":"04/17/24 - SRM-SECY-21-0098: Enclosure - Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55;NRC-2020-0101)","date":"2024-10-04"},{"doc_id":141898,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141900,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 3, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08"},{"doc_id":141901,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2014 - NUREG-2157 Vol 1, \"Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report.\"","date":"2024-10-08"},{"doc_id":141902,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2014 -NUREG-2157 Vol 2, \"Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report.\"","date":"2024-10-08"},{"doc_id":141903,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Advanced Reactor Generic Environmental Impact Statement Scoping Meeting List of Attendees","date":"2024-10-08"},{"doc_id":141904,"source":"docket_item","org":"NRC","doc_type":"other","title":"02/28/20 - SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141905,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of November 15 and 20, 2019, Public Meetings to Discuss Exploratory Process for Developing an Advanced Nuclear Reactor Generic Environmental Impact Statement, dated December 10, 2019","date":"2024-10-08"},{"doc_id":141906,"source":"docket_item","org":"NRC","doc_type":"other","title":"Workshop to Discuss the Environmental Information Needed to Develop a Generic Environmental Impact Statement for Advanced Nuclear Reactors, dated December 13, 2019","date":"2024-10-08"},{"doc_id":141907,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 1, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08"},{"doc_id":141908,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/21/20 - SRM-SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141909,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Meeting to Discuss the Scope of the Generic Environmental Impact Statement for Advanced Nuclear Reactors (Meeting Notice)","date":"2024-10-08"},{"doc_id":154693,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of October 1, 2020, Advanced Reactor Stakeholder Public Meeting, dated December 22, 2020","date":"2024-10-08"},{"doc_id":154694,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of April 15, 2021, Advanced Reactor Stakeholder Public Meeting, dated August 24, 2021","date":"2024-10-08"},{"doc_id":2624,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-17"},{"doc_id":160273,"source":"docket_item","org":"NRC","doc_type":"other","title":"NR GEIS Email from E. Schlossberg 10-17-24","date":"2024-10-22"},{"doc_id":2906,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-04-24"},{"doc_id":3996,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Regulatory Analysis-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139341,"source":"docket_item","org":"NRC","doc_type":"other","title":"Federal Register Notice-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139342,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-14-2024 - Public Meeting Transcript RE  Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Page 1-31","date":"2026-05-13"},{"doc_id":139343,"source":"docket_item","org":"NRC","doc_type":"other","title":"SRM-M260413_Enclosure 2 - SECY-25-0085 - Final Rule_Generic Environmental Impact Statement For Licensing Of New Nuclear Reactors (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139344,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-13-24 Public Meeting Transcript RE Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139345,"source":"docket_item","org":"NRC","doc_type":"other","title":"COL-ISG-030 Environmental Considerations Associated with New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249) (Final Rule - GEIS for Licensing New Nuclear Reactors)","date":"2026-05-13"},{"doc_id":139346,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-24-058 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement for Advanced Nuclear Reactors (NUREG 2249)","date":"2026-05-13"},{"doc_id":139347,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-7-2024 - Public Meeting - Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2026-05-13"},{"doc_id":139348,"source":"docket_item","org":"NRC","doc_type":"other","title":"M260413_ Transcript - Affirmation Session - b) SECY-25-0085 -Final Rule_  Generic Environmental Impact","date":"2026-05-13"},{"doc_id":139349,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-13-24 Public Meeting Summary RE_Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139350,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-24-062 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement","date":"2026-05-13"},{"doc_id":139351,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-14-2024 Public Meeting Summary RE_ Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139352,"source":"docket_item","org":"NRC","doc_type":"other","title":"SRM-M260413_ SECY-24-0069 - Affirmation Session Final Rule - b) Generic Environmental Impact","date":"2026-05-13"},{"doc_id":139353,"source":"docket_item","org":"NRC","doc_type":"other","title":"NUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report","date":"2026-05-13"},{"doc_id":153520,"source":"docket_item","org":"NRC","doc_type":"other","title":"Energy and System Design Mitigation Alternatives White Paper","date":"2026-05-13"},{"doc_id":153521,"source":"docket_item","org":"NRC","doc_type":"other","title":"Part 51 Information Collection Supporting Statement for the NRC GEIS Final Rule","date":"2026-05-13"},{"doc_id":153522,"source":"docket_item","org":"NRC","doc_type":"other","title":"10-17-24_ Email from Elena Schlossberg to Stewart Schneider (NR GEIS Proposed Rule)","date":"2026-05-13"},{"doc_id":153523,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-26-026 Letter NR GEIS Final Rule-Agreement States and State Liaison Officers","date":"2026-05-13"},{"doc_id":153524,"source":"docket_item","org":"NRC","doc_type":"other","title":"Regulatory Guide 4.2 Revision 4 Preparation of Environmental Reports for Nuclear Power Stations (Final Rule - GEIS for Licensing New Nuclear Reactors)","date":"2026-05-13"}],"references":[{"citation_id":1037235,"raw_reference":"NUREG-1437, Revision 2 Appendix A 40 CFR Part 93. Code of Federal Regulations, Title 40, Protection of Environment, Part 93, “Determining Conformity of Federal Actions to State or Federal Implementation Plans.” 40 CFR Part 190. Code of Federal Regulations, Title 40, Protection of Environment, Part 190, “Environmental Radiation Protection Standards for Nuclear Power Operations.” 40 CFR Part 1508. Code of Federal Regulations, Title 40, Protection of Environment, Part 1508, “Definitions.” 50 CFR Part 402. Code of Federal Regulations, Title 50, Wildlife and Fisheries, Part 402, “Interagency Cooperation—Endangered Species Act of 1973, as Amended.” 42 FR 26951. May 25, 1977. “Executive Order 11988 of May 24, 1977: Floodplain Management.” Federal Register, Office of the President. 56 FR 64943. December 13, 1991. “Nuclear Power Plant License Renewal.” Federal Register.","cited_authors":"NUREG-1437, Revision 2 Appendix A 40 CFR Part 93. Code of Federal Regulations, Title 40, Protection of Environment, Part 93, “Determining Conformity of Federal Actions to State or Federal Implementation Plans.” 40 CFR Part 190. Code of Federal Regulations, Title 40, Protection of Environment, Part 190, “Environmental Radiation Protection Standards for Nuclear Power Operations.” 40 CFR Part 1508. Code of Federal Regulations, Title 40, Protection of Environment, Part 1508, “Definitions.” 50 CFR Part 402. Code of Federal Regulations, Title 50, Wildlife and Fisheries, Part 402, “Interagency Cooperation—Endangered Species Act of","cited_year":"1973","cited_title":"Executive Order 11988 of May 24, 1977: Floodplain Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037236,"raw_reference":"ANL (Argonne National Laboratory). 2004. Air Oxidation Kinetics for Zr-Based Alloys.","cited_authors":"ANL (Argonne National Laboratory)","cited_year":"2004","cited_title":"Air Oxidation Kinetics for Zr-Based Alloys","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037237,"raw_reference":"ANS (American Nuclear Society). 2020. “U.S. Nuclear Capacity Factors: Resiliency and New Realities.” Nuclear NewsWire, Downers Grove, Illinois. Accessed November 6, 2023 at https://www.ans.org/news/article-183/us-nuclear-capacity-factors-resiliency-and-new-realities/.","cited_authors":"ANS (American Nuclear Society)","cited_year":"2020","cited_title":"U.S. Nuclear Capacity Factors: Resiliency and New Realities","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ans.org/news/article-183/us-nuclear-capacity-factors-resiliency-and-new-realities/","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037238,"raw_reference":"BNL (Brookhaven National Laboratory). 1995. Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1, Summary of Results. NUREG/CR-6144,","cited_authors":"BNL (Brookhaven National Laboratory)","cited_year":"1995","cited_title":"Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1, Summary of Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037239,"raw_reference":"DOE (U.S. Department of Energy). 2010. Cooling Water Issues and Opportunities at U.S. Nuclear Power Plants. INL/EXT-10-20208, Revision 1. Washington, D.C. Accessed September 22, 2023, at https://www.energy.gov/ne/articles/cooling-water-issues-and-opportunities-usnuclear-power-plants-december-2010. Endangered Species Act of 1973, as amended. 16 U.S.C. § 1531 et seq. Energy Reorganization Act of 1974, as amended. 42 U.S.C. § 5801 et seq.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2010","cited_title":"Cooling Water Issues and Opportunities at U.S. Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/ne/articles/cooling-water-issues-and-opportunities-usnuclear-power-plants-december-2010","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037240,"raw_reference":"EPA (U.S. Environmental Protection Agency). 1998. Guidelines for Ecological Risk Assessment. EPA/630/R-95/002F, Washington, D.C. Accessed July 19, 2023 at https://www.epa.gov/sites/default/files/2014-11/documents/eco_risk_assessment1998.pdf.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"1998","cited_title":"Guidelines for Ecological Risk Assessment","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/sites/default/files/2014-11/documents/eco_risk_assessment1998.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037241,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2008. Section 309 Reviewers Guidance for New Nuclear Power Plant Environmental Impact Statements. EPA 315-X-08-001, Washington, D.C. Accessed October 2, 2023, at https://www.epa.gov/sites/default/files/2014-08/documents/309reviewers-guidance-for-new-nuclear-power-plant-eiss-pg.pdf.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2008","cited_title":"Section 309 Reviewers Guidance for New Nuclear Power Plant Environmental Impact Statements","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/sites/default/files/2014-08/documents/309reviewers-guidance-for-new-nuclear-power-plant-eiss-pg.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037242,"raw_reference":"EPRI (Electric Power Research Institute). 2008. Groundwater Protection Guidelines for Nuclear Power Plants. Public Edition, 1016099, Palo Alto, CA. ADAMS Accession No. ML080450056. Exelon (Exelon Generation Company, LLC). 2013. Limerick Generating Station, Units 1 and 2.","cited_authors":"EPRI (Electric Power Research Institute)","cited_year":"2008","cited_title":"Groundwater Protection Guidelines for Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037243,"raw_reference":"FDOH (Florida Department of Health). 2001. Report Concerning Cancer Rates in Southeastern Florida. Bureau of Environmental Epidemiology, Tallahassee, FL. ADAMS Accession No. ML16266A250. Federal Water Pollution Control Act of 1972 (commonly referred to as the Clean Water Act). 33 U.S.C. § 1251 et seq.","cited_authors":"FDOH (Florida Department of Health)","cited_year":"2001","cited_title":"Report Concerning Cancer Rates in Southeastern Florida","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037244,"raw_reference":"Harvey, B. 2013. “Greenhouse Emissions for the Fossil Fuel Sources Identified in Table S3.” Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, D.C. ADAMS Accession No. ML12299A401.","cited_authors":"Harvey, B","cited_year":"2013","cited_title":"Greenhouse Emissions for the Fossil Fuel Sources Identified in Table S3","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037245,"raw_reference":"ICRP (International Commission on Radiological Protection). 1991. “1990 Recommendations of the International Commission on Radiological Protection.” ICRP Publication 60, Ann. ICRP, 21(1-3). Pergamon Press, New York, NY. Accessed April 24, 2023, at https://www.icrp.org/publication.asp?id=icrp%20publication%2060.","cited_authors":"ICRP (International Commission on Radiological Protection)","cited_year":"1991","cited_title":"1990 Recommendations of the International Commission on Radiological Protection","cited_venue":null,"cited_doi":null,"cited_url":"https://www.icrp.org/publication.asp?id=icrp%20publication%2060","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037246,"raw_reference":"IDPH (Illinois Department of Public Health). 2000. Pediatric Cancer Incidence and Proximity to Nuclear Facilities in Illinois. Health and Hazardous Substances Registry Newsletter, Division of Epidemiologic Studies, Springfield, IL. ADAMS Accession No. ML071640128.","cited_authors":"IDPH (Illinois Department of Public Health)","cited_year":"2000","cited_title":"Pediatric Cancer Incidence and Proximity to Nuclear Facilities in Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037247,"raw_reference":"NUREG-1437, Revision 2 A-392 Appendix A INL (Idaho National Laboratory). 2022. Analysis of Loss-of-Offsite-Power Events 2021 Update.","cited_authors":"NUREG-1437, Revision 2 A-392 Appendix A INL (Idaho National Laboratory)","cited_year":"2022","cited_title":"Analysis of Loss-of-Offsite-Power Events 2021 Update","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037248,"raw_reference":"INL/RPT-22-68809, Idaho Falls, ID. Accessed October 10, 2023, at https://inldigitallibrary.inl.gov/sites/sti/sti/Sort_63130.pdf. Low-Level Radioactive Waste Policy Amendments Act of 1985, as amended. Public Law 99-240, 99 Stat. 1842.","cited_authors":"INL/RPT-22-68809, Idaho Falls, ID. Accessed October 10","cited_year":"2023","cited_title":"at https://inldigitallibrary.inl.gov/sites/sti/sti/Sort_63130.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://inldigitallibrary.inl.gov/sites/sti/sti/Sort_63130.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037249,"raw_reference":"Luminant. 2022. Letter from S.K. Sewell, Senior Director, Engineering & Regulatory Affairs, to","cited_authors":"Luminant","cited_year":"2022","cited_title":"Letter from S.K. Sewell, Senior Director, Engineering & Regulatory Affairs, to","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037250,"raw_reference":"NRC Document Control Desk, dated October 3, 2022, regarding “Comanche Peak Nuclear Power Plant, Units 1 and 2, Docket Numbers 50-445 and 50-446, Facility Operating License Numbers NPF-87 and NPF-89, License Renewal Application.” Glen Rose, TX. ADAMS Accession Nos. ML22297A247, ML22276A082, ML22297A246. Magnuson-Stevens Fishery Conservation and Management Act, as amended. 16 U.S.C. § 1801 et seq. National Environmental Policy Act of 1969, as amended. 42 U.S.C. § 4321 et seq. National Historic Preservation Act of 1966, as amended. 54 U.S.C. § 300101 et seq. National Marine Sanctuaries Act, as amended. 16 U.S.C. § 1431 et seq.","cited_authors":"NRC Document Control Desk, dated October 3","cited_year":"2022","cited_title":"Comanche Peak Nuclear Power Plant, Units 1 and 2, Docket Numbers 50-445 and 50-446, Facility Operating License Numbers NPF-87 and NPF-89, License Renewal Application","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037251,"raw_reference":"National Research Council. 1990. Health Effects of Exposure to Low Levels of Ionizing Radiation: BEIR V. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://www.ncbi.nlm.nih.gov/books/NBK218704/.","cited_authors":"National Research Council","cited_year":"1990","cited_title":"Health Effects of Exposure to Low Levels of Ionizing Radiation: BEIR V. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://www.ncbi.nlm.nih.gov/books/NBK218704/","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ncbi.nlm.nih.gov/books/NBK218704/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037252,"raw_reference":"National Research Council. 2006. Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase II. Washington, D.C. Accessed May 13, 2023, at https://doi.org/10.17226/11340.","cited_authors":"National Research Council","cited_year":"2006","cited_title":"Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase II. Washington, D.C. Accessed May 13, 2023, at https://doi.org/10.17226/11340","cited_venue":null,"cited_doi":"10.17226/11340","cited_url":"https://doi.org/10.17226/11340","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037253,"raw_reference":"National Research Council. 2012. Analysis of Cancer Risks in Populations Near Nuclear Facilities: Phase 1. The National Academies Press, Washington, D.C. ADAMS Accession No. ML15035A132.","cited_authors":"National Research Council","cited_year":"2012","cited_title":"Analysis of Cancer Risks in Populations Near Nuclear Facilities: Phase 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037254,"raw_reference":"National Research Council. 2014. Analysis of Cancer Risks in Populations Near Nuclear Facilities: Phase 2 Pilot Planning. The National Academies Press, Washington, D.C. ADAMS Accession No. ML15035A135.","cited_authors":"National Research Council","cited_year":"2014","cited_title":"Analysis of Cancer Risks in Populations Near Nuclear Facilities: Phase 2 Pilot Planning","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037255,"raw_reference":"NEI (Nuclear Energy Institute). 2005. Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document. NEI-05-01, Revision A, Washington, D.C. ADAMS Accession No. ML060530203.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2005","cited_title":"Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037256,"raw_reference":"NEI (Nuclear Energy Institute). 2016. Diverse and Flexible Coping Strategies (FLEX) Implementation Guide. NEI 12-06 [Rev. 4]. Washington, D.C. ADAMS Accession No. ML16354B42.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2016","cited_title":"Diverse and Flexible Coping Strategies (FLEX) Implementation Guide","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037257,"raw_reference":"NEI (Nuclear Energy Institute). 2019a. Industry Groundwater Protection Initiative – Final Guidance Document, Rev. 1. NEI-07-07, Revision 1, Washington, D.C. ADAMS Accession No. ML19142A071. A-393","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2019a","cited_title":"Industry Groundwater Protection Initiative – Final Guidance Document, Rev","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037258,"raw_reference":"NUREG-1437, Revision 2 Appendix A NEI (Nuclear Energy Institute). 2019b. Model SLR New and Significant Assessment Approach for SAMA. NEI 17-04, Revision 1, Washington, D.C. ADAMS Accession No. ML19318D216.","cited_authors":"NUREG-1437, Revision 2 Appendix A NEI (Nuclear Energy Institute)","cited_year":"2019b","cited_title":"Model SLR New and Significant Assessment Approach for SAMA. NEI 17-04, Revision 1, Washington, D.C. ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037259,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1989. Regulatory Analysis for the Resolution of Generic Issue 82, “Beyond Design Basis Accidents in Spent Fuel Pools.” NUREG-1353,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1989","cited_title":"Beyond Design Basis Accidents in Spent Fuel Pools","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037260,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1990. Severe Accident Risks: An Assessment for","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1990","cited_title":"Severe Accident Risks: An Assessment for","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037261,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1993. Shutdown and Low-Power Operation at Commercial Nuclear Power Plants in the United States. NUREG-1449, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1993","cited_title":"Shutdown and Low-Power Operation at Commercial Nuclear Power Plants in the United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037262,"raw_reference":"ADAMS Accession No. ML063470582. NRC (U.S. Nuclear Regulatory Commission). 1996. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Volumes 1 and 2, NUREG-1437, Washington, D.C.","cited_authors":"ADAMS Accession No. ML063470582. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1996","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037263,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997a. Individual Plant Examination Program: Perspectives on Reactor Safety and Planter Performance. Volume 1, Part 1 Final Summary Report and Volume 2, Parts 2-5, Final Report, NUREG-1560, Washington, D.C. Accessed April 24, 2023, at https://www.osti.gov/biblio/569125.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997a","cited_title":"Individual Plant Examination Program: Perspectives on Reactor Safety and Planter Performance","cited_venue":null,"cited_doi":null,"cited_url":"https://www.osti.gov/biblio/569125","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037264,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997b. Memorandum from L.J. Callan to The","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997b","cited_title":"Memorandum from L.J. Callan to The","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037265,"raw_reference":"Commissioners, dated July 30, 1997, regarding “Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation.” SECY-97-168,","cited_authors":"Commissioners, dated July 30","cited_year":"1997","cited_title":"Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037266,"raw_reference":"Washington, D.C. Accessed October 10, 2023, at https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf.","cited_authors":"Washington, D.C. Accessed October 10","cited_year":"2023","cited_title":"at https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037267,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1999. Memorandum from A.C. Thadani, Director, to S.J. Collins, Director, dated November 12, 1999, regarding “Spent Fuel Pool Risk Assessment.” Washington, D.C. ADAMS Accession No. ML010670470.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1999","cited_title":"Spent Fuel Pool Risk Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037268,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2001a. Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. NUREG-1738, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2001a","cited_title":"Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037269,"raw_reference":"ADAMS Accession No. ML010430066. NRC (U.S. Nuclear Regulatory Commission). 2001b. Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles. NRC Bulletin 2001-01, Washington, D.C. ADAMS Accession No. ML012080284.","cited_authors":"ADAMS Accession No. ML010430066. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2001b","cited_title":"Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037270,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2002a. Perspectives Gained from the Individual Plant Examination of External Events (IPEEE), Final Report. NUREG-1742, Vols. 1 and 2.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002a","cited_title":"Perspectives Gained from the Individual Plant Examination of External Events (IPEEE), Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037271,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2002b. In the Matter of All Operating Power Reactor Licensees. Order Modifying Licenses (Effective Immediately). 7590-01-P, EA-02-026.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002b","cited_title":"In the Matter of All Operating Power Reactor Licensees","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037272,"raw_reference":"NUREG-1437, Revision 2 A-394 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2002c. Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. NRC Bulletin 2002-01,","cited_authors":"NUREG-1437, Revision 2 A-394 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002c","cited_title":"Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037273,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2002d. Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1: Regarding the Decommissioning of Nuclear Power Reactors, Main Report - Final Report. NUREG-0586, Supplement 1, Volume 1 and 2, Washington, D.C. ADAMS Accession Nos. ML023470304, ML023470323, ML023500187, ML023500211, ML023500223.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002d","cited_title":"Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1: Regarding the Decommissioning of Nuclear Power Reactors, Main Report - Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037274,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2003. Letter from S.J. Collins, Director, Office of Nuclear Reactor Regulation to Holders of Licenses for Operating Pressurized Water Reactors as listed in Attachment to the Enclosed Order, dated February 11, 2003, regarding “Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.” EA-03-009, Washington, D.C. ADAMS Accession No. ML030380470.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2003","cited_title":"Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037275,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2011. Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. SECY-11-0093, NRC Task Force, Washington, D.C. ADAMS Package Accession No. ML11186A950.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2011","cited_title":"Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037276,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012a. Letter from E. Leeds and M. Johnson to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, regarding “Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.” EA-12-049,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012a","cited_title":"Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037277,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012b. “In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately).” 7590-01-P, EA-12-051, NRC-2012-0067, Washington, D.C. ADAMS Accession No. ML12056A044.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012b","cited_title":"In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037278,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037279,"raw_reference":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission). 2013b. Letter from E. Leeds to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments, dated June 6, 2013, regarding “Issuance of to Order Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.” EA-13-109,","cited_authors":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013b","cited_title":"Issuance of to Order Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037280,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013c. State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis. NUREG/CR-7110, Volume 1, Revision 1, Washington, D.C. ADAMS Accession No. ML13150A053. A-395","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013c","cited_title":"State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037281,"raw_reference":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2013d. State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis. NUREG/CR-7110, Volume 2, Revision 1,","cited_authors":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013d","cited_title":"State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037282,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014a. Memorandum from A.L. Vietti-Cook,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014a","cited_title":"Memorandum from A.L. Vietti-Cook","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037283,"raw_reference":"Secretary, to M.A. Satorius, Executive Director for Operations, dated August 29, 2014, regarding “Staff Requirements – SECY-14-0016, Ongoing Staff Activities to Assess Regulatory Considerations for Power Reactor Subsequent License Renewal.” Washington, D.C. ADAMS Accession No. ML14241A578.","cited_authors":"Secretary, to M.A. Satorius, Executive Director for Operations, dated August 29","cited_year":"2014","cited_title":"Staff Requirements – SECY-14-0016, Ongoing Staff Activities to Assess Regulatory Considerations for Power Reactor Subsequent License Renewal","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037284,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014b. Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014b","cited_title":"Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037285,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014c. Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel. Final Report, NUREG-2157, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014c","cited_title":"Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037286,"raw_reference":"ADAMS Package Accession No. ML14198A440. NRC (U.S. Nuclear Regulatory Commission). 2015. Policy Issue (Information): Analysis of Cancer Risks in Populations Near Nuclear Facilities Study. SECY-15-0104, Washington, D.C.","cited_authors":"ADAMS Package Accession No. ML14198A440. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2015","cited_title":"Policy Issue (Information): Analysis of Cancer Risks in Populations Near Nuclear Facilities Study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037287,"raw_reference":"ADAMS Accession No. ML15141A404. NRC (U.S. Nuclear Regulatory Commission). 2016. “Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Staff Assessment of Information Provided Under Title 10 of the Code of Federal Regulations Part 50, Section 50.54{f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Forder Review of Insights from the Fukushima Dai-ichi Accident (CAC","cited_authors":"ADAMS Accession No. ML15141A404. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2016","cited_title":"“Diablo Canyon Power Plant, Unit Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037288,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017a. “Backgrounder on Biological Effects of Radiation.” Washington, D.C. Accessed September 27, 2023, at https://www.nrc.gov/readingrm/doc-collections/fact-sheets/bio-effects-radiation.html.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017a","cited_title":"Backgrounder on Biological Effects of Radiation","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/readingrm/doc-collections/fact-sheets/bio-effects-radiation.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037289,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017b. Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report: Final Report. NUREG-2191, Volume 1,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017b","cited_title":"Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report: Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037290,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017c. Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking: Final Report.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017c","cited_title":"Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking: Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037291,"raw_reference":"NUREG-1855, Revision 1, Washington, D.C. ADAMS Accession No. ML17062A466.","cited_authors":null,"cited_year":null,"cited_title":"NUREG-1855, Revision 1, Washington, D.C. ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037292,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017d. Policy Issue Notation Vote: Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami. SECY-17-0016, Washington, D.C. ADAMS Accession No. ML16356A045.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017d","cited_title":"Policy Issue Notation Vote: Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037293,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018a. Tribal Protocol Manual. NUREG-2173, Revision 1, Washington, D.C. ADAMS Accession No. ML18214A663.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018a","cited_title":"Tribal Protocol Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037294,"raw_reference":"NUREG-1437, Revision 2 A-396 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2018b. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis. Regulatory Guide 1.174, Revision 3, Washington, D.C. ADAMS Accession No. ML17317A256.","cited_authors":"NUREG-1437, Revision 2 A-396 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018b","cited_title":"An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037295,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report. NUREG-1437, Supplement 5, Second Renewal, Washington, D.C. ADAMS Accession No. ML19290H346.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037296,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019b. “Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic (EPID NO. L-2018-JLD-0006).” Washington, D.C. ML18254A040.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019b","cited_title":"Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic (EPID NO. L-2018-JLD-0006)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037297,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019c. State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019c","cited_title":"State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037298,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020a. Notification of the Intent to Review and Update the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437). STC-20-059, Washington, D.C. ADAMS Accession No. ML20171A399.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020a","cited_title":"Notification of the Intent to Review and Update the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037299,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020b. “Public Scoping Meeting to Discuss the Review and Potential Update of NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Final Report (LR GEIS).” August 27, 2020, Webinar Corrected Transcript, Washington, D.C. ADAMS Package Accession No. ML20296A250.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020b","cited_title":"Public Scoping Meeting to Discuss the Review and Potential Update of NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Final Report (LR GEIS)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037300,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020c. Notification of the Intent to Review and Update the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) (STC-20-059). Washington, D.C. ADAMS Accession No. ML20171A399.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020c","cited_title":"Notification of the Intent to Review and Update the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) (STC-20-059)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037301,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020d. Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities. Regulatory Guide 1.200, Revision 3,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020d","cited_title":"Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037302,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020e. Modeling Potential Reactor Accident","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020e","cited_title":"Modeling Potential Reactor Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037303,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021a. Environmental Impact Statement Scoping Process Summary Report Review and Update of the Generic Environmental Impact Statement For License Renewal of Nuclear Plants. NUREG-1437, Rockville, MD. ADAMS Accession No. ML21039A576. A-397","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021a","cited_title":"Environmental Impact Statement Scoping Process Summary Report Review and Update of the Generic Environmental Impact Statement For License Renewal of Nuclear Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037304,"raw_reference":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2021b. Notification of the Issuance of the Scoping Summary Report for the Review and Update of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) (STC-21-045). Rockville, MD. ADAMS Accession Package No. ML21197A164.","cited_authors":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021b","cited_title":"Notification of the Issuance of the Scoping Summary Report for the Review and Update of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) (STC-21-045)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037305,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021c. Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results. NUREG/KM-0017,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021c","cited_title":"Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037306,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021d. Memorandum from M.M. Doane, Executive Director for Operations, for The Commissioners, dated July 22, 2021, regarding “Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC-2018-0296).” SECY-21-0066, Washington, D.C. ADAMS Accession No. ML20364A008.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021d","cited_title":"Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC-2018-0296)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037307,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021e. “Radiation Protection.” Washington, D.C. Accessed September 27, 2023, at https://www.nrc.gov/about-nrc/radiation.html.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021e","cited_title":"Radiation Protection","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/about-nrc/radiation.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037308,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021f. Policy Issue Notation Vote: Rulemaking Plan For Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC-2018-0296). SECY-21-0066, Washington, D.C. ADAMS Accession No. ML20364A007.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021f","cited_title":"Policy Issue Notation Vote: Rulemaking Plan For Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC-2018-0296)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037309,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021g. Management Directive 3.1, Freedom of Information Act. DT-21-04, Washington, D.C. ADAMS Accession No. ML16110A398.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021g","cited_title":"Management Directive 3.1, Freedom of Information Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037310,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022a. Sources of Information Used in","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022a","cited_title":"Sources of Information Used in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037311,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022b. U.S. NRC Level 3 Probabilistic Risk Assessment (PRA) Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods: Draft Report for Comment. Washington, D.C. ADAMS Accession No. ML22067A210.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022b","cited_title":"U.S. NRC Level 3 Probabilistic Risk Assessment (PRA) Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods: Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037312,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022c. Summary of the Uncertainty Analyses for the State-of-the-Art Reactor Consequence Analyses Project. NUREG/CR-2254, Washington, D.C. October. ADAMS Accession No. ML22193A244.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022c","cited_title":"Summary of the Uncertainty Analyses for the State-of-the-Art Reactor Consequence Analyses Project","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037313,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022d. Memorandum from D.H. Dorman to The","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022d","cited_title":"Memorandum from D.H. Dorman to The","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037314,"raw_reference":"Commissioners, dated March 25, 2022, regarding “Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses—Environmental Review (RIN 3150-AK32; NRC 2018-0296).”","cited_authors":"Commissioners, dated March 25","cited_year":"2022","cited_title":"Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses—Environmental Review (RIN 3150-AK32; NRC 2018-0296)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037315,"raw_reference":"NUREG-1437, Revision 2 A-398 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2022e. Memorandum from B.P. Clark to D.H. Dorman, dated April 5, 2022, regarding “Staff Requirements – SECY-22-0024 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC 2018-0296).” Washington, D.C. ADAMS Accession No. ML22096A035.","cited_authors":"NUREG-1437, Revision 2 A-398 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022e","cited_title":"Staff Requirements – SECY-22-0024 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC 2018-0296)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037316,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022f. Memorandum from A.L. Vietti-Cook to D.H. Dorman, dated February 24, 2022, regarding “Staff Requirements – SECY-21-0066 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150 AK32; NRC 2018 0296).” Washington, D.C. ADAMS Accession No. ML22053A308.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022f","cited_title":"Staff Requirements – SECY-21-0066 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150 AK32; NRC 2018 0296)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037317,"raw_reference":"NRC (Nuclear Regulatory Commission). 2022g. “Memorandum and Order in the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4).” CLI-2202, Rockville, MD. ADAMS Accession No. ML22055A496.","cited_authors":"NRC (Nuclear Regulatory Commission)","cited_year":"2022g","cited_title":"Memorandum and Order in the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037318,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022h. “Memorandum and Order in the Matter of Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3); Exelon Generating","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022h","cited_title":"“Memorandum and Order in the Matter of Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3); Exelon Generating","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037319,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022i. Memorandum from B.P. Clark to D.H. Dorman, dated June 17, 2022, regarding “Staff Requirements – SECY-22-0036 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses—10-Year Environmental Regulatory Update (NRC-2022-0087).” SECY-22-0036, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022i","cited_title":"Staff Requirements – SECY-22-0036 – Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses—10-Year Environmental Regulatory Update (NRC-2022-0087)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037320,"raw_reference":"ADAMS Accession No. ML22168A130. NRC (U.S. Nuclear Regulatory Commission). 2022j. Perspective on Safety Improvements for Commercial Nuclear Power Plants. Washington, D.C. ADAMS Accession No. ML22153A343.","cited_authors":"ADAMS Accession No. ML22168A130. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022j","cited_title":"Perspective on Safety Improvements for Commercial Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037321,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Draft Report for Comment. NUREG-1437, Revision 2,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037322,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023b. Issuance of Proposed Rule and Notice of Availability of the Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-012). Washington, D.C. ADAMS Accession No. ML22231A981.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023b","cited_title":"Issuance of Proposed Rule and Notice of Availability of the Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-012)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037323,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023c. Notification of Public Meetings Regarding the Issuance of Proposed Rule and Notice of Availability of the Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-015). Washington, D.C. ADAMS Accession No. ML23073A271. A-399","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023c","cited_title":"Notification of Public Meetings Regarding the Issuance of Proposed Rule and Notice of Availability of the Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-015)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037324,"raw_reference":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission). 2023d. Notification of Informational Meeting with Federally Recognized Tribes Regarding the Proposed Rule and Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-018). Washington, D.C. ADAMS Accession No. ML23082A123.","cited_authors":"NUREG-1437, Revision 2 Appendix A NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023d","cited_title":"Notification of Informational Meeting with Federally Recognized Tribes Regarding the Proposed Rule and Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-018)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037325,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023e. Notification of Rescheduled Informational Meeting with Federally Recognized Indian Tribes Regarding the Proposed Rule and Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-024). Washington, D.C. ADAMS Accession No. ML23103A132.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023e","cited_title":"Notification of Rescheduled Informational Meeting with Federally Recognized Indian Tribes Regarding the Proposed Rule and Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) (STC-23-024)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037326,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023f. “Radioactive Effluent and Environmental Reports.” Washington, D.C. Accessed September 26, 2023, at https://www.nrc.gov/reactors/operating/ops-experience/tritium/plant-info.html.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023f","cited_title":"Radioactive Effluent and Environmental Reports","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reactors/operating/ops-experience/tritium/plant-info.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037327,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023g. Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Volumes 1 and 2, Draft Report for Comment. NUREG-2191, Revision 1, Washington, D.C. ADAMS Accession Nos. ML23180A182 and ML23180A188.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023g","cited_title":"Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Volumes 1 and 2, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037328,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2024a. Regulatory Guide 4.2 - Supplement 1, Revision 2, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications. Washington, D.C. ADAMS Accession No. ML23201A144.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024a","cited_title":"Regulatory Guide 4.2 - Supplement 1, Revision 2, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037329,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2024b. Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License Renewal. Final Report.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024b","cited_title":"Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License Renewal","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037330,"raw_reference":"NUREG-1555, Revision 2, Washington, D.C. ADAMS Accession No. ML23201A227. Nuclear Waste Policy Act of 1982, as amended. 42 U.S.C. § 10101 et seq.","cited_authors":"NUREG-1555, Revision 2, Washington, D.C. ADAMS Accession No. ML23201A227. Nuclear Waste Policy Act of","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037331,"raw_reference":"Rezaeian, D.E. McNamara, N. Luco, O.S. Boyd, K.S. Rukstales, K.S. Jaiswal, E.M. Thompson, S.M. Hoover, B.S. Clayton, E.H. Field, and Y. Zeng. 2020. “The 2018 update of the US National Seismic Hazard Model: Overview of model and implications.” Earthquake Spectra 36(1):5-41, Los Angeles, CA. Accessed October 10, 2023, at https://journals.sagepub.com/doi/10.1177/8755293019878199.","cited_authors":"Rezaeian, D.E. McNamara, N. Luco, O.S. Boyd, K.S. Rukstales, K.S. Jaiswal, E.M. Thompson, S.M. Hoover, B.S. Clayton, E.H. Field, and Y. Zeng","cited_year":"2020","cited_title":"The 2018 update of the US National Seismic Hazard Model: Overview of model and implications","cited_venue":null,"cited_doi":"10.1177/8755293019878199","cited_url":"https://journals.sagepub.com/doi/10.1177/8755293019878199","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037332,"raw_reference":"PG&E (Pacific Gas & Electric). 2015. Letter from Barry S. Allen, Vice President, Nuclear Services to Document Control Desk, U.S. Nuclear Regulatory Commission, dated July 1, 2015, regarding “Diablo Canyon Units 1 and 2 - Diablo Canyon Power Plant License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results.” Avila","cited_authors":"PG&E (Pacific Gas & Electric)","cited_year":"2015","cited_title":"Diablo Canyon Units 1 and 2 - Diablo Canyon Power Plant License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037333,"raw_reference":"NUREG-1437, Revision 2 A-400 Appendix A PG&E (Pacific Gas and Electric Company). 2018. Letter from J.M. Welsch, Vice President, to","cited_authors":"NUREG-1437, Revision 2 A-400 Appendix A PG&E (Pacific Gas and Electric Company)","cited_year":"2018","cited_title":"Letter from J.M. Welsch, Vice President, to","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037334,"raw_reference":"NRC Document Control Desk, dated April 24, 2018, regarding “Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 and 2 – Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the NearTerm Task Force Review of Insights from the Fukushima Dai-Ichi Accident.” San Francisco, CA.","cited_authors":"NRC Document Control Desk, dated April 24","cited_year":"2018","cited_title":"Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 and 2 – Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the NearTerm Task Force Review of Insights from the Fukushima Dai-Ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037335,"raw_reference":"ADAMS Accession No. ML18120A201. Pollution Prevention Act of 1990. 42 U.S.C. § 13101 et seq. Price-Anderson Act of 1957, as amended. 42 U.S.C. § 2210 et seq.","cited_authors":"ADAMS Accession No. ML18120A201. Pollution Prevention Act of","cited_year":"1990","cited_title":"42 U.S.C. § 13101 et seq","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037336,"raw_reference":"Ramuhalli, P., S.W. Glass, R. Devanathan, K. Knobbs, and R.M. Meyer. 2019. Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal.","cited_authors":"Ramuhalli, P., S.W. Glass, R. Devanathan, K. Knobbs, and R.M. Meyer","cited_year":"2019","cited_title":"Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037337,"raw_reference":"PNNL-27120, Revision 1, Richland, WA. ADAMS Accession No. ML19081A006. Resource Conservation and Recovery Act of 1976 (RCRA). 42 U.S.C. § 6901 et seq.","cited_authors":null,"cited_year":null,"cited_title":"PNNL-27120, Revision 1, Richland, WA. ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037338,"raw_reference":"SNL (Sandia National Laboratories). 1995. Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1, Summary of Results. NUREG/CR-6143, SAND93-2440, Volume 1, Albuquerque, NM. ADAMS Accession No. ML20087K369.","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"1995","cited_title":"Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1, Summary of Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037339,"raw_reference":"SNL (Sandia National Laboratories). 2007. Review of NUREG-0654, Supplement 3, “Criteria for Protective Action Recommendations for Severe Accidents.” Supplement 3. NUREG/CR-6953, Volumes 1 - 3. SAND2007-5448P, Washington, D.C. ADAMS Accession Nos. ML080360602, ML083110406, ML102380087.","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2007","cited_title":"Criteria for Protective Action Recommendations for Severe Accidents","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037340,"raw_reference":"SNL (Sandia National Laboratories). 2013. Characterization of Thermal-Hydraulic and Ignition Phenomena in Prototypic, Full-Length Boiling Water Reactor Spent Fuel Pool Assemblies After a Postulated Complete Loss-of-Coolant Accident. NUREG/CR-7143, SAND-2007-2270.","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2013","cited_title":"Characterization of Thermal-Hydraulic and Ignition Phenomena in Prototypic, Full-Length Boiling Water Reactor Spent Fuel Pool Assemblies After a Postulated Complete Loss-of-Coolant Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037341,"raw_reference":"SNL (Sandia National Laboratories). 2021. MACCS Theory Manual. SAND2021-11535,","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2021","cited_title":"MACCS Theory Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037342,"raw_reference":"Albuquerque, New Mexico. ADAMS Accession No. ML22118B153. State of Florida. 2016. Third District Court of Appeal, Miami-Dade County, et al., vs. In Re: Florida Power & Light Company, etc., et al. Opinion Filed April 20, 2016, Appealing the Final Order on Certification. ADAMS Accession No. ML16126A339.","cited_authors":"Albuquerque, New Mexico. ADAMS Accession No. ML22118B153. State of Florida","cited_year":"2016","cited_title":"Third District Court of Appeal, Miami-Dade County, et al., vs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037343,"raw_reference":"Talbott, E.O., A.O. Youk, K.P. McHugh, J.D. Shire, A. Zhang, B.P. Murphy, and R.A. Engberg. 2000. “Mortality Among the Residents of the Three Mile Island Accident Area: 1979– 1992.” Environmental Health Perspectives 108:545–552, Washington, D.C. Accessed September 29, 2023, at https://www.ncbi.nlm.nih.gov/pmc/articles/PMC1638153/. Uranium Mill Tailings Radiation Control Act of 1978. 42 U.S.C. § 7901 et seq. A-401","cited_authors":"Talbott, E.O., A.O. Youk, K.P. McHugh, J.D. Shire, A. Zhang, B.P. Murphy, and R.A. Engberg","cited_year":"2000","cited_title":"Mortality Among the Residents of the Three Mile Island Accident Area: 1979– 1992","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC1638153/","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037344,"raw_reference":"NUREG-1437, Revision 2 NRC FORM 335 U.S. NUCLEAR REGULATORY COMMISSION (12-2010)","cited_authors":null,"cited_year":null,"cited_title":"NUREG-1437, Revision 2 NRC FORM 335 U.S. NUCLEAR REGULATORY COMMISSION (12-2010)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037345,"raw_reference":"3. DATE REPORT PUBLISHED MONTH YEAR August 2024 Final Report","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037346,"raw_reference":"10.1007/s12011-021-02781-4.","cited_authors":null,"cited_year":null,"cited_title":"10.1007/s12011-021-02781-4","cited_venue":null,"cited_doi":"10.1007/s12011-021-02781-4","cited_url":null,"ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037347,"raw_reference":"(2016) https://www.tandfonline.com/doi/full/10.1080/08929882.2016.1235382","cited_authors":null,"cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":"10.1080/08929882.2016.1235382","cited_url":"https://www.tandfonline.com/doi/full/10.1080/08929882.2016.1235382","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037348,"raw_reference":"November 2021, https://www.frontiersin.org/articles/10.3389/fenrg.2021.750453/full)","cited_authors":"November","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":"10.3389/fenrg.2021.750453/full","cited_url":"https://www.frontiersin.org/articles/10.3389/fenrg.2021.750453/full","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037349,"raw_reference":"Management.\" Land 2022, 11, 2226. https://doi.org/10.3390/land11122226","cited_authors":"Management.\" Land","cited_year":"2022","cited_title":null,"cited_venue":null,"cited_doi":"10.3390/land11122226","cited_url":"https://doi.org/10.3390/land11122226","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1037350,"raw_reference":"showing symptoms of resilience loss (2022) https://iopscience.iop.org/article/10.1088/17489326/ac73a8/pdf.","cited_authors":"showing symptoms of resilience loss","cited_year":"2022","cited_title":null,"cited_venue":null,"cited_doi":"10.1088/17489326/ac73a8/pdf","cited_url":"https://iopscience.iop.org/article/10.1088/17489326/ac73a8/pdf","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}