{"document":{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0009","source_native_id":"EPA-HQ-OLEM-2025-2864-0009","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28"},{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":914034,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 1/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 1/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914035,"raw_reference":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 sampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 sampling event Bottom Ash Pond Alternative Source Demonstration Baldwin Power Plant coal combustion residuals Corrective Measures Assessment","cited_authors":null,"cited_year":null,"cited_title":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 sampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 sampling event Bottom Ash Pond Alternative Source Demonstration Baldwin Power Plant coal combustion residuals Corrective Measures Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914036,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 2/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 2/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914037,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 3/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 3/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914038,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 4/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601) B. Provide the date when the Assessment Monitoring Program was initiated for the","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 4/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601) B. Provide the date when the Assessment Monitoring Program was initiated for the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914039,"raw_reference":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the BAP for calendar year 2024.","cited_authors":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the BAP for calendar year","cited_year":"2024","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914040,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 5/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 5/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914041,"raw_reference":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the BAP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95.","cited_authors":null,"cited_year":null,"cited_title":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the BAP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914042,"raw_reference":"FINAL 2024 Part 257AR BAL 601.Docx 6/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR BAL 601.Docx 6/12 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Baldwin Power Plant Bottom Ash Pond (CCR Unit 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914043,"raw_reference":"KEY ACTIONS COMPLETED IN 2024 The groundwater monitoring system, including the CCR unit and all background and compliance monitoring wells, is presented in Figure 1. Background monitoring well MW-306 was abandoned at the BAP due to suspected grout contamination and background monitoring well MW-358 was replaced with MW-358R due to a compromised well casing. Updates to the monitoring system are summarized in Table A below.","cited_authors":null,"cited_year":null,"cited_title":"KEY ACTIONS COMPLETED IN 2024 The groundwater monitoring system, including the CCR unit and all background and compliance monitoring wells, is presented in Figure 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914044,"raw_reference":"Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023a. 40 C.F.R. § 257 Groundwater Monitoring Plan, Bottom Ash Pond, Baldwin Power Plant, Baldwin, Illinois. July 26, 2023. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023b. Multi-Site Sampling and Analysis","cited_authors":"Plan, 40 C.F.R. § 257. December 28","cited_year":"2022","cited_title":"Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914045,"raw_reference":"AECOM. 2016. RE: History of Construction, USEPA Final Rule, 40 C.F.R. § 257.73(c), Baldwin Energy Complex, Baldwin, Illinois. October.","cited_authors":"AECOM","cited_year":"2016","cited_title":"RE: History of Construction, USEPA Final Rule, 40 C.F.R. § 257.73(c), Baldwin Energy Complex, Baldwin, Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914046,"raw_reference":"Buszka, P.M., Fitzpatrick, J., Watson, L.R., and Kay, R.T. 2007. Evaluation of ground-water and boron sources by use of boron stable-isotope ratios, tritium, and selected water-chemistry constituents near Beverly Shores, northwestern Indiana, 2004. U.S. Geological Survey Scientific Investigations Report 2007–5166.","cited_authors":"Buszka, P.M., Fitzpatrick, J., Watson, L.R., and Kay, R.T","cited_year":"2007","cited_title":"Evaluation of ground-water and boron sources by use of boron stable-isotope ratios, tritium, and selected water-chemistry constituents near Beverly Shores, northwestern Indiana, 2004","cited_venue":null,"cited_doi":"10.3133/sir20075166","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95664,"paper_title":"Evaluation of ground-water and boron sources by use of boron stable-isotope ratios, tritium, and selected water-chemistry constituents near Beverly Shores, northwestern Indiana, 2004","paper_year":2007,"paper_doi":"10.3133/sir20075166"},{"citation_id":914047,"raw_reference":"Cable, L. W., F. A. Watkins, Jr., T. M. Robison. 1971. “Hydrogeology of the principal aquifers in Vigo and Clay Counties, Indiana.” Indiana Department of Natural Resources Bulletin 34.","cited_authors":"Cable, L. W., F. A. Watkins, Jr., T. M. Robison","cited_year":"1971","cited_title":"Hydrogeology of the principal aquifers in Vigo and Clay Counties, Indiana","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914048,"raw_reference":"Geosyntec. 2023. Alternative Source Demonstration – Baldwin Power Plant Bottom Ash Pond (Unit ID # 601). 40 CFR § 257.95(g)(3)(ii). Geosyntec Consultants, Inc. October.","cited_authors":"Geosyntec","cited_year":"2023","cited_title":"Alternative Source Demonstration – Baldwin Power Plant Bottom Ash Pond (Unit ID # 601)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914049,"raw_reference":"Gruebel, K A, J A Davies, and J O Leckie. 1988. “The Feasibility of Using Sequential Extraction Techniques for Arsenic and Selenium in Soils and Sediments”. Soil Sci. Soc. Am. J. 52, 390397.","cited_authors":"Gruebel, K A, J A Davies, and J O Leckie","cited_year":"1988","cited_title":"The Feasibility of Using Sequential Extraction Techniques for Arsenic and Selenium in Soils and Sediments","cited_venue":null,"cited_doi":"10.2136/sssaj1988.03615995005200020016x","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95665,"paper_title":"The Feasibility of Using Sequential Extraction Techniques for Arsenic and Selenium in Soils and Sediments","paper_year":1988,"paper_doi":"10.2136/sssaj1988.03615995005200020016x"},{"citation_id":914050,"raw_reference":"Harkness, J S, L S Ruhl, R Millow, W Kloppman, J C Hower, H Hsu-Kim, A Vengosh. 2015. “Lithium isotope fingerprints in coal and coal combustion residuals from the United States.” Procedia Earth and Planetary Science. 13, 134-137.","cited_authors":"Harkness, J S, L S Ruhl, R Millow, W Kloppman, J C Hower, H Hsu-Kim, A Vengosh","cited_year":"2015","cited_title":"Lithium isotope fingerprints in coal and coal combustion residuals from the United States","cited_venue":null,"cited_doi":"10.1016/j.proeps.2015.07.032","cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":95667,"paper_title":"Lithium Isotope Fingerprints in Coal and Coal Combustion Residuals from the United States","paper_year":2015,"paper_doi":"10.1016/j.proeps.2015.07.032"},{"citation_id":914051,"raw_reference":"Hickey, M G and J A Kittrick. 1984. “Chemical Partitioning of Cadmium, Copper, Nickel, and Zinc in Soils and Sediments Containing High Levels of Heavy Metals”. J. Environ. Qual. 13, 372-376.","cited_authors":"Hickey, M G and J A Kittrick","cited_year":"1984","cited_title":"Chemical Partitioning of Cadmium, Copper, Nickel, and Zinc in Soils and Sediments Containing High Levels of Heavy Metals","cited_venue":null,"cited_doi":"10.2134/jeq1984.00472425001300030010x","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95666,"paper_title":"Chemical Partitioning of Cadmium, Copper, Nickel and Zinc in Soils and Sediments Containing High Levels of Heavy Metals","paper_year":1984,"paper_doi":"10.2134/jeq1984.00472425001300030010x"},{"citation_id":914052,"raw_reference":"IEPA. 2016. “Dynegy Midwest Generation, Inc. – Baldwin Energy Complex: Baldwin Fly Ash Pond System Closure – NPDES Permit No. IL000043.” Letter from William Buscher (Illinois Environmental Protection Agency) to Rick Diericx (Dynegy Operating Company). August","cited_authors":"IEPA","cited_year":"2016","cited_title":"Dynegy Midwest Generation, Inc. – Baldwin Energy Complex: Baldwin Fly Ash Pond System Closure – NPDES Permit No. IL000043","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914053,"raw_reference":"Kuo, S, P E Heilman, and A S Baker. 1983. “Distribution and Forms of Copper, Zinc, Cadmium,","cited_authors":"Kuo, S, P E Heilman, and A S Baker","cited_year":"1983","cited_title":"“Distribution and Forms of Copper, Zinc, Cadmium","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914054,"raw_reference":"Lloyd, O. B., and W. L. Lyke. 1995. Ground Water Atlas of the United States – Illinois, Indiana,","cited_authors":"Lloyd, O. B., and W. L. Lyke","cited_year":"1995","cited_title":"Ground Water Atlas of the United States – Illinois, Indiana","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914055,"raw_reference":"Mumford, K.G., MacGregor, J.F., Dickson, S.E. and Frappa, R.H., 2007. “Multivariate analysis of ground water and soil data from a waste disposal site.” Groundwater Monitoring &","cited_authors":"Mumford, K.G., MacGregor, J.F., Dickson, S.E. and Frappa, R.H","cited_year":"2007","cited_title":"Multivariate analysis of ground water and soil data from a waste disposal site","cited_venue":null,"cited_doi":"10.1111/j.1745-6592.2006.00127.x","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95668,"paper_title":"Multivariate Analysis of Ground Water and Soil Data from a Waste Disposal Site","paper_year":2007,"paper_doi":"10.1111/j.1745-6592.2006.00127.x"},{"citation_id":914056,"raw_reference":"Remediation, 27(1), pp.92-102. NRT. 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System, Baldwin, Illinois. Natural Resource Technology, Inc. Prepared for Dynegy Midwest Generation, LLC. June 11.","cited_authors":"Remediation, 27(1), pp.92-102. NRT","cited_year":"2014","cited_title":"Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System, Baldwin, Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914057,"raw_reference":"NRT. 2016. Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan. Baldwin Fly Ash Pond System. Baldwin Energy Complex, Baldwin, IL. Natural Resource","cited_authors":"NRT","cited_year":"2016","cited_title":"Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914058,"raw_reference":"Technology, Inc. BAL BAP ASD_Part 257 F and Li ASD September 2024","cited_authors":null,"cited_year":null,"cited_title":"Technology, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914059,"raw_reference":"Ramboll. 2021. Hydrogeologic Site Characterization Report. Baldwin Bottom Ash Pond. Baldwin Power Plant. Baldwin, Illinois. Ramboll Americas Engineering Solutions, Inc. October.","cited_authors":"Ramboll","cited_year":"2021","cited_title":"Hydrogeologic Site Characterization Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914060,"raw_reference":"Ramboll. 2023. Alternative Source Demonstration. Baldwin Bottom Ash Pond. Baldwin Power Plant. Baldwin, Illinois. Ramboll Americas Engineering Solutions, Inc. April.","cited_authors":"Ramboll","cited_year":"2023","cited_title":"Alternative Source Demonstration","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914061,"raw_reference":"Ronov, A.B., Migdisov, A.A., Voskresenskaya, N.T., and Korzine, G.A. 1970. Geochemistry of lithium in the sedimentary cycle. Geochemistry International. v. 7, p. 75-102.","cited_authors":"Ronov, A.B., Migdisov, A.A., Voskresenskaya, N.T., and Korzine, G.A","cited_year":"1970","cited_title":"Geochemistry of lithium in the sedimentary cycle","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914062,"raw_reference":"Ruhl, L. S., G. S. Dwyer, H. Hsu-Kim, J. C. Hower, and A. Vengosh. 2014. Boron and Strontium Isotopic Characterization of Coal Combustion Residuals: Validation of New Environmental Tracers. Environ. Sci. Technol. 48:14790–14798.","cited_authors":"Ruhl, L. S., G. S. Dwyer, H. Hsu-Kim, J. C. Hower, and A. Vengosh","cited_year":"2014","cited_title":"Boron and Strontium Isotopic Characterization of Coal Combustion Residuals: Validation of New Environmental Tracers","cited_venue":null,"cited_doi":"10.1021/es503746v","cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":95669,"paper_title":"Boron and Strontium Isotopic Characterization of Coal Combustion Residuals: Validation of New Environmental Tracers","paper_year":2014,"paper_doi":"10.1021/es503746v"},{"citation_id":914063,"raw_reference":"Schultz, L.G. 1969. Lithium and potassium absorption, dehydroxylation temperature, and structural water content of aluminous smectites. Clays and Clay Minerals. v. 17, no. 3, p. 115150.","cited_authors":"Schultz, L.G","cited_year":"1969","cited_title":"Lithium and potassium absorption, dehydroxylation temperature, and structural water content of aluminous smectites","cited_venue":null,"cited_doi":"10.1346/ccmn.1969.0170302","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95671,"paper_title":"Lithium and Potassium Absorption, Dehydroxylation Temperature, and Structural Water Content of Aluminous Smectites","paper_year":1969,"paper_doi":"10.1346/ccmn.1969.0170302"},{"citation_id":914064,"raw_reference":"Spivack, A. J., M. R. Palmer, and J. M. Edmond. 1987. “The Sedimentary Cycle of the Boron Isotopes.” Geochem. Cosmochim. Acta. 51(7):1939–1949.","cited_authors":"Spivack, A. J., M. R. Palmer, and J. M. Edmond","cited_year":"1987","cited_title":"The Sedimentary Cycle of the Boron Isotopes","cited_venue":null,"cited_doi":"10.1016/0016-7037(87)90183-9","cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":95670,"paper_title":"The sedimentary cycle of the boron isotopes","paper_year":1987,"paper_doi":"10.1016/0016-7037(87)90183-9"},{"citation_id":914065,"raw_reference":"Sposito, G, C S LeVesque, J P LeClaire, and N Senesi. 1984. “Methodologies to Predict the Mobility and Availability of Hazardous Metals in Sludge-Amended Soils. California Water Resource Center”. University of California, Davis, CA.","cited_authors":"Sposito, G, C S LeVesque, J P LeClaire, and N Senesi","cited_year":"1984","cited_title":"Methodologies to Predict the Mobility and Availability of Hazardous Metals in Sludge-Amended Soils. California Water Resource Center","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914066,"raw_reference":"Starkey, H.C. 1982. The role of clays in fixing lithium. United States Geological Survey. Bulletin 1278-F.","cited_authors":"Starkey, H.C","cited_year":"1982","cited_title":"The role of clays in fixing lithium","cited_venue":null,"cited_doi":"10.3133/b1278f","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95672,"paper_title":"The role of clays in fixing lithium","paper_year":1982,"paper_doi":"10.3133/b1278f"},{"citation_id":914067,"raw_reference":"Tessier A., P.G.C. Campbell, and M. Bisson, 1979. Sequential Extraction Procedures for the Speciation of Particulate Trace Metals. Anal. Chem. 51(7), 844-851.","cited_authors":"Tessier A., P.G.C. Campbell, and M. Bisson","cited_year":"1979","cited_title":"Sequential Extraction Procedures for the Speciation of Particulate Trace Metals","cited_venue":null,"cited_doi":"10.1021/ac50043a017","cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":95661,"paper_title":"Sequential extraction procedure for the speciation of particulate trace metals","paper_year":1979,"paper_doi":"10.1021/ac50043a017"},{"citation_id":914068,"raw_reference":"USEPA. 1993. Solid Waste Disposal Facility Criteria – Technical Manual. EPA 530-R-93-017. United States Environmental Protection Agency. November.","cited_authors":"USEPA","cited_year":"1993","cited_title":"Solid Waste Disposal Facility Criteria – Technical Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914069,"raw_reference":"United States Geological Survey. 2004. Resources on Isotopes. Periodic Table – Boron. Isotopes Tracers Project. United States Geological Survey. Accessed September 13, 2023. https://wwwrcamnl.wr.usgs.gov/isoig/period/b_iig.html.","cited_authors":"United States Geological Survey","cited_year":"2004","cited_title":"Resources on Isotopes","cited_venue":null,"cited_doi":null,"cited_url":"https://wwwrcamnl.wr.usgs.gov/isoig/period/b_iig.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914070,"raw_reference":"Warner, N. R., T. M. Kresse, P. D. Hays, A. Down, J. D. Karr, R. B. Jackson, and A. Vengosh. 2013. Geochemical and Isotopic Variations in Shallow Groundwater in Areas of the Fayetteville Shale Development, North-Central Arkansas. Applied Geochemistry 35:207–220.","cited_authors":"Warner, N. R., T. M. Kresse, P. D. Hays, A. Down, J. D. Karr, R. B. Jackson, and A. Vengosh","cited_year":"2013","cited_title":"Geochemical and Isotopic Variations in Shallow Groundwater in Areas of the Fayetteville Shale Development, North-Central Arkansas","cited_venue":null,"cited_doi":"10.1016/j.apgeochem.2013.04.013","cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":95673,"paper_title":"Geochemical and isotopic variations in shallow groundwater in areas of the Fayetteville Shale development, north-central Arkansas","paper_year":2013,"paper_doi":"10.1016/j.apgeochem.2013.04.013"},{"citation_id":914071,"raw_reference":"Warner, N. R., T.H. Darrah, R.B. Jackson, R. Millot, W. Kloppmann, and A. Vengosh. 2014. New Tracers Identify Hydraulic Fracturing Fluids and Accidental Releases from Oil and Gas Operations. Environmental Science & Technology, 48, 12552 – 12560.","cited_authors":"Warner, N. R., T.H. Darrah, R.B. Jackson, R. Millot, W. Kloppmann, and A. Vengosh","cited_year":"2014","cited_title":"New Tracers Identify Hydraulic Fracturing Fluids and Accidental Releases from Oil and Gas Operations","cited_venue":null,"cited_doi":"10.1021/es5032135","cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":95674,"paper_title":"New Tracers Identify Hydraulic Fracturing Fluids and Accidental Releases from Oil and Gas Operations","paper_year":2014,"paper_doi":"10.1021/es5032135"},{"citation_id":914072,"raw_reference":"Zawidzki, Pawel. 1976. Lithium distribution in micas and its bearing on the lithium geochemistry of granitoids. Polska Akademia Nauk, Archiwum Mineralogiczne. v. 32, p. 95-152.","cited_authors":"Zawidzki, Pawel","cited_year":"1976","cited_title":"Lithium distribution in micas and its bearing on the lithium geochemistry of granitoids","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914073,"raw_reference":"BAL BAP ASD_Part 257 F and Li ASD September 2024","cited_authors":null,"cited_year":null,"cited_title":"BAL BAP ASD_Part 257 F and Li ASD September 2024","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}