Clean Air Act Section 112(d)(5) GACT Standard Analysis and CAA Section 112(d)(6) Technology Review for Fenceline Monitoring for Chemical Manufacturing Process Units Associated with the Chemical Manufacturing Area Sources NESHAP
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
References
EPA, 2023. Clean Air Act Section 112(d)(6) Technology Review for Fenceline Monitoring located in the SOCMI Source Category that are Associated with Processes Subject to
HON and for Fenceline Monitoring that are Associated with Processes Subject to Group I Polymers and Resins NESHAP. EPA Docket Item No. EPA-HQ-OAR-2022-0730-0091.
ERG, 2025. List of Facilities Subject to the CMAS NESHAP. January 2025. EPA Docket No.
EPA-HQ-OAR-2024-0303. EPA, 2015. Fenceline Monitoring Impact Estimates for Final Rule. To EPA Docket No. EPAHQ-OAR-2010-0682. EPA Docket Item No. EPA-HQ-OAR-2010-0682-0749.
EPA, 2023. Representative Detection Limit (RDL) for Ethylene Oxide Using a Modified Version of Method TO-15A. February 2023. See Attachment 6, “Representative Detection Limit for Ethylene Oxide” as part of EPA Docket Item No. EPA-HQ-OAR-2022-0730-0091.
EPA, 2025. Risk Assessment for the Chemical Manufacturing Area Source (CMAS) Source Categories in Support of the 2025 Risk and Technology Review for the Proposed Rule. January 2025. EPA Docket No. EPA-HQ-OAR-2024-0303. Technical Memorandum
EPA Docket No. EPA-HQ-OAR-2010-0682 FROM: Brenda Shine, Environmental Engineer Refining and Chemicals Group, SPPD (E143-01)
DATE: June 4, 2015 SUBJECT: Fenceline Monitoring Impact Estimates for Final Rule I. Purpose The objective of this document is to provide updated cost estimates for the implementation of a fenceline monitoring and corrective action program at petroleum refineries.
API (American Petroleum Institute), 2014. ERM Report on API/AFPM Fenceline Monitoring Pilot Study. Attachment B–1 of EPA Docket No. EPA-HQ-OAR-2010-0682-0583.
Shine, B. 2014. Technical Memorandum: Fenceline Monitoring Technical Support Document. From Brenda Shine, SPPD, to EPA Docket Item No. EPA-HQ-OAR-2010-0682-0210. Attachment 1: Passive Monitoring In-House Cost Analysis - Small Model Plant Total Number of Monitoring Stations Technical Hours Management Hours Cost Item Clerical Hours Quantity Cost 3,022 2,590 2,500 40,284 22,680 2,951 3,824 3,824 Capital Costs Purchased Equipment Cost: Meteorological Station System Mounting Arma Data Logger Pressure Sensor and Enclosurea Temperature Sensor and Enclosurea Radiation Shielda Ultrasonic Anemometer Wind Speed/Directiona Towera Thermal Desorption System with AutoSamplerb Gas Chromatography with FIDb Diffusion Tubes with end caps ($683 per pack of 10)b Analytical Cap - AutoSampler ($220 per pack of 20)b