Cost and Impacts of the Final Other Solid Waste Incineration (OSWI) Units Rulemaking
Original sourcePDF at sourceAttachment at sourceAttachment at sourceAttachment at source
Other documents for the same rulemaking
References: 2 extracted, 0 linked to papers
Jones, U.S. Environmental Protection Agency. November 26, 2012. Docket Number: EPAHQ-OAR-2003-0119-2660 Appendix A Cost Calculations – Detailed Result Appendix B Cost Savings For Units Moving From CISWI to OSWI Tab Name Description Facility_Level_Cost_Summary Source_Category_Summary Total_Summary Facility level TCI and Annual costs using the unit template previously provided by
ERG. Total costs summary Total costs summary shown as $106 Stack_Test Inputs used to estimate cost of stack testing Monitoring R&R_CurrentRule_yr1 R&R_CurrentRule_yr2 R&R_NewRule_yr1 R&R_NewRule_yr2 Subcat Inputs Assumptions/Notes Assumes 10% compliance with current rule and applies rudimentary definition to VSMWC and IWI from rule option, assumes SRIs have conducted initial testing (used to determine emission limits). The Stack_Test tab includes the CRF calculations used to estimate annualized TCI for the control Inputs used to estimate cost of monitoring option. Assumes 10% compliance with current rule and applies rudimentary definition to VSMWC and IWI Inputs used to estimate recordkeeping/reporting costs from rule option, assumes SRIs have conducted initial testing. Assumes 10% compliance with current rule and applies rudimentary definition to VSMWC and IWI Inputs including facility and unit counts, percent adjustment, total stack test costs. from rule option. Alternative Baseline Case - 2005 Rule TCI ($) Recordkeeping & Reporting (Assume 10% Comply with Current Rule Distributed Equally; Only