{"document":{"doc_id":139700,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Additional technical support","date":"2026-01-13","url":"https://www.regulations.gov/document/PHMSA-2017-0151-0075","source_native_id":"PHMSA-2017-0151-0075","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2017-0151"],"rins":["RIN 2137-AF29"],"related":[{"doc_id":88421,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2018-07-31"},{"doc_id":129008,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"EO 12866 Meeting with CNGC and INGAA - 07272020.pdf.2020.9.28","date":"2020-09-28"},{"doc_id":2753,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"2137-AF29 Class Location PRIA","date":"2020-10-14"},{"doc_id":6602,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2020-10-14"},{"doc_id":128894,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Class Location NPRM OMB Redline 2017-0151","date":"2020-12-23"},{"doc_id":2735,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"RIA gas tariff rate cases","date":"2026-01-13"},{"doc_id":2741,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Class Location Change RIA January 2026","date":"2026-01-13"},{"doc_id":2747,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Additional RIA Support","date":"2026-01-13"},{"doc_id":127396,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive changes in Class Location Change Final Rule Preamble During OIRA Review - EO 12866","date":"2026-01-13"},{"doc_id":139695,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ADBs referenced in the record","date":"2026-01-13"},{"doc_id":139697,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Class location change record - PHMSA annual and incident report data","date":"2026-01-13"},{"doc_id":139698,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Additional EA Support","date":"2026-01-13"},{"doc_id":139699,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Class location change record - Docketing statement for copyright material on file with PHMSA","date":"2026-01-13"},{"doc_id":139701,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"NTSB Reports and Recommendations","date":"2026-01-13"},{"doc_id":139702,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Class Location Change EA 1.12.26 final","date":"2026-01-13"},{"doc_id":139703,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Other relevant prior pipeline safety rules","date":"2026-01-13"},{"doc_id":139704,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Prior Gas IM final rules","date":"2026-01-13"},{"doc_id":2722,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements","date":"2026-01-14"},{"doc_id":2868,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Class Location Change Requirements; Response to Petition for Reconsideration","date":"2026-04-01"},{"doc_id":2967,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Class Location Change Requirements; Correction","date":"2026-05-29"}],"references":[{"citation_id":943383,"raw_reference":"Bickerstaff, Robert, Mark Vaughn, Gerald Stoker, Michael Hassard and Mark Grrett, “Review of Sensor Technology for In-Line Inspection of Natural Gas Pipelines”, Sandia National Laboratories, 2002.","cited_authors":"Bickerstaff, Robert, Mark Vaughn, Gerald Stoker, Michael Hassard and Mark Grrett, “Review of Sensor Technology for In-Line Inspection of Natural Gas Pipelines”, Sandia National Laboratories","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943384,"raw_reference":"Alberta, Canada, September 29-October 3, 2002. Page 23","cited_authors":"Alberta, Canada, September 29-October 3","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943385,"raw_reference":"OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943386,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study May 7, 2004 Dr. Jim Hart","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study May 7, 2004 Dr","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943387,"raw_reference":"Stevick, G. R., Hart, J. D., Flanders, B., “Fatigue Curves for Damage Calculations For a Dented and Ovalled Section of the Trans-Alaska Pipeline System”, 1998 International Pipeline Conference,","cited_authors":null,"cited_year":null,"cited_title":"Fatigue Curves for Damage Calculations For a Dented and Ovalled Section of the Trans-Alaska Pipeline System","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943388,"raw_reference":"Calgary, Alberta Canada. A.2. D1.1-1999 Structural Welding Code - Steel, AWS, 550 NW LeJeune Rd., Miami, FL. A.3.","cited_authors":null,"cited_year":null,"cited_title":"Calgary, Alberta Canada","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943389,"raw_reference":"ASME Boiler and Pressure Vessel Code, Section III and Section VIII, Division 2, 1999. A.4.","cited_authors":"ASME Boiler and Pressure Vessel Code, Section III and Section VIII, Division 2","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943390,"raw_reference":"Markl, A. R. C., “Piping-Flexibility Analysis”, Trans of the ASME, pp. 127-49, 1955. A.5. “Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Section III and Section VIII, Division 2”, ASME, 1969. A.6. \"Relationships Between Stress Intensification Factors And Stress Concentration Factors\", Draft Report Prepared For: Offshore And Onshore Design Application Supervisory Committee PRC International (PRCI) and Gas Research Institute, By SSD, Inc. and Kiefner And Associates, Inc.,","cited_authors":"Markl, A. R. C., “Piping-Flexibility Analysis”, Trans of the ASME, pp. 127-49","cited_year":"1955","cited_title":"Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Section III and Section VIII, Division 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943391,"raw_reference":"December, 2003 A.7. Cooper, W. E., “The Initial Scope and Intent of the Section III Fatigue Design Procedures,” PVRC Workshop on Cyclic Life and Environmental Effects in Nuclear Power Plants, Clearwater Beach,","cited_authors":null,"cited_year":null,"cited_title":"The Initial Scope and Intent of the Section III Fatigue Design Procedures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943392,"raw_reference":"Florida, January 1992. A.8. Jaske, C. E., “White Paper on Weld Fatigue-Strength Reduction and Stress Concentration Factors”, Project R235, PVRC, Columbus, OH, October 7-9, 1996. A.9.","cited_authors":"Florida, January","cited_year":"1992","cited_title":"White Paper on Weld Fatigue-Strength Reduction and Stress Concentration Factors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943393,"raw_reference":"Rahka, K, “Review of Strain Effects on Low-Cycle Fatigue of Notched Components”, PVP-Vol. 263, High Pressure – Codes, Analysis and Applications, ASME 1993. A.10. “Evaluation of Fatigue Tests and Design Criteria on Welded Details”, National Cooperative Highway Research Program Report 286, Project 12-15(5) 1982. A.11. Lindley, T.C., “Near Threshold Fatigue Crack Growth: Experimental Methods, Mechanisms, and Applications”, Elsevier Applied Science Publishers, England, 1984. A.12. American ASME, Piping Code B31.3-2004 Process Piping. A.13. Vieth, Patrick H.; Kiefner, John F., “A Modified Criteria for Evaluating the Remaining Strength of Corroded Pipe.”, PRCI, December 1989. A.14. ASME B31G – 2004 Manual for Determining Remaining Strength of Corroded Pipelines: Supplement to B31 Code-Pressure Piping. Page A-7","cited_authors":"Rahka, K, “Review of Strain Effects on Low-Cycle Fatigue of Notched Components”, PVP-Vol. 263, High Pressure – Codes, Analysis and Applications, ASME","cited_year":"1993","cited_title":"Evaluation of Fatigue Tests and Design Criteria on Welded Details","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943394,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study A.15. API 579 Recommended Practice on Fitness for Service, 2004. Page A-8","cited_authors":"OPS TTO11 – Pipe Wrinkle Study A.15. API 579 Recommended Practice on Fitness for Service","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943395,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-9 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-9 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943396,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-10 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-10 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943397,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-11 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-11 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943398,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-12 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-12 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943399,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-13 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-13 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943400,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-14 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-14 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943401,"raw_reference":"OPS TTO11 – Pipe Wrinkle Study Page A-15 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO11 – Pipe Wrinkle Study Page A-15 OPS TTO11 Final Report 10-22-04.doc 10/25/2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943402,"raw_reference":"ASCE American Lifelines Alliance, www.americanlifelinesalliance.org, July 2001.","cited_authors":"ASCE American Lifelines Alliance, www.americanlifelinesalliance.org, July","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"www.americanlifelinesalliance.org","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943403,"raw_reference":"Liquid Fuel Lifelines, 1984. ASME, “Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2.”","cited_authors":"Liquid Fuel Lifelines","cited_year":"1984","cited_title":"Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943404,"raw_reference":"ASME B31G Committee, “ASME B31G: Determining the Remaining Strength of Corroded Pipelines,” Proposed DRAFT Revision, Submitted to B31 Mechanical Design Committee, September 10, 2003.","cited_authors":"ASME B31G Committee, “ASME B31G: Determining the Remaining Strength of Corroded Pipelines,” Proposed DRAFT Revision, Submitted to B31 Mechanical Design Committee, September 10","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943405,"raw_reference":"ASME PVP publication, “Stress Indices and Stress Intensification Factors of Pressure Vessel and Piping Components,” ASME PVP publication, Volume 50, 1981.","cited_authors":"ASME PVP publication, “Stress Indices and Stress Intensification Factors of Pressure Vessel and Piping Components,” ASME PVP publication, Volume 50","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943406,"raw_reference":"Kiefner, J. F., and P. H. Vieth, “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe,” PRCI, December 22, 1989.","cited_authors":"Kiefner, J. F., and P. H. Vieth, “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe,” PRCI, December 22","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943407,"raw_reference":"Lane, P. H. R., and Rose, R. T., “Comparative Performance of Pressure Vessel Nozzles Under Pulsating PressurE,” Proc. Inst. Mech. Eng., Vol. 175, 1961.","cited_authors":"Lane, P. H. R., and Rose, R. T., “Comparative Performance of Pressure Vessel Nozzles Under Pulsating PressurE,” Proc. Inst. Mech. Eng., Vol. 175","cited_year":"1961","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943408,"raw_reference":"Markl, A. R. C., “Fatigue Tests of Piping Components,” Paper 51-PET-21, Trans. ASME, 17 pages, 1952.","cited_authors":"Markl, A. R. C., “Fatigue Tests of Piping Components,” Paper 51-PET-21, Trans. ASME, 17 pages","cited_year":"1952","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943409,"raw_reference":"Markl, A. R. C., “Piping-Flexibility Analysis,” Paper No. 53-A-51, Trans. ASME, 23 pages, February 1955.","cited_authors":"Markl, A. R. C., “Piping-Flexibility Analysis,” Paper No. 53-A-51, Trans. ASME, 23 pages, February","cited_year":"1955","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943410,"raw_reference":"Miner, M. A., “Cumulative Damage in Fatigue,” Journal of Applied Mechanics, ASME Vol. 12, 1945. National Association of Corrosion Engineers (NACE) Technical Committee Report, “In-Line Nondestructive Inspection of Pipelines,” Publication 35100, December 2000.","cited_authors":"Miner, M. A., “Cumulative Damage in Fatigue,” Journal of Applied Mechanics, ASME Vol. 12","cited_year":"1945","cited_title":"In-Line Nondestructive Inspection of Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943411,"raw_reference":"Olson, R., Clark, T., Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe,” Proceedings of the Ninth Symposium on Line Pipe Research, September 1996.","cited_authors":"Olson, R., Clark, T., Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe,” Proceedings of the Ninth Symposium on Line Pipe Research, September","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943412,"raw_reference":"Rodabaugh, E. C., “A Review of Area Replacement Rules for Pipe Connections in Pressure Vessels and Piping,” WRC Bulletin 335, August 1988.","cited_authors":"Rodabaugh, E. C., “A Review of Area Replacement Rules for Pipe Connections in Pressure Vessels and Piping,” WRC Bulletin 335, August","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943413,"raw_reference":"Alberta, Canada, September 29-October 3, 2002.","cited_authors":"Alberta, Canada, September 29-October 3","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943414,"raw_reference":"SSD, Inc. and Kiefner & Associates, Inc., “Relationships Between Stress Intensification Factors And Stress Concentration Factors,” Draft Report Submitted to PRCI and GRI, December, 2003. “Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2,” ASME. Page B-29","cited_authors":"SSD, Inc. and Kiefner & Associates, Inc., “Relationships Between Stress Intensification Factors And Stress Concentration Factors,” Draft Report Submitted to PRCI and GRI, December","cited_year":"2003","cited_title":"Criteria of the ASME Boiler and Pressure Vessel Code for Design by Analysis in Sections III and VIII, Division 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943415,"raw_reference":"DISCUSSION C. M. SAMES.1 About four years ago the writer had occasion to make a considerable number of calculations on the strength of cylinders, and employed C. Bach's formula given in Des Ingenieurs Taschenbuch \"Huette.\" This formula, adopting Professor Stewart's notation, is identical with Clavarino's, excepting that both numerator and denominator of the fraction under the radical sign are divided by ten. Inspection of a numerical table accompanying Bach's formula revealed the fact that it was possible to write an extremely simple expression that would give practically the same values. This expression is _ 0.42 pDt and it yields results in no case deviating more than 1.4 per cent from those obtained by using Bach's (Clavarino's) formula for a range of f=3p to f= lOOp. This formula was first published in the 1909 edition of an engineering handbook compiled by the writer. Inasmuch as the value (0.3) assumed for Poisson's ratio is at best an approximation, the simplified expression may be used with confidence where the Clavarino formula is called for. The same expression may be used in place of the Birnie formula by 1 Editor, Industrial Engineering, N e w York Copyright © 1912 by ASME Downloaded from http://asmedigitalcollection.asme.org/fluidsengineering/article-pdf/doi/10.1115/1.4059989/7223819/312_1.pdf by guest on 18 August 2025","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.1115/1.4059989/7223819/312_1.pdf","cited_url":"http://asmedigitalcollection.asme.org/fluidsengineering/article-pdf/doi/10.1115/1.4059989/7223819/312_1.pdf","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943416,"raw_reference":"Acton, M. R., et al. 2000. “A Full Scale Experimental Study of Fires Following the Rupture of Natural Gas Transmission Pipelines.” ASME IPC2000, Vol. 1, American Society of Mechanical","cited_authors":"Acton, M. R., et al","cited_year":"2000","cited_title":"A Full Scale Experimental Study of Fires Following the Rupture of Natural Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943417,"raw_reference":"Engineers, New York. Acton, M. R., et al. 2001. “Pipeline Risk Assessment: New Developments for Natural Gas and Hydrocarbon Pipelines.” The Pipeline Pigging, Integrity Assessment, and Repair Conference,","cited_authors":"Engineers, New York. Acton, M. R., et al","cited_year":"2001","cited_title":"Pipeline Risk Assessment: New Developments for Natural Gas and Hydrocarbon Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943418,"raw_reference":"Houston, Texas. American Gas Association (AGA). 2011. “AGA White Paper Automatic Shut-off Valves (ASV) and Remote Control Valves (RCV) on Natural Gas Transmission Pipelines.” American Gas","cited_authors":"Houston, Texas. American Gas Association (AGA)","cited_year":"2011","cited_title":"AGA White Paper Automatic Shut-off Valves (ASV) and Remote Control Valves (RCV) on Natural Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943419,"raw_reference":"Association, Washington, DC. American Institute of Chemical Engineers (AIChE). 1994. Guidelines for Evaluating the Characteristics of Vapor Cloud Explosions, Flash Fires, and BLEVEs. Center for Chemical Process","cited_authors":"Association, Washington, DC. American Institute of Chemical Engineers (AIChE)","cited_year":"1994","cited_title":"Guidelines for Evaluating the Characteristics of Vapor Cloud Explosions, Flash Fires, and BLEVEs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943420,"raw_reference":"Safety, American Institute of Chemical Engineers, New York. American Petroleum Institute (API). 2007. “Pressure-relieving and Depressuring Systems.”","cited_authors":"Safety, American Institute of Chemical Engineers, New York. American Petroleum Institute (API)","cited_year":"2007","cited_title":"Pressure-relieving and Depressuring Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943421,"raw_reference":"ANSI/API Standard 521, Fifth Edition, Washington, DC. American Petroleum Institute (API). 2008. “Specification for Pipeline Valves.” ANSI/API Specification 6D, Twenty-Third Edition, April 2008, Washington, DC. American Society of Mechanical Engineers (ASME). 2010. “Managing System Integrity of Gas Pipelines.” ASME B31.8S-2010, American Society of Mechanical Engineers, New York.","cited_authors":"ANSI/API Standard 521, Fifth Edition, Washington, DC. American Petroleum Institute (API)","cited_year":"2008","cited_title":"Specification for Pipeline Valves","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943422,"raw_reference":"Averill, J. D., et. al. 2010. “Report on Residential Fireground Field Experiments.” Technical Note 1661, National Institute of Standards and Technology, Gaithersburg, Maryland.","cited_authors":"Averill, J. D., et. al","cited_year":"2010","cited_title":"Report on Residential Fireground Field Experiments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943423,"raw_reference":"Borener, S. S. 1994. “Remote Control Spill Reduction Technology: A Survey and Analysis of Applications for Liquid Pipeline Systems.” Volpe National Transportation Systems Center, U.S. Department of Transportation.","cited_authors":"Borener, S. S","cited_year":"1994","cited_title":"Remote Control Spill Reduction Technology: A Survey and Analysis of Applications for Liquid Pipeline Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943424,"raw_reference":"California State Fire Marshal. 1993. “Hazardous Liquid Pipeline Risk Assessment.”","cited_authors":"California State Fire Marshal","cited_year":"1993","cited_title":"Hazardous Liquid Pipeline Risk Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943425,"raw_reference":"Sacramento, California. Cleaver, R. P., et al. 2001. “A Model to Predict the Characteristics of Fires Following the Rupture of Natural Gas Transmission Pipelines.” Trans, IChemE, Vol. 79, Part B, Institute of Chemical Engineers, UK.","cited_authors":"Sacramento, California. Cleaver, R. P., et al","cited_year":"2001","cited_title":"A Model to Predict the Characteristics of Fires Following the Rupture of Natural Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943426,"raw_reference":"Etkin, D. S. 1999. Estimating Cleanup Costs for Oil Spills. Proceedings of the 1999 International Oil Spill Conference.","cited_authors":"Etkin, D. S","cited_year":"1999","cited_title":"Estimating Cleanup Costs for Oil Spills","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943427,"raw_reference":"Etkin, D. S. 2004. Etkin, D.S. 2004. “Modeling Oil Spill Response and Damage Costs.” Proc. 5th Biennial Freshwater Spills Symp.","cited_authors":"Etkin, D. S","cited_year":"2004","cited_title":"Modeling Oil Spill Response and Damage Costs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943428,"raw_reference":"Haklar, J. S. and R. Dresnack. 1999. “Safe Separation Distance from Gas Transmission Pipelines.” Journal of Pipeline Safety, Vol. 1, No. 1, Washington Pipeline Letter, Washington, DC. International Code Council, Inc. (ICC). 2012a. “2012 International Fire Code.” County Club","cited_authors":"Haklar, J. S. and R. Dresnack","cited_year":"1999","cited_title":"Safe Separation Distance from Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943429,"raw_reference":"Hills, Illinois. International Code Council, Inc. (ICC). 2012b. “2012 International Zoning Code.” County Club Hills, Illinois. International Code Council, Inc. (ICC). 2012c. “2012 International Building Code.” County Club Hills, Illinois. Interstate Natural Gas Association of America (INGAA). 2012. “Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety, Regulatory, Certainty, and Job Creation Act of 2011, Docket No. PHMSA-2012-0021.” Washington, DC.","cited_authors":"Hills, Illinois. International Code Council, Inc. (ICC)","cited_year":"2012b","cited_title":"2012 International Zoning Code","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943430,"raw_reference":"Iqbal, N. and Salley, M. H. 2003. “Fire Dynamics Tools (FDT s) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program – Draft Report for Comment.” NUREG-1805, Vol. 1, U.S. Nuclear Regulatory Commission,","cited_authors":"Iqbal, N. and Salley, M. H","cited_year":"2003","cited_title":"Fire Dynamics Tools (FDT s) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program – Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943431,"raw_reference":"Washington, DC. John, J. E. A. 1984. “Gas Dynamics.” Second Edition, Allyn and Bacon, Boston.","cited_authors":"Washington, DC. John, J. E. A","cited_year":"1984","cited_title":"Gas Dynamics","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943432,"raw_reference":"LaChance, J., et. al. 2009. “Development of Uniform Harm Criteria for Use in Quantitative Risk Analysis of the Hydrogen Infrastructure.” Sandia National Laboratory, Albuquerque, New Mexico.","cited_authors":"LaChance, J., et. al","cited_year":"2009","cited_title":"Development of Uniform Harm Criteria for Use in Quantitative Risk Analysis of the Hydrogen Infrastructure","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943433,"raw_reference":"McAllister, S. et. al. 2010. “Critical mass flux for flaming ignition of dead, dry wood as a function of external heat flux and oxidizer flow velocity.” Sixth International Conference on Forest Fire Research, November 15-18, 2010, Coimbra, Portugal.","cited_authors":"McAllister, S. et. al","cited_year":"2010","cited_title":"Critical mass flux for flaming ignition of dead, dry wood as a function of external heat flux and oxidizer flow velocity","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943434,"raw_reference":"Muhlbauer, W. K. 2006. “Enhanced Pipeline Risk Assessment.” WKM Consultancy. National Fire Protection Association (NFPA). 1995. “SFPE Handbook of Fire Protection Engineering.” Second Edition, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2010. “Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments.” NFPA 1710, 2010 Edition, National Fire Protection","cited_authors":"Muhlbauer, W. K","cited_year":"2006","cited_title":"Enhanced Pipeline Risk Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943435,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011a. “Guide for Fire and Explosion Investigations.” NFPA 921, 2011 Edition, National Fire Protection Association, 1 Batterymarch Park,","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2011a","cited_title":"Guide for Fire and Explosion Investigations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943436,"raw_reference":"Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011b. “Recommended Practice for Protection of Buildings from Exterior Fire Exposure.” NFPA 80A, 2012 Edition, National Fire Protection","cited_authors":"Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2011b","cited_title":"Recommended Practice for Protection of Buildings from Exterior Fire Exposure","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943437,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Transportation Safety Board (NTSB). 1995a. “Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire Edison, New Jersey, March 23, 1994.”","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Transportation Safety Board (NTSB)","cited_year":"1995a","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire Edison, New Jersey, March 23, 1994","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943438,"raw_reference":"NTSB/PAR-95/01, PB95-916501. National Transportation Safety Board (NTSB). 1995b. “Safety Recommendations.” P-95-1 through 4. National Transportation Safety Board (NTSB). 2002. “Pipeline Rupture and Subsequent Fire in Bellingham, Washington June 10, 1999.” NTSB/PAR-02/02, PB2002-916501. National Transportation Safety Board (NTSB). 2003. “Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000.” NTSB/PAR-03/01, PB2003-916501. National Transportation Safety Board (NTSB). 2011. “Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010.”","cited_authors":"NTSB/PAR-95/01, PB95-916501. National Transportation Safety Board (NTSB)","cited_year":"1995b","cited_title":"Safety Recommendations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943439,"raw_reference":"NTSB/PAR-11/01, PB2011-916501. Nicholson, M. 2012. “Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010.” National Transportation Safety Board. Pipeline Association for Public Awareness (PAPA). 2011. Pipeline Emergency Response Guidelines. Golden, Colorado.","cited_authors":"NTSB/PAR-11/01, PB2011-916501. Nicholson, M","cited_year":"2012","cited_title":"Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943440,"raw_reference":"Sparks, C. R., et al. 1998. “Final Report Cost Benefit Study of Remote Controlled Main Line Valves.” GRI-98/0076, Gas Research Institute, Chicago.","cited_authors":"Sparks, C. R., et al","cited_year":"1998","cited_title":"Final Report Cost Benefit Study of Remote Controlled Main Line Valves","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943441,"raw_reference":"Stephens, M. J. 2000. “A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines.” GRI-00/0189, Gas Research Institute, Des Plaines, Illinois.","cited_authors":"Stephens, M. J","cited_year":"2000","cited_title":"A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943442,"raw_reference":"Sulfredge, C. D. 2006. “Scoping Study on the Safety Impact of Valve Spacing in Natural Gas Pipelines.” ORNL/TM-2006/579, Oak Ridge National Laboratory, Oak Ridge, Tennessee.","cited_authors":"Sulfredge, C. D","cited_year":"2006","cited_title":"Scoping Study on the Safety Impact of Valve Spacing in Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943443,"raw_reference":"Technica, Ltd. 1988. “Techniques for Assessing Industrial Hazards.” WTP55, The World","cited_authors":"Technica, Ltd","cited_year":"1988","cited_title":"Techniques for Assessing Industrial Hazards","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943444,"raw_reference":"BIBLIOGRAPHY Acton, M. R., et al. 2000. “A Full Scale Experimental Study of Fires Following the Rupture of Natural Gas Transmission Pipelines.” ASME IPC2000, Vol. 1, American Society of Mechanical","cited_authors":"BIBLIOGRAPHY Acton, M. R., et al","cited_year":"2000","cited_title":"A Full Scale Experimental Study of Fires Following the Rupture of Natural Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943445,"raw_reference":"Houston, Texas. Adiga, K. C., et al. 1989. “Modeling Pool-like Gas Flames of Propane.” Fire Safety Journal, 241-250, Vol. 14, Issue 4, Elsevier, Inc., Amsterdam, Netherlands. American Gas Association (AGA). 2011. “AGA White Paper Automatic Shut-off Valves (ASV) and Remote Control Valves (RCV) on Natural Gas Transmission Pipelines.” American Gas","cited_authors":"Houston, Texas. Adiga, K. C., et al","cited_year":"1989","cited_title":"Modeling Pool-like Gas Flames of Propane","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943446,"raw_reference":"ANSI/API Standard 521, Fifth Edition, Washington, DC. American Petroleum Institute (API). 2008. “Specification for Pipeline Valves.” ANSI/API Specification 6D, Twenty-Third Edition, April 2008, Washington, DC. American Society of Mechanical Engineers (ASME). 2010. “Gas Transmission and Distribution Piping Systems.” ASME B31.8-2010, American Society of Mechanical Engineers, New York. American Society of Mechanical Engineers (ASME). 2010. “Managing System Integrity of Gas Pipelines.” ASME B31.8S-2010, American Society of Mechanical Engineers, New York.","cited_authors":"ANSI/API Standard 521, Fifth Edition, Washington, DC. American Petroleum Institute (API)","cited_year":"2008","cited_title":"Specification for Pipeline Valves","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943447,"raw_reference":"Babrauskas, V. 1983. “Estimating Large Pool Fire Burning Rates.” Fire Technology, Vol. 19, National Fire Protection Association.","cited_authors":"Babrauskas, V","cited_year":"1983","cited_title":"Estimating Large Pool Fire Burning Rates","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943448,"raw_reference":"Butler, B. W. and J. D. Cohen. 1996. “An Analytical Evaluation of Fire fighter Safety Zones.” Thirteenth Fire and Forest Meteorology Conference, Lorne, Australia.","cited_authors":"Butler, B. W. and J. D. Cohen","cited_year":"1996","cited_title":"An Analytical Evaluation of Fire fighter Safety Zones","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943449,"raw_reference":"Cowley, L. T. and A. D. Johnson. 1992. “Oil and Gas Fires: Characteristics and Impact.”","cited_authors":"Cowley, L. T. and A. D. Johnson","cited_year":"1992","cited_title":"Oil and Gas Fires: Characteristics and Impact","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943450,"raw_reference":"Eiber, R. J. 2010. “Review of Safety Considerations for Natural Gas Pipeline Block Valve Spacing.” Robert J Eiber Consultant, Inc., Columbus, Ohio.","cited_authors":"Eiber, R. J","cited_year":"2010","cited_title":"Review of Safety Considerations for Natural Gas Pipeline Block Valve Spacing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943451,"raw_reference":"Etkin, D.S. 1999. Estimating Cleanup Costs for Oil Spills. Proceedings of the 1999 International Oil Spill Conference.","cited_authors":"Etkin, D.S","cited_year":"1999","cited_title":"Estimating Cleanup Costs for Oil Spills","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943452,"raw_reference":"Etkin, D.S. 2004. Etkin, D.S. 2004. “Modeling Oil Spill Response and Damage Costs.” Proc. 5th Biennial Freshwater Spills Symp.","cited_authors":"Etkin, D.S","cited_year":"2004","cited_title":"Modeling Oil Spill Response and Damage Costs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943453,"raw_reference":"Folga, S. M. 2007. “Natural Gas Pipeline Technology Overview.” ANL/EVS/TM/08-5, Environmental Science Division, Argonne National Laboratory, Argonne, Illinois.","cited_authors":"Folga, S. M","cited_year":"2007","cited_title":"Natural Gas Pipeline Technology Overview","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943454,"raw_reference":"Greenfield, J. G., et al. 1996. “Pipeline Industry, Pipeline Accident Consequences for Natural Gas and Hazardous Liquids Pipelines, Pipeline Accident Consequences Analysis Using GIS for Natural Gas and Hazardous Liquids Pipelines.” Report No: #DTRS 56-94-C-0006, New Jersey Institute of Technology, prepared for U.S. Department of Transportation.","cited_authors":"Greenfield, J. G., et al","cited_year":"1996","cited_title":"Pipeline Industry, Pipeline Accident Consequences for Natural Gas and Hazardous Liquids Pipelines, Pipeline Accident Consequences Analysis Using GIS for Natural Gas and Hazardous Liquids Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943455,"raw_reference":"Haklar, J. S. and R. Dresnack. 1999. “Safe Separation Distance from Gas Transmission Pipelines.” Journal of Pipeline Safety, Vol. 1, No. 1, Washington Pipeline Letter, Washington, DC.","cited_authors":"Haklar, J. S. and R. Dresnack","cited_year":"1999","cited_title":"Safe Separation Distance from Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943456,"raw_reference":"ICF International. 2009. “Natural Gas Pipeline and Storage Infrastructure Projects Through 2030.” Submitted to: The INGAA Foundation, Inc., Washington, DC. International Code Council, Inc. (ICC). 2012a. “2012 International Fire Code.” County Club","cited_authors":"ICF International","cited_year":"2009","cited_title":"Natural Gas Pipeline and Storage Infrastructure Projects Through 2030","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943457,"raw_reference":"Hills, Illinois. International Code Council, Inc. (ICC). 2012b. “2012 International Building Code.” County Club Hills, Illinois. International Code Council, Inc. (ICC). 2012c. “2012 International Zoning Code.” County Club Hills, Illinois. Interstate Natural Gas Association of America (INGAA). 2005. “White Paper on Equivalent Safety for Alternative Valve Spacing. INGAA Pipeline Safety Committee, Washington, DC. Interstate Natural Gas Association of America (INGAA). 2012. “Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety, Regulatory, Certainty, and Job Creation Act of 2011, Docket No. PHMSA-2012-0021.” Washington, DC.","cited_authors":"Hills, Illinois. International Code Council, Inc. (ICC)","cited_year":"2012b","cited_title":"2012 International Building Code","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943458,"raw_reference":"Konersmann, R., et al. 2009. “On the Risk of Transporting Liquid and Gaseous Fuels in Pipelines.” Research Report 289, BAM Federal Institute for Materials Research and Testing, Berlin.","cited_authors":"Konersmann, R., et al","cited_year":"2009","cited_title":"On the Risk of Transporting Liquid and Gaseous Fuels in Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943459,"raw_reference":"Kuhr, C., et al. 2003. “Modelling of the Thermal Radiation of Pool Fires.” Progress in Computational Fluid Dynamics, Vol. 3, Nos. 2-4, Inderscience Enterprises Limited, Switzerland.","cited_authors":"Kuhr, C., et al","cited_year":"2003","cited_title":"Modelling of the Thermal Radiation of Pool Fires","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943460,"raw_reference":"Mares, M. G., et al. 2009. “Radiant Heat from Propane Jet Fires.” Experimental Thermal and Fluid Science, Elsevier, Inc., Amsterdam, Netherlands.","cited_authors":"Mares, M. G., et al","cited_year":"2009","cited_title":"Radiant Heat from Propane Jet Fires","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943461,"raw_reference":"McGrattan, K. B., et al. 2000. “Thermal Radiation from Large Pool Fires.” NISTIR 6546, National Institute of Standards and Technology, Gaithersburg, Maryland.","cited_authors":"McGrattan, K. B., et al","cited_year":"2000","cited_title":"Thermal Radiation from Large Pool Fires","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943462,"raw_reference":"Mell, W. E. and J. R. Lawson. 1999. “A Heat Transfer Model for Fire Fighter’s Protective Clothing.” NISTIR 6299, National Institute of Standards and Technology, Gaithersburg, Maryland.","cited_authors":"Mell, W. E. and J. R. Lawson","cited_year":"1999","cited_title":"A Heat Transfer Model for Fire Fighter’s Protective Clothing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943463,"raw_reference":"Muhlbauer, W. K. 2006. “Enhanced Pipeline Risk Assessment.” WKM Consultancy.","cited_authors":"Muhlbauer, W. K","cited_year":"2006","cited_title":"Enhanced Pipeline Risk Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943464,"raw_reference":"Nicholson, M. 2012. “Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010.” National Transportation Safety Board. National Fire Protection Association (NFPA). 1995. “SFPE Handbook of Fire Protection Engineering.” Second Edition, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2008. “Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments.” NFPA 1710, 2010 Edition, National Fire Protection","cited_authors":"Nicholson, M","cited_year":"2012","cited_title":"Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943465,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2008. “Standard on Selection, Care, and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting.”","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2008","cited_title":"Standard on Selection, Care, and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943466,"raw_reference":"NFPA 1851, 2008 Edition, National Fire Protection Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2010. “Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments.” NFPA 1710, 2010 Edition, National Fire Protection","cited_authors":"NFPA","cited_year":"1851","cited_title":"Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943467,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Guide for Fire and Explosion Investigations.” NFPA 921, 2011 Edition, National Fire Protection Association, 1 Batterymarch Park,","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2011","cited_title":"Guide for Fire and Explosion Investigations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943468,"raw_reference":"Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Recommended Practice for Protection of Buildings from Exterior Fire Exposure.” NFPA 80A, 2012 Edition, National Fire Protection","cited_authors":"Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2011","cited_title":"Recommended Practice for Protection of Buildings from Exterior Fire Exposure","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943469,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Standard on Protective Clothing and Equipment for Wildlife Fire Fighting.” NFPA 1977, 2011 Edition, National Fire Protection","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2011","cited_title":"Standard on Protective Clothing and Equipment for Wildlife Fire Fighting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943470,"raw_reference":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2012. “Standard Test Method for Determining Ignitibility of Exterior Wall Assemblies Using a Radiant Heat Energy Source.” NFPA 268, 2012","cited_authors":"Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA)","cited_year":"2012","cited_title":"Standard Test Method for Determining Ignitibility of Exterior Wall Assemblies Using a Radiant Heat Energy Source","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943471,"raw_reference":"Edition, National Fire Protection Association, 1 Batterymarch Park, Quincy, Massachusetts. National Institute of Standards and Technology. 2010. “Report on Residential Fireground Field Experiments.” Technical Note 1661. National Transportation Safety Board (NTSB). 1970. “Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown.” PSS-71-1. National Transportation Safety Board (NTSB). 1995. “Safety Recommendations.” P-95-1 through 4. National Transportation Safety Board (NTSB). 1995. “Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire Edison, New Jersey, March 23, 1994.”","cited_authors":"Edition, National Fire Protection Association, 1 Batterymarch Park, Quincy, Massachusetts. National Institute of Standards and Technology","cited_year":"2010","cited_title":"Report on Residential Fireground Field Experiments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943472,"raw_reference":"NTSB/PAR-95/01, PB95-916501. National Transportation Safety Board (NTSB). 1996. “Pipeline Special Investigation Report.”","cited_authors":"NTSB/PAR-95/01, PB95-916501. National Transportation Safety Board (NTSB)","cited_year":"1996","cited_title":"Pipeline Special Investigation Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943473,"raw_reference":"NTSB/SIR-96/02, PB96-917002. National Transportation Safety Board (NTSB). 2002. “Pipeline Rupture and Subsequent Fire in Bellingham, Washington June 10, 1999.” NTSB/PAR-02/02, PB2002-916501. National Transportation Safety Board (NTSB). 2002. “Rupture of Piney Point Oil Pipeline and Release of Fuel Oil Near Chalk Point, Maryland April 7, 2000.” NTSB/PAR-02/01, PB2002916501. National Transportation Safety Board (NTSB). 2003. “Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000.” NTSB/PAR-03/01, PB2003-916501. National Transportation Safety Board (NTSB). 2009. “Rupture of Hazardous Liquid Pipeline with Release and Ignition of Propane Carmichael, Mississippi November 1, 2007.” NTSB/PAR09/01, PB2009-916501. National Transportation Safety Board (NTSB). 2011. “Operations Chairman Factual Report Addendum.” Accident Number: DCA10MP008, August 12. National Transportation Safety Board (NTSB). 2011. “Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010.”","cited_authors":"NTSB/SIR-96/02, PB96-917002. National Transportation Safety Board (NTSB)","cited_year":"2002","cited_title":"Pipeline Rupture and Subsequent Fire in Bellingham, Washington June 10, 1999","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943474,"raw_reference":"NTSB/PAR-11/01, PB2011-916501. Nicholson, M. 2012. “Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010.” National Transportation Safety Board. Oil and Gas Producers (OGP). 2010. “Consequence Modelling.” Report No. 434-7, The International Association of Oil and Gas Producers, London. Pipeline Association for Public Awareness (PAPA). 2011. Pipeline Emergency Response Guidelines. Golden, Colorado.","cited_authors":"NTSB/PAR-11/01, PB2011-916501. Nicholson, M","cited_year":"2012","cited_title":"Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943475,"raw_reference":"Woodward, J. L. 1998. Estimating the Flammable Mass of a Vapor Cloud. Center for Chemical Process Safety, American Institute of Chemical Engineers, New York.","cited_authors":"Woodward, J. L","cited_year":"1998","cited_title":"Estimating the Flammable Mass of a Vapor Cloud","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943476,"raw_reference":"Yan, S., et. al. 2004. Experimental Study of Burning Rate in Jet-Fuel Pool Fire. Department of Chemical and Fuels Engineering, University of Utah, Salt Lake City, Utah.","cited_authors":"Yan, S., et. al","cited_year":"2004","cited_title":"Experimental Study of Burning Rate in Jet-Fuel Pool Fire","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943477,"raw_reference":"PG&E’s communities and reduce the incidents of third party dig-ins. .................................. 65 Figure 54 – A portion of PG&E’s Utility Village at the Gas Safety Academy ................................................. 67 Figure 55 – Employees Taking Written Operator Qualification Exam ........................................................... 68 Figure 56 – Four Step Process to Contractor Safety and Oversight.................................................................. 70 Figure 57 – 2018 Safety Performance........................................................................................................................... 70 Figure 58 – Strategic Partner Safety Year Over Year Performance .................................................................. 71 Figure 59 – 69 Percent of Gas Operations’ Workforce Is Represented by the IBEW and the","cited_authors":null,"cited_year":null,"cited_title":"PG&E’s communities and reduce the incidents of third party dig-ins","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943478,"raw_reference":"ESC ...................................................................................................................................................................... 72 Figure 60 – Lean Management System in Gas Operations ................................................................................... 77 Figure 61 – Improved Productivity in Documentation Process ......................................................................... 79 Figure 62 – The Quality Management System ........................................................................................................... 81 Figure 63 – 2018 QA Field Metric Performance ....................................................................................................... 82 Figure 64 – Field Test of The Plastic Insert Detection Tool ................................................................................. 82 -92-","cited_authors":null,"cited_year":null,"cited_title":"ESC ...................................................................................................................................................................... 72 Figure 60 – Lean Management System in Gas Operations ................................................................................... 77 Figure 61 – Improved Productivity in Documentation Process ......................................................................... 79 Figure 62 – The Quality Management System ........................................................................................................... 81 Figure 63 – 2018 QA Field Metric Performance ....................................................................................................... 82 Figure 64 – Field Test of The Plastic Insert Detection Tool ................................................................................. 82 -92-","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943479,"raw_reference":"Register, December 19, 2016, p91860 – 91873. Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage,","cited_authors":"Register, December 19","cited_year":"2016","cited_title":"p91860 – 91873","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943480,"raw_reference":"API RP 1170, 1st edition, American Petroleum Institute, July 2015. Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer","cited_authors":"API RP 1170, 1st edition, American Petroleum Institute, July","cited_year":"2015","cited_title":"Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943481,"raw_reference":"Reservoirs, API RP 1171, 1st edition, American Petroleum Institute, September 2015.","cited_authors":"Reservoirs, API RP 1171, 1st edition, American Petroleum Institute, September","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943482,"raw_reference":"Amsterdam, The Netherlands, May 17 and 18, 2004. Manual for Determining the Remaining Strength of Corroded Pipelines, ASME B31G-1991, American Society of Mechanical Engineers, 1991. J. F. Kiefner and P. H. Vieth, A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe, Project PR 3-805, American Gas Association, December 22, 1989.","cited_authors":"Amsterdam, The Netherlands, May 17 and 18","cited_year":"2004","cited_title":"Manual for Determining the Remaining Strength of Corroded Pipelines, ASME B31G-1991, American Society of Mechanical Engineers, 1991","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943483,"raw_reference":"Propagation, and Arrest in Cylindrical Vessels”, Fracture Toughness, Proceedings of the 1971 National Symposium on Fracture Mechanics, Part II, ASTM STP 514, American Society for Testing and Materials, pp 70-81, 1972.","cited_authors":"Propagation, and Arrest in Cylindrical Vessels”, Fracture Toughness, Proceedings of the 1971 National Symposium on Fracture Mechanics, Part II, ASTM STP 514, American Society for Testing and Materials, pp 70-81","cited_year":"1972","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943484,"raw_reference":"STP 536, American Society for Testing and Materials, pp 461-481, 1973.","cited_authors":"STP 536, American Society for Testing and Materials, pp 461-481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943485,"raw_reference":"ASME, CRTD-Vol.43 (1996). (4) Clark, E.B., Leis, B.N., and Eiber, R.J., “Integrity Characteristics of Vintage Pipelines”, The","cited_authors":"ASME, CRTD-Vol.43","cited_year":"1996","cited_title":"Integrity Characteristics of Vintage Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943486,"raw_reference":"INGAA Foundation, Inc. (2005). (5) Kiefner, J. F., “Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments”, Proceedings of Engineering Technology Conference on Energy, Houston, Texas (February 2002). (6) Zelenak, P.A., Haines, H., and Kiefner, J.F., “Analysis of DOT Reportable Incidents for Gas Transmission and Gathering System Pipelines 1985 Through 2000”, Pipeline Research Council International, Inc., Catalog No. L51885 (January 2004). (7) Pipeline Accident Report: Rupture of Enbridge Pipeline and Release of Crude Oil near","cited_authors":"INGAA Foundation, Inc","cited_year":"2005","cited_title":"Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943487,"raw_reference":"Cohasset, Minnesota, July 4, 2002, NTSB Report Number: PAR-04-01, adopted on 6/23/2004. (8) Kiefner, J.F., Kiefner, B.A., and Vieth, P.H., “Analysis of DOT Reportable Incidents for","cited_authors":"Cohasset, Minnesota, July 4","cited_year":"2002","cited_title":"NTSB Report Number: PAR-04-01, adopted on 6/23/2004","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943488,"raw_reference":"Hazardous Liquid Pipelines, 1986 Through 1996”, API Publication 1158 (January 7, 1999). (9) Kiefner, J.F., Maxey, W.A., Eiber, R.J., and Duffy, A.R., \"Failure Stress Levels of Flaws in Pressurized Cylinders\", Progress in Flaw Growth and Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp 461-481 (1973). (10) Brooks, L.E., \"High-Pressure Testing – Pipeline Defect Behavior and Pressure Reversals\",","cited_authors":"Hazardous Liquid Pipelines, 1986 Through 1996”, API Publication 1158 (January 7","cited_year":"1999","cited_title":"Failure Stress Levels of Flaws in Pressurized Cylinders","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943489,"raw_reference":"ASME, 68-PET-24 (1968). (11) Kiefner, J. F., Maxey, W.A., and Eiber, R.J., \"A Study of Causes of Failure of Defects That Have Survived a Prior Hydrostatic Test\", Pipeline Research Committee, American Gas","cited_authors":"ASME, 68-PET-24","cited_year":"1968","cited_title":"A Study of Causes of Failure of Defects That Have Survived a Prior Hydrostatic Test","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943490,"raw_reference":"Association, NG-18 Report No. 111, (November 3, 1980). (12) Fearnehough, G.D., Hopkins, P., and Jones, D.G., \"The Effect of Hydrostatic Test Hold Period on Defect Behavior and Surviving Defect Population\", EPRG/NG-18, 8th Biennial Joint Technical Meeting on Line Pipe Research (May 14-17, 1991). (13) Leis, B.N. and Brust, F.W., \"Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile-Flaw-Growth Considerations\", American Gas Association, Pipeline Research","cited_authors":"Association, NG-18 Report No. 111, (November 3","cited_year":"1980","cited_title":"The Effect of Hydrostatic Test Hold Period on Defect Behavior and Surviving Defect Population","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943491,"raw_reference":"Committee, NG-18 Report No. 194 (July 27, 1992). (14) Hazardous Liquid Pipe Failure and Leak, Explorer Pipeline Company, Greenville, Texas, March 9, 2000, NTSB Report Number: PAB-01-03, adopted on 7/6/2001. (15) Kiefner, J. F., and Rosenfeld, M.J., \"Effects of Pressure Cycles on Gas Pipelines\", Gas Research Institute Contract No. 8749, Report No. GRI-04/0178 (September 17, 2004). (16) Kiefner, J.F., Kolovich, C.E., Zelenak, P.A., and Wahjudi, T., “Estimating Fatigue Life for Pipeline Integrity Management”, IPC04-0167, Proceedings of IPC 2004 International Pipeline Conference, Calgary, Alberta, Canada (October 4-8, 2004). (17) Peirce, B.O., A Short Table of Integrals, Third Revised Edition, Ginn and Company (1929). (18) Kim, C.D., \"Hydrogen-Damage Failures\", Metals Handbook, Ninth Edition, Volume 11, Failure Analysis and Prevention, American Society for Metals (1986). (19) Groeneveld, T.P., \"Hydrogen Stress Cracking\", Fifth Symposium on Line Pipe Research, American Gas Association, Inc., Catalog No. L30174 (November 20-22, 1974). (20) Masamura, K. and Masushima, I., “Grooving and Corrosion of Electric Resistance Welded Steel Pipe in Water, Case Histories and Effects of Alloying Elements”, CORROSION/81,","cited_authors":"Committee, NG-18 Report No. 194 (July 27","cited_year":"1992","cited_title":"Effects of Pressure Cycles on Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943492,"raw_reference":"NACE (1981). APPENDIX A Typical Manufacturing and Construction Defects","cited_authors":"NACE","cited_year":"1981","cited_title":"APPENDIX A Typical Manufacturing and Construction Defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943493,"raw_reference":"1. Dugdale, D. S., “Yielding of Steel Sheets Containing Slits”, Journal of the Mechanics and Physics of Solids, Vol. 8, 1960.","cited_authors":"1. Dugdale, D. S., “Yielding of Steel Sheets Containing Slits”, Journal of the Mechanics and Physics of Solids, Vol. 8","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943494,"raw_reference":"2. Folias, E. S., “The Stresses in a Cylindrical Shell Containing an Axial Crack”, ARL 64174, Aerospace Research Laboratories, October 1964.","cited_authors":"2. Folias, E. S., “The Stresses in a Cylindrical Shell Containing an Axial Crack”, ARL 64174, Aerospace Research Laboratories, October","cited_year":"1964","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943495,"raw_reference":"Mechanics, Vol. 5, 1969. 4. Maxey, W. A., Kiefner, J. F., Eiber, R. J., and Duffy, A. R., “Ductile Fracture Initiation,","cited_authors":"Mechanics, Vol. 5","cited_year":"1969","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943496,"raw_reference":"Propagation, and Arrest in Cylindrical Vessels”, ASTM STP 514, 1972.","cited_authors":"Propagation, and Arrest in Cylindrical Vessels”, ASTM STP 514","cited_year":"1972","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943497,"raw_reference":"5. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders, ASTM STP 536, 1973.","cited_authors":"5. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders, ASTM STP 536","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943498,"raw_reference":"6. ASME B31G, “Manual for Determining the Remaining Strength of Corroded Pipe”, 1984.","cited_authors":"6. ASME B31G, “Manual for Determining the Remaining Strength of Corroded Pipe”","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943499,"raw_reference":"7. Kiefner, J. F., and Vieth, P. H., “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe”, Project PR 3-805, A. G. A. Catalog No. L 51609, December 22, 1989. - 11 -","cited_authors":"7. Kiefner, J. F., and Vieth, P. H., “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe”, Project PR 3-805, A. G. A. Catalog No. L 51609, December 22","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943500,"raw_reference":"8. Kiefner, J. F., Vieth, P. H., and Roytman, I., “Continued Validation of RSTRENG”, Project PR 218-9304, A. G. A., Catalog No. L51749, December 20, 1996.","cited_authors":"8. Kiefner, J. F., Vieth, P. H., and Roytman, I., “Continued Validation of RSTRENG”, Project PR 218-9304, A. G. A., Catalog No. L51749, December 20","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943501,"raw_reference":"9. Kiefner, J. F., and Vieth, P. H., “Evaluating Pipe – 1: New Method Corrects Criterion for Evaluating Corroded Pipe”, Oil & Gas Journal, Aug. 6, 1990, and “Evaluating Pipe – Conclusion: “PC Program Speeds New Criterion for Evaluating Corroded Pipe”, Oil & gas Journal, Aug. 20, 1990.","cited_authors":"9. Kiefner, J. F., and Vieth, P. H., “Evaluating Pipe – 1: New Method Corrects Criterion for Evaluating Corroded Pipe”, Oil & Gas Journal, Aug. 6","cited_year":"1990","cited_title":"Evaluating Pipe – Conclusion: “PC Program Speeds New Criterion for Evaluating Corroded Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943502,"raw_reference":"10. API Recommended Practice 579, “Fitness-for-Service”, First Ed., January 2000.","cited_authors":"10. API Recommended Practice 579, “Fitness-for-Service”, First Ed., January","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943503,"raw_reference":"11. Sims, J. R., Hantz, B. F., and Kuehn, K. E., “A Basis for the Fitness for Service Evaluation of Thin Areas in Pressure Vessels and Storage Tanks”, ASME PVP-Vol. 233, 1992. - 12 - Interim Report for Phase II – Task 2 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Pipe Inventory, Inspection by In-The-Ditch Methods and In-Line","cited_authors":"11. Sims, J. R., Hantz, B. F., and Kuehn, K. E., “A Basis for the Fitness for Service Evaluation of Thin Areas in Pressure Vessels and Storage Tanks”, ASME PVP-Vol. 233","cited_year":"1992","cited_title":"- 12 - Interim Report for Phase II – Task 2 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Pipe Inventory, Inspection by In-The-Ditch Methods and In-Line","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943504,"raw_reference":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Contract No. G006084 Battelle Project No. 100004552 August 2017","cited_authors":null,"cited_year":null,"cited_title":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943505,"raw_reference":"Phase II, Tasks 2.1-2.11 Inspection by In-The-Ditch Methods and In-Line Inspection, and Hydrostatic Tests DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Tasks 2.1-2.11 Inspection by In-The-Ditch Methods and In-Line Inspection, and Hydrostatic Tests DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943506,"raw_reference":"[3] ApplusRTD, \"Long Seam Assessment On RFQ-15092 with IWEX: NDT ILI Verifications for Battelle,\" 2015.","cited_authors":"[3] ApplusRTD, \"Long Seam Assessment On RFQ-15092 with IWEX: NDT ILI Verifications for Battelle,\"","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943507,"raw_reference":"[4] C. Holmes, B. W. Drinkwater and P. D. Wilcox, \"The post-processing of ultrasonic aray data using the Total Focusing Method,\" Insight 46(11), pp. 677-680, 2005.","cited_authors":"[4] C. Holmes, B. W. Drinkwater and P. D. Wilcox, \"The post-processing of ultrasonic aray data using the Total Focusing Method,\" Insight 46(11), pp. 677-680","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943508,"raw_reference":"[6] H. H. Haines, L. Hörchens and P. Tomar, \"IPC2016-64069: Identifying and Sizing Axial Seam Weld Flaws in ERW Pipe Seams and SCC in the Pipe Body Using Ultrasonic Imaging,\" Proceedings of the 2016 11th International Pipeline","cited_authors":null,"cited_year":null,"cited_title":"IPC2016-64069: Identifying and Sizing Axial Seam Weld Flaws in ERW Pipe Seams and SCC in the Pipe Body Using Ultrasonic Imaging","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943509,"raw_reference":"Conference, (to be published October 2016).","cited_authors":"Conference, (to be published October","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943510,"raw_reference":"[7] RTD Quality Services USA, L.P., \"In-Ditch Validation Methodology for Determination of Defect Sizing,\" < https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503 >, DTPH56-13-T000008, 2013.","cited_authors":"[7] RTD Quality Services USA, L.P., \"In-Ditch Validation Methodology for Determination of Defect Sizing,\" < https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503 >, DTPH56-13-T000008","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943511,"raw_reference":"International Pipeline Conference, 2014.","cited_authors":"International Pipeline Conference","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943512,"raw_reference":"[9] Iowa State University, \"Advanced Nondestructive Characterization of Pipeline Materials,\" < http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511 >, DTPH56-13-H-CAAP07, 2015.","cited_authors":"[9] Iowa State University, \"Advanced Nondestructive Characterization of Pipeline Materials,\" < http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511 >, DTPH56-13-H-CAAP07","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943513,"raw_reference":"[10] R. B. Stonesifer, F. W. Brust and B. N. Leis, \"Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes,\" Fracture Mechanics: TwentySecond Symposium (Volume II), American Society for Testing and Materials (ASTM) STP 1131, Philadelphia, 1992.","cited_authors":"[10] R. B. Stonesifer, F. W. Brust and B. N. Leis, \"Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes,\" Fracture Mechanics: TwentySecond Symposium (Volume II), American Society for Testing and Materials (ASTM) STP 1131, Philadelphia","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943514,"raw_reference":"[11] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L, 2013. Appendix A 0533-1302 Final Battelle NPS 16Metallographic Examination Results Battelle Final Report No. 16-161","cited_authors":"[11] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L","cited_year":"2013","cited_title":"Appendix A 0533-1302 Final Battelle NPS 16Metallographic Examination Results Battelle Final Report No","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943515,"raw_reference":"NPS 16 Metallographic Examination Results of Seam Weld Anomalies Pushpendra Tomar & Bruce Nestleroth October 18, 2016 0533-1302 Intentionally blank Final Report No. 16-161 Final Report","cited_authors":null,"cited_year":null,"cited_title":"NPS 16 Metallographic Examination Results of Seam Weld Anomalies Pushpendra Tomar & Bruce Nestleroth October 18, 2016 0533-1302 Intentionally blank Final Report No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943516,"raw_reference":"OF SEAM WELD ANOMALIES BATTELLE October 18, 2016 Prepared by _______________________________ Pushpendra Tomar Engineer II Approved by _______________________________ Dyke Hicks Senior Principal Engineer Kiefner and Associates, Inc. 4480 Bridgeway Avenue, Suite D","cited_authors":null,"cited_year":null,"cited_title":"OF SEAM WELD ANOMALIES BATTELLE October 18, 2016 Prepared by _______________________________ Pushpendra Tomar Engineer II Approved by _______________________________ Dyke Hicks Senior Principal Engineer Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943517,"raw_reference":"American Gas Association, 1991.","cited_authors":"American Gas Association","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943518,"raw_reference":"[4] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[4] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943519,"raw_reference":"[5] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC 2016,","cited_authors":"[5] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943520,"raw_reference":"[6] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[6] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943521,"raw_reference":"[7] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC 2016,","cited_authors":"[7] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943522,"raw_reference":"[8] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC 2016,","cited_authors":"[8] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943523,"raw_reference":"[9] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[9] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943524,"raw_reference":"[10] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[10] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943525,"raw_reference":"EMAT Inline Inspection Technology for the Integrity Managment of Stress Corrosion Cracking (SCC) in Gas Pipelines,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"EMAT Inline Inspection Technology for the Integrity Managment of Stress Corrosion Cracking (SCC) in Gas Pipelines,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943526,"raw_reference":"[12] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety, 2014.","cited_authors":"[12] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943527,"raw_reference":"[13] B. Young, J. O'Brian and R. Olson, \"Validation of Fatigue Models for ERW Seam Weld Cracking\", in ASME PVP-2017, Waikola, 2017","cited_authors":null,"cited_year":null,"cited_title":"Validation of Fatigue Models for ERW Seam Weld Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943528,"raw_reference":"[14] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\" 1988. [Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552.","cited_authors":"[14] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\"","cited_year":"1988","cited_title":"[Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","cited_venue":null,"cited_doi":null,"cited_url":"www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943529,"raw_reference":"[15] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio, 1971.","cited_authors":"[15] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio","cited_year":"1971","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943530,"raw_reference":"[16] B. N. Leis, B. A. Young and e. al., \"Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures -Phase One,\" < http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8 67254CFB69090FD&c=1 >, DTPH56-11-T-000003, 2013.","cited_authors":"[16] B. N. Leis, B. A. Young and e. al., \"Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures -Phase One,\" < http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8 67254CFB69090FD&c=1 >, DTPH56-11-T-000003","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943531,"raw_reference":"[17] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L, 2013.","cited_authors":"[17] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943532,"raw_reference":"[18] D.-J. Shim and et al., \"Application of Extended Finite Element Method (XFEM) to Stress Intensity Factor Calculations,\" Proceedings of the ASME 2015 Pressure Vessels & Piping Conference, Massachusetts, 2015.","cited_authors":"[18] D.-J. Shim and et al., \"Application of Extended Finite Element Method (XFEM) to Stress Intensity Factor Calculations,\" Proceedings of the ASME 2015 Pressure Vessels & Piping Conference, Massachusetts","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943533,"raw_reference":"Insititute, \"API 579-1/ASME FFS-1, Second Edition,\" 2007.","cited_authors":"Insititute, \"API 579-1/ASME FFS-1, Second Edition,\"","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943534,"raw_reference":"[20] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus, 2017.","cited_authors":"[20] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943535,"raw_reference":"[21] B. A. Young, R. J. Olson and J. M. O'Brain, \"Phase 2, Task 4 Report: Analysis Models,\" Battelle Memorial Institute, 2017. [Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390.","cited_authors":"[21] B. A. Young, R. J. Olson and J. M. O'Brain, \"Phase 2, Task 4 Report: Analysis Models,\" Battelle Memorial Institute","cited_year":"2017","cited_title":"[Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943536,"raw_reference":"Kiefner, J. F., Mesloh, R. E., Kiefner, B. A.; “ Analysis of DOT Reportable Incidents For Gas Transmission and Gathering System Pipelines, 1985-1997”, PRCI, PR-218-9801, 1999.","cited_authors":"Kiefner, J. F., Mesloh, R. E., Kiefner, B. A.; “ Analysis of DOT Reportable Incidents For Gas Transmission and Gathering System Pipelines, 1985-1997”, PRCI, PR-218-9801","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943537,"raw_reference":"Hereth, M., Zurcher, J., and Selig, B., “Prevention Detection and Mitigation of Natural Gas Transmission Pipeline Failures,” GRI-00/193, December 2000.","cited_authors":"Hereth, M., Zurcher, J., and Selig, B., “Prevention Detection and Mitigation of Natural Gas Transmission Pipeline Failures,” GRI-00/193, December","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943538,"raw_reference":"Technology, Science Surveys Ltd., 2004, pp 1921 - 1943.","cited_authors":"Technology, Science Surveys Ltd","cited_year":"2004","cited_title":"pp 1921 - 1943","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943539,"raw_reference":"Selig, B., et al, “Natural Gas Transmission Pipeline Integrity: Prevention, Detection, and Repair Practices”, GRI-00/0193, Gas Research Institute, December 2000. Keifner & Associates, Inc., “GRI Guide for Locating and Using Pipeline Industry Research”, Gas Research Institute, May 2000.","cited_authors":"Selig, B., et al, “Natural Gas Transmission Pipeline Integrity: Prevention, Detection, and Repair Practices”, GRI-00/0193, Gas Research Institute, December","cited_year":"2000","cited_title":"GRI Guide for Locating and Using Pipeline Industry Research","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943540,"raw_reference":"Leis, B. N., and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, GRI 00/0229, January 2001.","cited_authors":"Leis, B. N., and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, GRI 00/0229, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943541,"raw_reference":"Leis, B. N., and Bubenik, T. A., “Periodic Re-Verification Intervals for High-Consequence Areas,” GRI Report-00/0230, January 2001.","cited_authors":"Leis, B. N., and Bubenik, T. A., “Periodic Re-Verification Intervals for High-Consequence Areas,” GRI Report-00/0230, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943542,"raw_reference":"Bubenik, T. A., Leis, B. N., Burgoon, D. A., Rust, S. W., Clark, E. B., Garrity, K., Veith, P. H., and van Oostendorp, D., “Direct Assessment and Validation”, GRI Report-00/0231, Gas Research Institute, December 2000: see also Haines, H. H. and Powell, D., “Guidelines for Implementing the External Corrosion Direct Assessment (ECDA) Process,” PRCI Catalog No. L52196, May 2004: see also NACE RP 0502.","cited_authors":null,"cited_year":null,"cited_title":"Direct Assessment and Validation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943543,"raw_reference":"Leis, B. N., and Parkins, R. N., “Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking”, Fatigue and Fracture of Engineering Materials & Structures 1998; Vol. 21: pp 583-601. anon., Stress-Corrosion Cracking Recommended Practices, Canadian Energy Pipeline","cited_authors":null,"cited_year":null,"cited_title":"Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943544,"raw_reference":"Association, 1997. Eiber, R. J., and Leis, B. N., “Review of Pressure Retesting For Gas Transmission Pipelines,”","cited_authors":"Association","cited_year":"1997","cited_title":"Review of Pressure Retesting For Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943545,"raw_reference":"GRI Report-01/02xx, February 2001. Leis, B. N., “Hydrostatic Testing Of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not”, PRCI Catalog No. L51844, Pipeline Research Council","cited_authors":"GRI Report-01/02xx, February","cited_year":"2001","cited_title":"Hydrostatic Testing Of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943546,"raw_reference":"International, 2001. Cosham, A. and Hopkins, P., “The Pipeline Defect Assessment Manual”, Proceedings of IPC 2002: International Pipeline Conference, Calgary, IPC02-27067, October 2002.","cited_authors":"International","cited_year":"2001","cited_title":"The Pipeline Defect Assessment Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943547,"raw_reference":"Eiber, R. J., and Leis, B. N., “Fracture Control Technology for Natural Gas Pipelines – Circa 2000”, PRCI Catalog No. L51846, Pipeline Research Council International, 2002.","cited_authors":"Eiber, R. J., and Leis, B. N., “Fracture Control Technology for Natural Gas Pipelines – Circa 2000”, PRCI Catalog No. L51846, Pipeline Research Council International","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943548,"raw_reference":"Rosenfeld, M. J., “Proposed New Guidelines for ASME B31.8 on Assessment of Dents and Mechanical Damage”, GRI 01/0084, 2001: see also Rosenfeld, M. J., “Investigations of Dent Re-Rounding Behavior,” Proceedings International Pipeline Conference – 1998, Volume 1, pp 299-308, ASME, 1998.","cited_authors":"Rosenfeld, M. J., “Proposed New Guidelines for ASME B31.8 on Assessment of Dents and Mechanical Damage”, GRI 01/0084, 2001: see also Rosenfeld, M. J., “Investigations of Dent Re-Rounding Behavior,” Proceedings International Pipeline Conference –","cited_year":"1998","cited_title":"Volume 1, pp 299-308, ASME, 1998","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943549,"raw_reference":"Research Council International, 2000. Leis, B. N., Chang, O. C., and Bubenik, T. A., “Leak versus Rupture Considerations for Steel Low-Stress Pipelines,” GRI Report-00/0232, Gas Research Institute, January 2001. anon., United States Department of Transportation, Transmission Pipeline Incident Databases, Office of Pipeline Safety web site, http:\\\\ops.dot.gov.","cited_authors":"Research Council International","cited_year":"2000","cited_title":"Leak versus Rupture Considerations for Steel Low-Stress Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943550,"raw_reference":"Trench, C. J. and Selig, B. J., “The Safety Performance of Natural Gas Transmission and Gathering Systems,” GTI-03/0031, April 2003.","cited_authors":"Trench, C. J. and Selig, B. J., “The Safety Performance of Natural Gas Transmission and Gathering Systems,” GTI-03/0031, April","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943551,"raw_reference":"Duffy, A. R., McClure, G. M., Maxey, W. A., and Atterbury, T. J., “Study of the Feasibility of Basing Natural Gas Pipeline Operating Pressure on Hydrostatic Test Pressure,” Pipeline Research Council International, PRCI Catalog No. L30050, 1968.","cited_authors":"Duffy, A. R., McClure, G. M., Maxey, W. A., and Atterbury, T. J., “Study of the Feasibility of Basing Natural Gas Pipeline Operating Pressure on Hydrostatic Test Pressure,” Pipeline Research Council International, PRCI Catalog No. L30050","cited_year":"1968","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943552,"raw_reference":"Leis, B. N., Brust, F. W., and Scott, P. M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,” PRCI Catalog No. L51543, Pipeline Research Council International, June 1991.","cited_authors":"Leis, B. N., Brust, F. W., and Scott, P. M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,” PRCI Catalog No. L51543, Pipeline Research Council International, June","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943553,"raw_reference":"Leis, B. N. and Ghadiali, N., “Pipe Axial Flaw Failure Criteria – PAFFC Version 4.0”, in Pipeline Failure Criteria Suite – PFC, September, 2001, supersedes all prior releases through “Pipe Axial Flaw Failure Criteria – PAFFC – Version 1.0,” Pipeline Research Committee","cited_authors":"Leis, B. N. and Ghadiali, N., “Pipe Axial Flaw Failure Criteria – PAFFC Version 4.0”, in Pipeline Failure Criteria Suite – PFC, September","cited_year":"2001","cited_title":"Pipe Axial Flaw Failure Criteria – PAFFC – Version 1.0","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943554,"raw_reference":"International, Catalog No. L 51680, May 1994. anon, ASME B31G Manual for Determining the Remaining Strength of Corroded Pipelines, American National Standards Institute /American Society of Mechanical Engineers, 1984: see also Kiefner, J.F., and Vieth, P.H., “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe,” Final Report on Project PR 3-805 to the Pipeline Research Committee of the American Gas Association, December 22, 1989.","cited_authors":"International, Catalog No. L 51680, May","cited_year":"1994","cited_title":"A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943555,"raw_reference":"Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111, November 1980.","cited_authors":"Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111, November","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943556,"raw_reference":"Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels”, International Pipeline Congress, Calgary, October 2004, ASME, IPC02-27015, 12 pages.","cited_authors":"Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels”, International Pipeline Congress, Calgary, October","cited_year":"2004","cited_title":"ASME, IPC02-27015, 12 pages","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943557,"raw_reference":"Leis, B. N., “Evolution of Line-Pipe Steel and its Implications for Transmission Pipeline Design,” International Pipeline Congress, Calgary, October 2002, ASME, IPC04-0665. anon., ASTM Standard E23-98, Notched Bar Impact Testing of Metallic Materials, ASTM Vol. 03.01.","cited_authors":"Leis, B. N., “Evolution of Line-Pipe Steel and its Implications for Transmission Pipeline Design,” International Pipeline Congress, Calgary, October","cited_year":"2002","cited_title":"ASME, IPC04-0665","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943558,"raw_reference":"Leis, B.N., and Stephens, D.R., “An Alternative Approach to Assess the Integrity of Corroded Line Pipe -- Part I: Current Status,” and “Part II: Alternative Criterion,” Volume 4, Proceedings 7th International Offshore and Polar Engineering Conference, Honolulu, May 1997, pp 624 – 634 and pp 635 – 641.","cited_authors":"Leis, B.N., and Stephens, D.R., “An Alternative Approach to Assess the Integrity of Corroded Line Pipe -- Part I: Current Status,” and “Part II: Alternative Criterion,” Volume 4, Proceedings 7th International Offshore and Polar Engineering Conference, Honolulu, May","cited_year":"1997","cited_title":"pp 624 – 634 and pp 635 – 641","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943559,"raw_reference":"Stephens, D.R., Leis, B.N., Kurre, J.D., and Rudland, D.L., “Development of an Alternative Failure Criterion for Residual Strength of Corrosion Defects in Moderate- to High-Toughness Pipe,” PRCI Catalog Number L51794, January 1999.","cited_authors":"Stephens, D.R., Leis, B.N., Kurre, J.D., and Rudland, D.L., “Development of an Alternative Failure Criterion for Residual Strength of Corrosion Defects in Moderate- to High-Toughness Pipe,” PRCI Catalog Number L51794, January","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943560,"raw_reference":"Olson, R. J., Narendran, V. K., Leis, B. N., Kilinski, T. J., Scott, P. M., and Gertler, R. C., “Full-Scale Testing to Validate PAFFC and Develop Data to Assist Evaluating the Benefits of Hydrotesting”, Appendix 7 of Reference 15, 2002","cited_authors":null,"cited_year":null,"cited_title":"Full-Scale Testing to Validate PAFFC and Develop Data to Assist Evaluating the Benefits of Hydrotesting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943561,"raw_reference":"Brooks, L. E., “Hydrostatic Testing of Pipe Lines”, Journal of the Pipeline Division, ASCE, Vol. 83, No. PL3, September 1957.","cited_authors":"Brooks, L. E., “Hydrostatic Testing of Pipe Lines”, Journal of the Pipeline Division, ASCE, Vol. 83, No. PL3, September","cited_year":"1957","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943562,"raw_reference":"Conference, Minneapolis, MN, Preprint No. 211, May 1965.","cited_authors":"Conference, Minneapolis, MN, Preprint No. 211, May","cited_year":"1965","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943563,"raw_reference":"Leis, B. N. and Forte, T. P., “Crack Growth Analysis for Axial Defects in Pipelines: Kinetics and Revalidation Intervals,” Final Report to the Research and Special Projects Agency (RSPA) of the U.S. Department of Transportation, November 2004.","cited_authors":"Leis, B. N. and Forte, T. P., “Crack Growth Analysis for Axial Defects in Pipelines: Kinetics and Revalidation Intervals,” Final Report to the Research and Special Projects Agency (RSPA) of the U.S. Department of Transportation, November","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943564,"raw_reference":"Leis, B N. and Eiber, R. J., “Protocol to Identify Potential Areas of High pH Stress Corrosion Cracking,” 11th PRCI/EPRG Biennial Joint Technical Meeting on Line Pipe Research, pp 9.119, Arlington, 1997.","cited_authors":"Leis, B N. and Eiber, R. J., “Protocol to Identify Potential Areas of High pH Stress Corrosion Cracking,” 11th PRCI/EPRG Biennial Joint Technical Meeting on Line Pipe Research, pp 9.119, Arlington","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943565,"raw_reference":"Broek, D., Engineering Fracture Mechanics, Nordhoff, 1974","cited_authors":null,"cited_year":null,"cited_title":"Broek, D., Engineering Fracture Mechanics, Nordhoff, 1974","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943566,"raw_reference":"Rolfe, S. T., and Barsom, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977: see also Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering","cited_authors":null,"cited_year":null,"cited_title":"Rolfe, S. T., and Barsom, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977: see also Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943567,"raw_reference":"Materials, John Wiley and Sons, 1976 Stephens Mark “A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines,” GRI-00-0189, December 2001.","cited_authors":"Materials, John Wiley and Sons, 1976 Stephens Mark “A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines,” GRI-00-0189, December","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943568,"raw_reference":"Leis, B. N., Zhu, X-K., Forte, T. P. and Glenn, B. C., “Design Basis for Fracture Arrestors in Gas Transmission Pipelines”, in Volume II -Pipeline Technology, Science Surveys Ltd., 2004, pp 515 - 533.","cited_authors":"Leis, B. N., Zhu, X-K., Forte, T. P. and Glenn, B. C., “Design Basis for Fracture Arrestors in Gas Transmission Pipelines”, in Volume II -Pipeline Technology, Science Surveys Ltd","cited_year":"2004","cited_title":"pp 515 - 533","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943569,"raw_reference":"Groeneveld, T. P., Wenk, R. L., and Elsea, A. R., “Investigation of the Susceptibility of HighStrength Steels to Hydrogen-Stress Cracking”, NG-18 Report No. 37, 1972 (PRCI Proprietary)","cited_authors":null,"cited_year":null,"cited_title":"Investigation of the Susceptibility of HighStrength Steels to Hydrogen-Stress Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943570,"raw_reference":"Research, American Gas Association, Catalog No. L30174, October, 1979.","cited_authors":"Research, American Gas Association, Catalog No. L30174, October","cited_year":"1979","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943571,"raw_reference":"Groeneveld, T. P., Davis, G. O, and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam Weld Corrosion,” NG-18 Report No. 199, Battelle Memorial Institute, September 1991.","cited_authors":"Groeneveld, T. P., Davis, G. O, and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam Weld Corrosion,” NG-18 Report No. 199, Battelle Memorial Institute, September","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943572,"raw_reference":"Kiefner, J. F., and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol.43, 1996 B. N. Leis, X. K. Zhu, and E. B. Clark, “Criteria to Assess Wrinklebend Severity for Use in Pipeline Integrity Management,” PRCI Catalog No. L52190, Pipeline Research Council","cited_authors":null,"cited_year":null,"cited_title":"Criteria to Assess Wrinklebend Severity for Use in Pipeline Integrity Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943573,"raw_reference":"International, August 2004. anon., Federal Power Commission Incident Database, 1950-1965. anon., Alberta Energy and Utilities Board, “Pipeline Performance in Alberta 1980-1997,” Report 98-G, December 1998. anon., Alberta Energy and Utilities Board, “Field Surveillance April 1998/March 1999 Provincial Summaries”, “Field Surveillance Provincial Summaries”, dated April 1999/March 2000, April 2000/March 2001, April 2001/March 2002, and January-December 2002, Statistical Series 57, various dates. anon., National Energy Board, “Focus on Safety, A Comparative Analysis of Pipeline Safety Performance,” April 2003. anon., Transportation Safety Board of Canada, “Commodity Pipeline Occurrences and Casualty Statistics,” published annually. anon., “European Gas Pipeline Incident Data Group - 5th EGIG Report 1970-2001”, December 2002.","cited_authors":"International, August","cited_year":"2004","cited_title":"Pipeline Performance in Alberta 1980-1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943574,"raw_reference":"Lyons, D., “Western European Cross-Country Oil Pipelines 30-Year Performance Statistics,” Report No. 1/02, prepared on behalf of CONCAWE oil pipeline Management Group, February 2002.","cited_authors":"Lyons, D., “Western European Cross-Country Oil Pipelines 30-Year Performance Statistics,” Report No. 1/02, prepared on behalf of CONCAWE oil pipeline Management Group, February","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943575,"raw_reference":"Kinsman, P. and Lewis, J., “Report on A Study of International Pipeline Accidents,” Contract Research Report 294/2000, 2000.","cited_authors":"Kinsman, P. and Lewis, J., “Report on A Study of International Pipeline Accidents,” Contract Research Report 294/2000","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943576,"raw_reference":"Kinsman, P. and Lewis, J., “Report on A Second Study of Pipeline Accidents Using The Health And Safety Executive’s Risk Assessment Programs MISHAP and PIPERS”, Research Report 036, 2002.","cited_authors":"Kinsman, P. and Lewis, J., “Report on A Second Study of Pipeline Accidents Using The Health And Safety Executive’s Risk Assessment Programs MISHAP and PIPERS”, Research Report 036","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943577,"raw_reference":"Greenwood, R., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (19612000),” Advantica Report R4798, June 2002. Advantica/anon., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (Up to end of 1998),” Advantica Report R4092, November 2000.","cited_authors":"Greenwood, R., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (19612000),” Advantica Report R4798, June","cited_year":"2002","cited_title":"UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (Up to end of 1998)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943578,"raw_reference":"Trench, C. J., “The U. S. Oil Pipeline Industry’s Safety Performance,” Report to Association of Oil Pipe Lines and the American Petroleum Institute’s Pipeline Committee, February 2003.","cited_authors":"Trench, C. J., “The U. S. Oil Pipeline Industry’s Safety Performance,” Report to Association of Oil Pipe Lines and the American Petroleum Institute’s Pipeline Committee, February","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943579,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Effects for Hazardous Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996.","cited_authors":"Greenfeld, J., et al, “Pipeline Accident Effects for Hazardous Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943580,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Consequences for Natural Gas and Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996","cited_authors":null,"cited_year":null,"cited_title":"Pipeline Accident Consequences for Natural Gas and Liquid Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943581,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Effects for Natural Gas Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996 anon., “Review of Integrity Management for Natural Gas Transmission Pipelines,” Gas Piping Technology Committee report, ANSI Technical Report Number ANSI-GPTC-Z380-TR-1, November 2001. anon., “Gas Transmission System Integrity Performance Indicators by Incident Data Analysis,”","cited_authors":"Greenfeld, J., et al, “Pipeline Accident Effects for Natural Gas Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996 anon., “Review of Integrity Management for Natural Gas Transmission Pipelines,” Gas Piping Technology Committee report, ANSI Technical Report Number ANSI-GPTC-Z380-TR-1, November","cited_year":"2001","cited_title":"Gas Transmission System Integrity Performance Indicators by Incident Data Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943582,"raw_reference":"URS Corporation Report to the Gas Research Institute, January 11, 2001.","cited_authors":"URS Corporation Report to the Gas Research Institute, January 11","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943583,"raw_reference":"Hovey, D. J. and Farmer, E. J., “Accident Frequency and Failure Probability of DOT Part 195 Pipelines from 1982 through 1992,”April 1993.","cited_authors":"Hovey, D. J. and Farmer, E. J., “Accident Frequency and Failure Probability of DOT Part 195 Pipelines from 1982 through","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943584,"raw_reference":"Hovey, D. J. and Farmer, E. J., “Trends in the Incidence and Cost of Liquid Pipeline Accidents from 1982 to 1991,” July 1992. anon., National Transportation Safety Board: · “High Pressure Natural Gas Pipeline, near Houston, Texas, September 9, 1969,” Report","cited_authors":"Hovey, D. J. and Farmer, E. J., “Trends in the Incidence and Cost of Liquid Pipeline Accidents from 1982 to","cited_year":"1991","cited_title":"High Pressure Natural Gas Pipeline, near Houston, Texas, September 9, 1969","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943585,"raw_reference":"PAR-71-01; · “Southern Union Gas Company, El Paso, Texas, April 22, 1973”, PAR-74-02; · “Washington Gas Light Company, Bowie, Maryland, June 23, 1973”, PAR-74-05; · “Michigan Wisconsin Pipeline Company, Monroe, Louisiana, March 2, 1974”, PAR-75-01; · “Southern Union Gas Company, Transmission Pipeline Failure, near Farmington, New","cited_authors":null,"cited_year":null,"cited_title":"Southern Union Gas Company, El Paso, Texas, April 22, 1973","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943586,"raw_reference":"Mexico, March 15, 1974”, PAR-75-03; · “Transcontinental Gas Pipeline Corp., 30 inch Transmission Line Failure, near Bealeton,","cited_authors":null,"cited_year":null,"cited_title":"Mexico, March 15, 1974”, PAR-75-03; · “Transcontinental Gas Pipeline Corp., 30 inch Transmission Line Failure, near Bealeton","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943587,"raw_reference":"Virginia, June 9, 1974”, PAR-75-02; · “Pennsylvania Gas and Water Company, Natural Gas Explosions, Williamsport,","cited_authors":null,"cited_year":null,"cited_title":"Virginia, June 9, 1974”, PAR-75-02; · “Pennsylvania Gas and Water Company, Natural Gas Explosions, Williamsport","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943588,"raw_reference":"Pennsylvania, January 25, 1977”, PAR-77-04; · “Mid-America Pipeline System Liquefied Petroleum Gas Pipeline Rupture and Fire,","cited_authors":null,"cited_year":null,"cited_title":"Pennsylvania, January 25, 1977”, PAR-77-04; · “Mid-America Pipeline System Liquefied Petroleum Gas Pipeline Rupture and Fire","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943589,"raw_reference":"Donnellson, Iowa, August 4, 1978”, PAR-79-01; · “Colonial Pipeline Company, Petroleum Products Pipeline Failures, Manassas and Locust","cited_authors":null,"cited_year":null,"cited_title":"Donnellson, Iowa, August 4, 1978”, PAR-79-01; · “Colonial Pipeline Company, Petroleum Products Pipeline Failures, Manassas and Locust","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943590,"raw_reference":"Grove, Virginia, March 6, 1980”, PAR-81-02; · “Texas Eastern, Jackson, Louisiana -- November 25, 1984”, PAR-86-01*; · “Continental Pipe Line Company Pipeline Rupture and Fire Kaycee, Wyoming, July 23, 1985,” PAR-86-01; · “Northeast Utilities Service Co. Explosion and Fire Derby, Connecticut December 6, 1985”,","cited_authors":"Grove, Virginia, March 6, 1980”, PAR-81-02; · “Texas Eastern, Jackson, Louisiana -- November 25, 1984”, PAR-86-01*; · “Continental Pipe Line Company Pipeline Rupture and Fire Kaycee, Wyoming, July 23","cited_year":"1985","cited_title":"Northeast Utilities Service Co. Explosion and Fire Derby, Connecticut December 6, 1985","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943591,"raw_reference":"PAR-86-02; · “Williams Pipe Line Company Liquid Pipeline Rupture and Fire Mounds Views, Minnesota July 8, 1986”, PAR-87-02; · “Continental Pipe Line, Kaycee, WY, July 23, 1985”, “Buckeye, Freeport, PA, March 30, 1990”, SIR-96-02; · “Hazardous Liquid Pipe Failure and Leak, Marathon Ashland Pipe Line, LLC Winchester,","cited_authors":null,"cited_year":null,"cited_title":"Williams Pipe Line Company Liquid Pipeline Rupture and Fire Mounds Views, Minnesota July 8, 1986","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943592,"raw_reference":"Kentucky, January 27, 2000”, PAR-01-02; · “Hazardous Liquid Pipe Failure and Leak, Explorer Pipeline Company, Greenville, Texas, March 9, 2000”, PAR-01-03; · “Pipeline Accident Report: Rupture of Piney Point Oil Pipeline and Release of Fuel Oil Near Chalk Point, Maryland”, PAR-02-01. Transportation Safety Board of Canada, Pipeline Investigation Reports P94H0003, P96H0008, P99H0021, and P00H0037, various dates. anon.,/Battelle, “Summary of Field Failure Investigations,” PRCI NG-18 Report 131, March 1982","cited_authors":null,"cited_year":null,"cited_title":"Hazardous Liquid Pipe Failure and Leak, Explorer Pipeline Company, Greenville, Texas, March 9, 2000","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943593,"raw_reference":"Hann, R. W., Beason, W. L., and Wellborn, M., “A Study of Natural Disasters and Pipelines,” Texas Transportation Institute, Texas A&M University System report to the U. S. Department of Transportation, June 1997.","cited_authors":"Hann, R. W., Beason, W. L., and Wellborn, M., “A Study of Natural Disasters and Pipelines,” Texas Transportation Institute, Texas A&M University System report to the U. S. Department of Transportation, June","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943594,"raw_reference":"Transportation, May 1997. anon., IGE/TD/1, “Steel Pipelines for High Pressure Gas Transmission” anon., ANSI/ASME Gas Transmission and Distribution Piping Systems, B31.8, American National Standards Institute/ American Society of Mechanical Engineers, 2001","cited_authors":"Transportation, May","cited_year":"1997","cited_title":"Steel Pipelines for High Pressure Gas Transmission","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943595,"raw_reference":"Shires, T.M. and Harrison, M.R.; “Development of The B31.8 Code And Federal Pipeline Safety Regulations: Implications For Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367, 1998. anon., “American Tentative Standard Code for Pressure Piping,” American Engineering Standards Committee, Sectional Committee B31, 1935.","cited_authors":"Shires, T.M. and Harrison, M.R.; “Development of The B31.8 Code And Federal Pipeline Safety Regulations: Implications For Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367","cited_year":"1998","cited_title":"American Tentative Standard Code for Pressure Piping","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943596,"raw_reference":"Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company report to the Gas Research Institute, FRI 00/00076, February 2000.","cited_authors":"Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company report to the Gas Research Institute, FRI 00/00076, February","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943597,"raw_reference":"Timoshenko, S. P. and Goodier, J. N., Theory of Elasticity, McGraw-Hill, Third Edition, 1970","cited_authors":null,"cited_year":null,"cited_title":"Timoshenko, S. P. and Goodier, J. N., Theory of Elasticity, McGraw-Hill, Third Edition, 1970","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943598,"raw_reference":"Hahn, G. T. Reid, C. N., and Gilbert, A., “The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel,” NG-18 Report No 6, March 1962: see also W. H. L. Hooper, J. Inst. Metals, vol. 81, p. 563, 1952: see also V. A. Phillips, A. J. Swain, and R. Eborall, J. Inst. Metals, vol. 81, p. 625, 1952.","cited_authors":"Hahn, G. T. Reid, C. N., and Gilbert, A., “The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel,” NG-18 Report No 6, March 1962: see also W. H. L. Hooper, J. Inst. Metals, vol. 81, p. 563, 1952: see also V. A. Phillips, A. J. Swain, and R. Eborall, J. Inst. Metals, vol. 81, p. 625","cited_year":"1952","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943599,"raw_reference":"Baird, J.D., “Strain aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May, 1963.","cited_authors":"Baird, J.D., “Strain aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May","cited_year":"1963","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943600,"raw_reference":"82. Kurth, R. E., and Leis, B. N., “Probabilistic Modeling of Stress-Corrosion Cracking: Part One – Model Development”, ASME PVP-Volume 386, August 1999, pp. 3-12: see also Leis, B. N., and Kurth, R. E., “Probabilistic Modeling of Stress-Corrosion Cracking: Part Two –Validation and Implications for Control”, ASME PVP-Volume 386, August 1999, pp. 13-23.","cited_authors":"82. Kurth, R. E., and Leis, B. N., “Probabilistic Modeling of Stress-Corrosion Cracking: Part One – Model Development”, ASME PVP-Volume 386, August","cited_year":"1999","cited_title":"Probabilistic Modeling of Stress-Corrosion Cracking: Part Two –Validation and Implications for Control","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943601,"raw_reference":"83. Herman, W.A., Erazo, M.A., Depatto, L.R., Sekizawa, M., Pense, A.W., “The Strain Aging Behavior of Microalloyed Steel”, Welding Research Council Research Bulletin 322, Welding Research Council, April 1987.","cited_authors":"83. Herman, W.A., Erazo, M.A., Depatto, L.R., Sekizawa, M., Pense, A.W., “The Strain Aging Behavior of Microalloyed Steel”, Welding Research Council Research Bulletin 322, Welding Research Council, April","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943602,"raw_reference":"84. Wilson, D.V., Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 468-479.","cited_authors":"84. Wilson, D.V., Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943603,"raw_reference":"85. Wilson, D.V., Russell, B., “The Contribution of Atmosphere Locking to the Strain- Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 36-45.","cited_authors":"85. Wilson, D.V., Russell, B., “The Contribution of Atmosphere Locking to the Strain- Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943604,"raw_reference":"Industry, November 1981, pp 118-123. 87. Rashid, M.S., “Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 6A, June 1975, pp. 1265-1268","cited_authors":"Industry, November","cited_year":"1981","cited_title":"Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943605,"raw_reference":"88. Leslie, W.C., Rickett, R.L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August 1953.","cited_authors":"88. Leslie, W.C., Rickett, R.L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August","cited_year":"1953","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943606,"raw_reference":"89. Daniloff, B.N., Mehl, R.F.,Herty, C.H., “ The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24, 1936, p 595.","cited_authors":"89. Daniloff, B.N., Mehl, R.F.,Herty, C.H., “ The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24","cited_year":"1936","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943607,"raw_reference":"90. Gawne, D.T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, August 1985, The Institute of Metals, pp 583-592.","cited_authors":"90. Gawne, D.T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, August","cited_year":"1985","cited_title":"The Institute of Metals, pp 583-592","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943608,"raw_reference":"91. Tither, G., Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals, 1975, Vol 27, pp15-23.","cited_authors":"91. Tither, G., Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals","cited_year":"1975","cited_title":"Vol 27, pp15-23","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943609,"raw_reference":"92. Rashid, M.S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April 1976, pp. 497-503.","cited_authors":"92. Rashid, M.S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April","cited_year":"1976","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943610,"raw_reference":"93. Hundy, B.B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May 1956, pp 203-211: see also Hundy, B.B.; “Accelerated Strain Ageing of Mild Steel”, Journal of the Iron and Steel Institute, September, 1954, pp 34-38","cited_authors":"93. Hundy, B.B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May","cited_year":"1956","cited_title":"Accelerated Strain Ageing of Mild Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943611,"raw_reference":"Journa, Iron and Steel Institute, Vol. 139, 1939, pp 341-385.","cited_authors":"Journa, Iron and Steel Institute, Vol. 139","cited_year":"1939","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943612,"raw_reference":"96. Deiter, G. E., Mechanical Metallurgy, Third edition, McGraw-Hill, 1986, pp. 280-281.","cited_authors":"96. Deiter, G. E., Mechanical Metallurgy, Third edition, McGraw-Hill","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943613,"raw_reference":"97. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85, 1946.","cited_authors":"97. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85","cited_year":"1946","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943614,"raw_reference":"98. Leslie, W.C., The Physical Metallurgy Of Steels, McGraw-Hill, 1981, pp. 110-115.","cited_authors":"98. Leslie, W.C., The Physical Metallurgy Of Steels, McGraw-Hill","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943615,"raw_reference":"Company, 1962, pp 102-103, 198-199. 100. Speich, G.R., Schwoeble, A.J., Leslie, W.C., “Elastic Constants of Binary Iron- Base Alloys”,","cited_authors":"Company","cited_year":"1962","cited_title":"Elastic Constants of Binary Iron- Base Alloys","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943616,"raw_reference":"ASM International, Metallurgical Transactions, Vol. 3, August 1971, pp 2031-2037.","cited_authors":"ASM International, Metallurgical Transactions, Vol. 3, August","cited_year":"1971","cited_title":"pp 2031-2037","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943617,"raw_reference":"101. Sinha, A.K., Ferrous Physical Metallurgy, Butterworth Publishers, 1989, pp. 45-47. 102. Van Vlack, L.H., Materials Science for Engineers, Addison-Wesley, 1970, pp. 188-190, 196198.","cited_authors":"101. Sinha, A.K., Ferrous Physical Metallurgy, Butterworth Publishers","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943618,"raw_reference":"103. Cooke, G.M.E., “An Introduction to the Mechanical Properties of Structural Steel at Elevated Temperatures”, Fire Safety Journal, 13, Elsevier, 1988, pp. 45-54.","cited_authors":"103. Cooke, G.M.E., “An Introduction to the Mechanical Properties of Structural Steel at Elevated Temperatures”, Fire Safety Journal, 13, Elsevier","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943619,"raw_reference":"Steel, 1971, Chapter 1, pp 1-35. 105. Luerssen, G.V. et. Al, “Manufacture of Iron and Steel”, Metals Handbook, American Society for Metals, 1948, pp 315-334.","cited_authors":"Steel","cited_year":"1971","cited_title":"Manufacture of Iron and Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943620,"raw_reference":"106. McClure, G.M., Eiber, R.J., Hahn, G.T., “Research on the Properties of Line Pipe”, Battelle Memorial Institute, NG-18 Report No. 5, 1962, pp. 97-117.","cited_authors":"106. McClure, G.M., Eiber, R.J., Hahn, G.T., “Research on the Properties of Line Pipe”, Battelle Memorial Institute, NG-18 Report No. 5","cited_year":"1962","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943621,"raw_reference":"107. Gladman, T., The Physical Metallurgy of Microalloyed Steels, The Institute of Materials, 1997, pp. 1-16.","cited_authors":"107. Gladman, T., The Physical Metallurgy of Microalloyed Steels, The Institute of Materials","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943622,"raw_reference":"PR-3-9214, May 1996: see also Olson, R., Clark, T., and Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe”, 10th Biennial Joint Technical Meeting on Line Pipe Research, EPRG/PRC, Paper 6, April 1995, Cambridge","cited_authors":"PR-3-9214, May 1996: see also Olson, R., Clark, T., and Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe”, 10th Biennial Joint Technical Meeting on Line Pipe Research, EPRG/PRC, Paper 6, April","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943623,"raw_reference":"109. Leis, B. N. et al., “Emerging Bedding, Padding, and Related Pipeline Construction Practices,” Final Report RSPA OTA DTRS56-03-T-0005 with INGAA cost share, December 2004.","cited_authors":"109. Leis, B. N. et al., “Emerging Bedding, Padding, and Related Pipeline Construction Practices,” Final Report RSPA OTA DTRS56-03-T-0005 with INGAA cost share, December","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943624,"raw_reference":"International, 1992: see also Leis, B. N., “New Insights into Hydrostatic Testing and Retesting,” Proceedings of the 1993 A.G.A. Operating Section, American Gas Association Catalog No. X59707, pp 532-543, 1993. 111. anon., Appendix E of “Submarine Pipeline Systems”, DNV-OS-F101, Det Norske Veritas, January 2000. 112. anon., \"Panhandle Lines\", Panhandle monthly employee publication, June 1964, Volume 21, No. 11, Kansas City, Mo.","cited_authors":"International, 1992: see also Leis, B. N., “New Insights into Hydrostatic Testing and Retesting,” Proceedings of the 1993 A.G.A. Operating Section, American Gas Association Catalog No. X59707, pp 532-543","cited_year":"1993","cited_title":"Submarine Pipeline Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943625,"raw_reference":"ISSN 2278 – 2540 [7]. Barnea, D., Taitel, Y. (1986). Flow pattern transition in two-phase gas-liquid flows. Encyclopedia of Fluid Mechanics, Vol. 3, Gas Liquid Flows. Gulf Publishing, Houston. [8]. Beggs, H. D., Brill, I P., (1973) A study of a two-phase flow in inclined pipes. I Pet. Technology, pp. 607-617. [9]. Edwards, Lyndon and Endean, Mark, (1990) Manufacturing with","cited_authors":"ISSN 2278 – 2540 [7]. Barnea, D., Taitel, Y","cited_year":"1986","cited_title":"Flow pattern transition in two-phase gas-liquid flows","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943626,"raw_reference":"Materials, Butterworth Scientific Ltd, ISBN 0408 027770 3. [10]. Ernst, H and Merchant, M E. (1941) Chip formation, friction and high quality machined surfaces, Surface Treatment of Metals (American Society of Metals). [11]. Fang, N. (1997) An auxiliary approach to the experimental study on chip control: A kinematically simulated test, Proceedings ofthe Institute ofMechanical Engineers, Vol.212, Part B. [12]. Garcia, Maria del Carmen; Carbognani, Lante; Urbina, Argelia;","cited_authors":"Materials, Butterworth Scientific Ltd, ISBN 0408 027770 3. [10]. Ernst, H and Merchant, M E","cited_year":"1941","cited_title":"Chip formation, friction and high quality machined surfaces, Surface Treatment of Metals (American Society of Metals)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943627,"raw_reference":"Orea, Miguel. (1998). Paraffm deposition in oil production. Oil composition and paraffin inhibitors activity, Journal of Petroleum Science and Technology, Vol. 16, Issue 9-10, Oct/Nov, 10011021. [13]. Garcia, Maria del Carmen; Carbognani, Lante; Urbina, Argelia;","cited_authors":"Orea, Miguel","cited_year":"1998","cited_title":"Paraffm deposition in oil production","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943628,"raw_reference":"Orea, Miguel. (2000) The influence of alkane class-types on crude oil wax crystallization and inhibitors efficiency, Journal of Petroleum Science and Technology, Vol. 25. [14]. Glauert, M B. (1956) The wall jet, Journal of Fluid Mechanics, 1, Part 5, 625-643. [15]. Gupta, A., and Sircar, A., (2015) Need of Flow Assurance for Crude Oil Pipelines: A Review. International Journal of Multidisciplinary Sciences and Engineering, Vol. 6, No. 2 pp: 1-7. [16]. Lee, E Hand Shaffer, B W. (1951) The theory of plasticity applied to a problem of machining, Journal of Applied Mechanics, Trans. A.S.ME., 73, 405. [17]. Loewen, E. G., Shaw, M. C., (1954 ) Trans. Am. Soc. mech. Engrs. 76, 217. [18]. Mendes; Braga; Azevedo; (1998) Correa. Resistive Force of Wax Deposits During Pigging Operations, Journal of Energy Resources","cited_authors":"Orea, Miguel","cited_year":"2000","cited_title":"The influence of alkane class-types on crude oil wax crystallization and inhibitors efficiency, Journal of Petroleum Science and Technology, Vol","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943629,"raw_reference":"Technology, ETCE99-6671. [19]. Merchant, ME and Zlatin, (1945) N. Mechanical Engineering 67, p737. [20]. Michelbach, S. Origin, (1995) Re-suspension and settling characteristics of solids transported in combined sewage, Water Science Technology, Vol. 31, No.7, 69-76. [21]. Mozes, G Y; Freund, M; Csikos, R; Keszthelyi, S. (1982) Paraffin Products- Properties Technologies Applications, Elsevier Scientific Publishing Company. [22]. http://psa-online.com/frequently-asked-questions.php [23]. https://en.wikipedia.org/wiki/Pigging [24]. http://www.rigzone.com/training/insight.asp?c_id=19&insight_id= Page 25 Pigging Previously Unpiggable Pipelines Alisdair Blackley1, Jason Weiss1, Brett McNabb2","cited_authors":"Technology, ETCE99-6671. [19]. Merchant, ME and Zlatin","cited_year":"1945","cited_title":"N. Mechanical Engineering 67, p737","cited_venue":null,"cited_doi":null,"cited_url":"http://psa-online.com/frequently-asked-questions.php","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943630,"raw_reference":"[1] US Department of Transportation, “Pipeline Basics,” 2019. [Online]. Available: https://primis.phmsa.dot.gov/comm/PipelineBasics.htm.","cited_authors":"[1] US Department of Transportation, “Pipeline Basics,”","cited_year":"2019","cited_title":"[Online]. Available: https://primis.phmsa.dot.gov/comm/PipelineBasics.htm","cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/comm/PipelineBasics.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943631,"raw_reference":"[2] V. Zaman and P. Dsouza, “Pioneering Approaches for Integrity Assessment of Multiphase - Difficult to Pig - Subsea Pipelines,” Inspectioneering Journal, no. May/June, 2015.","cited_authors":"[2] V. Zaman and P. Dsouza, “Pioneering Approaches for Integrity Assessment of Multiphase - Difficult to Pig - Subsea Pipelines,” Inspectioneering Journal, no. May/June","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943632,"raw_reference":"[3] Interstate Natural Gas Association of America, “Report to the National Transportation Safety Board on Historical and Future Development of Advanced In-Line Inspection Platforms for Use in Gas Transmission Pipelines,” 2012.","cited_authors":"[3] Interstate Natural Gas Association of America, “Report to the National Transportation Safety Board on Historical and Future Development of Advanced In-Line Inspection Platforms for Use in Gas Transmission Pipelines,”","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943633,"raw_reference":"[4] U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), “New Federal Regulations Add More Than 400,000 Miles of “Gas Gathering” Pipelines Under Federal Oversight,” 15 November 2021. [Online]. Available: https://www.phmsa.dot.gov/news/new-federal-regulations-add-more-400000miles-gas-gathering-pipelines-under-federal-oversight. [Accessed 21 November 2023].","cited_authors":"[4] U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), “New Federal Regulations Add More Than 400,000 Miles of “Gas Gathering” Pipelines Under Federal Oversight,” 15 November","cited_year":"2021","cited_title":"[Online]. Available: https://www.phmsa.dot.gov/news/new-federal-regulations-add-more-400000miles-gas-gathering-pipelines-under-federal-oversight","cited_venue":null,"cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/news/new-federal-regulations-add-more-400000miles-gas-gathering-pipelines-under-federal-oversight","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943634,"raw_reference":"[5] U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), “New Rule Strengthens Safety Requirements for more than 300,000 miles of Natural Gas Pipelines,” 4 August 2022. [Online]. Available: https://www.phmsa.dot.gov/news/phmsa-final-rule-safety-gas-transmission-pipelinesrepair-criteria-integrity-management-Improvements-cathodic-protection-managementof-change-and-other-related-amendments. [Accessed 28 December 2023].","cited_authors":"[5] U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), “New Rule Strengthens Safety Requirements for more than 300,000 miles of Natural Gas Pipelines,” 4 August","cited_year":"2022","cited_title":"[Online]. Available: https://www.phmsa.dot.gov/news/phmsa-final-rule-safety-gas-transmission-pipelinesrepair-criteria-integrity-management-Improvements-cathodic-protection-managementof-change-and-other-related-amendments","cited_venue":null,"cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/news/phmsa-final-rule-safety-gas-transmission-pipelinesrepair-criteria-integrity-management-Improvements-cathodic-protection-managementof-change-and-other-related-amendments","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943635,"raw_reference":"[6] M. F. e. Castro, “The COVID Retirement Boom,” 15 October 2021. [Online]. Available: https://research.stlouisfed.org/publications/economic-synopses/2021/10/15/the-covidretirement-boom. [Accessed 5 December 2023].","cited_authors":"[6] M. F. e. Castro, “The COVID Retirement Boom,” 15 October","cited_year":"2021","cited_title":"[Online]. Available: https://research.stlouisfed.org/publications/economic-synopses/2021/10/15/the-covidretirement-boom","cited_venue":null,"cited_doi":null,"cited_url":"https://research.stlouisfed.org/publications/economic-synopses/2021/10/15/the-covidretirement-boom","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943636,"raw_reference":"Pipelines International, 2013.","cited_authors":"Pipelines International","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943637,"raw_reference":"Logistics, Quest Integrity, La Palma, CA; Kent, WA, 2018.","cited_authors":"Logistics, Quest Integrity, La Palma, CA; Kent, WA","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943638,"raw_reference":"[11] Rosen Group, “Tailored for Access and Performance, Ultra-compact solution for small diameter flowlines,” Rosen Swiss AG, Stans, 2017.","cited_authors":"[11] Rosen Group, “Tailored for Access and Performance, Ultra-compact solution for small diameter flowlines,” Rosen Swiss AG, Stans","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943639,"raw_reference":"[12] C. J. Steve Banks, “Non-Traditional Approaches for Internal Inspection of Any Pipeline,” in \"Unpiggable\" Pipeline Solutions Forum, Houston, 2017.","cited_authors":"[12] C. J. Steve Banks, “Non-Traditional Approaches for Internal Inspection of Any Pipeline,” in \"Unpiggable\" Pipeline Solutions Forum, Houston","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943640,"raw_reference":"[13] Apache Pipeline Products, “Approximate Pressures and Flows Suggested for Pigging,” May 2014. [Online]. Available: https://www.apachepipe.com/assets/foam-pressures-andflow.pdf. [Accessed 10 January 2024].","cited_authors":"[13] Apache Pipeline Products, “Approximate Pressures and Flows Suggested for Pigging,” May","cited_year":"2014","cited_title":"[Online]. Available: https://www.apachepipe.com/assets/foam-pressures-andflow.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.apachepipe.com/assets/foam-pressures-andflow.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943641,"raw_reference":"[14] Apache Pipeline Products, “Durometer,” 2014. [Online]. Available: https://www.apachepipe.com/assets/definition-of-a-durometer.pdf. [Accessed 10 January 2024].","cited_authors":"[14] Apache Pipeline Products, “Durometer,”","cited_year":"2014","cited_title":"[Online]. Available: https://www.apachepipe.com/assets/definition-of-a-durometer.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.apachepipe.com/assets/definition-of-a-durometer.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943642,"raw_reference":"[15] United States Environmental Protection Agency, “EPA Observes Air Emissions from Natural Gas Gathering Operations in Violation of the Clean Air Act,” 2019.","cited_authors":"[15] United States Environmental Protection Agency, “EPA Observes Air Emissions from Natural Gas Gathering Operations in Violation of the Clean Air Act,”","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943643,"raw_reference":"[16] National Energy Board, “Canada’s Energy Future 2018 Natural Gas Liquids Supply and Disposition,” National Energy Board, 2018. Pipeline Pigging and Integrity Management Conference, Houston, February 2024","cited_authors":"[16] National Energy Board, “Canada’s Energy Future 2018 Natural Gas Liquids Supply and Disposition,” National Energy Board","cited_year":"2018","cited_title":"Pipeline Pigging and Integrity Management Conference, Houston, February 2024","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943644,"raw_reference":"[17] U.S. Department of Transportation, “Gas Gathering Fact Sheet,” 2 May 2022. [Online]. Available: https://www.phmsa.dot.gov/pipeline/gas-gathering/gas-gathering-fact-sheet. [Accessed 21 November 2023].","cited_authors":"[17] U.S. Department of Transportation, “Gas Gathering Fact Sheet,” 2 May","cited_year":"2022","cited_title":"[Online]. Available: https://www.phmsa.dot.gov/pipeline/gas-gathering/gas-gathering-fact-sheet","cited_venue":null,"cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/pipeline/gas-gathering/gas-gathering-fact-sheet","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943645,"raw_reference":"[18] 116th Congress, “Title I - Improving Pipeline Safety and Infrastructure,” 6 August 2020. [Online]. Available: https://www.congress.gov/bill/116th-congress/senatebill/2299/text#toc-idc845f03adf6142158d3f40c117340083. [Accessed 22 November 2023].","cited_authors":"[18] 116th Congress, “Title I - Improving Pipeline Safety and Infrastructure,” 6 August","cited_year":"2020","cited_title":"[Online]. Available: https://www.congress.gov/bill/116th-congress/senatebill/2299/text#toc-idc845f03adf6142158d3f40c117340083","cited_venue":null,"cited_doi":null,"cited_url":"https://www.congress.gov/bill/116th-congress/senatebill/2299/text#toc-idc845f03adf6142158d3f40c117340083","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943646,"raw_reference":"[21] Forbes, “U.S. Natural Gas Production Sets New Record High,” 30 August 2023. [Online]. Available: https://www.forbes.com/sites/rrapier/2023/08/30/us-natural-gas-productionsets-new-record-high/?sh=685de9fe19a2. [Accessed 4 January 2024].","cited_authors":"[21] Forbes, “U.S. Natural Gas Production Sets New Record High,” 30 August","cited_year":"2023","cited_title":"[Online]. Available: https://www.forbes.com/sites/rrapier/2023/08/30/us-natural-gas-productionsets-new-record-high/?sh=685de9fe19a2","cited_venue":null,"cited_doi":null,"cited_url":"https://www.forbes.com/sites/rrapier/2023/08/30/us-natural-gas-productionsets-new-record-high/?sh=685de9fe19a2","ref_kind":"news","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943647,"raw_reference":"[22] ARGUS, “Multi-Pig Launchers (Pig Frequently, Pig Efficiently),” [Online]. Available: https://www.argusinnovates.com/products/view-product/multi-pig-launchers. [Accessed 10 January 2024]. Interstate Natural Gas Association of America 20 F Street, N.W, Suite 450, Washington, D.C. 20001 phone: 202.216.5900 www.ingaa.org Response to NTSB Recommendation: Historical and Future Development of Advanced In-line Inspection (ILI) Platforms for Natural Gas Transmission Pipelines","cited_authors":null,"cited_year":null,"cited_title":"Multi-Pig Launchers (Pig Frequently, Pig Efficiently)","cited_venue":null,"cited_doi":null,"cited_url":"https://www.argusinnovates.com/products/view-product/multi-pig-launchers","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943648,"raw_reference":"INGAA members recognize that while pipeline safety has improved consistently, much more must be done to meet our goal of zero incidents. No issue is more important than improving pipeline safety and restoring public confidence. Achieving that depends on advancing Integrity Management Programs (IMPs), particularly assessment processes. The vast majority of the 300,000 miles of natural gas transmission pipelines are below ground and not amenable to direct visual inspection unless excavated. Since consensus inspection standards were first employed in the 1930s, operators have significantly advanced their diagnostic tools. Our focus has been strengthening inspection technology, and preventing threats to the integrity of the pipeline system.","cited_authors":"INGAA members recognize that while pipeline safety has improved consistently, much more must be done to meet our goal of zero incidents. No issue is more important than improving pipeline safety and restoring public confidence. Achieving that depends on advancing Integrity Management Programs (IMPs), particularly assessment processes. The vast majority of the 300,000 miles of natural gas transmission pipelines are below ground and not amenable to direct visual inspection unless excavated. Since consensus inspection standards were first employed in the","cited_year":"1930s","cited_title":"operators have significantly advanced their diagnostic tools","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943649,"raw_reference":"INGAA has made commitments to extend more broadly the learning and successes of integrity management applied in High Consequence Areas (HCAs) in the years ahead. The specific commitments are:  INGAA members will complete an initial assessment using Integrity Management (IM) principles on pipelines that cover 90 percent of the population living along INGAA members’ pipelines by December 31, 2012. It will then consistently and comprehensively apply IM principles to those lines by 2020.  Apply IM principles to pipelines covering 100 percent of the population living along INGAA member pipelines by 2030.","cited_authors":"INGAA has made commitments to extend more broadly the learning and successes of integrity management applied in High Consequence Areas (HCAs) in the years ahead. The specific commitments are:  INGAA members will complete an initial assessment using Integrity Management (IM) principles on pipelines that cover 90 percent of the population living along INGAA members’ pipelines by December 31","cited_year":"2012","cited_title":"It will then consistently and comprehensively apply IM principles to those lines by 2020","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943650,"raw_reference":"ILI Tools: History and Progress Since their development in 1965, ILI tools have revolutionized pipeline inspections. The initial tools used magnetic flux technology that could only identify metal loss in the bottom quarter of the pipe up to 30 miles. By 1970, ILI tools could read the entire pipe circumference, and rapid improvement began in the 1980s and continues to present. ILI developments have dramatically increased data acquisition and accuracy, April 2012 measurement capability, range, speed and types and sizes of pipelines.","cited_authors":"ILI Tools: History and Progress Since their development in","cited_year":"1965","cited_title":"ILI tools have revolutionized pipeline inspections","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943651,"raw_reference":"ILI technology was initially limited to metal loss detection. Improvements in technology from 1980 to 2000 include added sensors that addressed dents; mechanical damage detection capabilities; crack identification; and new types of sensors that improved resolution of metal loss and dents. In the early 2000s two ILI providers advanced the application of electromagnetically coupled acoustic technology. Today that technology is being applied to","cited_authors":null,"cited_year":null,"cited_title":"ILI technology was initially limited to metal loss detection","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943652,"raw_reference":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943653,"raw_reference":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc. Pressure Testing Formats Introduction","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO5 REV 3.doc April 2004 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943654,"raw_reference":"API, Recommended Practice for the Pressure Testing of Liquid Petroleum Pipelines, RP 1110, December 1981.","cited_authors":"API, Recommended Practice for the Pressure Testing of Liquid Petroleum Pipelines, RP 1110, December","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943655,"raw_reference":"Kiefner, John F., Willard A. Maxey “The Benefits and Limitations of Hydrostatic Testing”, 2000. Page 14","cited_authors":"Kiefner, John F., Willard A. Maxey “The Benefits and Limitations of Hydrostatic Testing”","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943656,"raw_reference":"2. Bergman, S. A., “Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?”, Pipeline and Gas Journal, December 1974.","cited_authors":"2. Bergman, S. A., “Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?”, Pipeline and Gas Journal, December","cited_year":"1974","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943657,"raw_reference":"3. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Evaluations of the Susceptibilities of Electric-Welded Pipe to Selective Seam-Weld Corrosion”, Eighth Biennial Joint Technical Meeting on Line Pipe Research, EPRG/NG-18, May 14-17, 1991.","cited_authors":"3. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Evaluations of the Susceptibilities of Electric-Welded Pipe to Selective Seam-Weld Corrosion”, Eighth Biennial Joint Technical Meeting on Line Pipe Research, EPRG/NG-18, May 14-17","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943658,"raw_reference":"4. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp461-481, 1973.","cited_authors":"4. Kiefner, J. F., Maxey, W. A., Eiber, R. J., and Duffy, A. R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp461-481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943659,"raw_reference":"5. Kiefner, J. F. and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol. 43, Book Number 100396, 292 pages, 1996.","cited_authors":"5. Kiefner, J. F. and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol. 43, Book Number 100396, 292 pages","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943660,"raw_reference":"6. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—1, Pressure Ratios Key to Effectiveness”, Oil and Gas Journal, pp 54-61, July 31, 2000.","cited_authors":"6. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—1, Pressure Ratios Key to Effectiveness”, Oil and Gas Journal, pp 54-61, July 31","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943661,"raw_reference":"7. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—Conclusion, Model Helps Prevent Failures”, Oil and Gas Journal, pp 54-58. August 7, 2000. Page 35","cited_authors":"7. Kiefner, J. F. and Maxey, W. A., “Hydrostatic Testing—Conclusion, Model Helps Prevent Failures”, Oil and Gas Journal, pp 54-58. August 7","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943662,"raw_reference":"8. Kiefner, J. F., “Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments”, Proceedings of Engineering Technology Conference on Energy, Houston, Texas, February 2002.","cited_authors":"8. Kiefner, J. F., “Dealing with Low-Frequency-Welded ERW Pipe and Flash-Welded Pipe with Respect to HCA-Related Integrity Assessments”, Proceedings of Engineering Technology Conference on Energy, Houston, Texas, February","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943663,"raw_reference":"ILI is an important investigation tool for determining the condition of a pipeline and is a significant part of a pipeline integrity management program recognized by codified provisions that promotes safe, efficient, and cost effective pipeline operation (NACE, 2000). However, all ILI tools are not equally effective for all types of defects. Rather, the selection of the tool, along with its resolution and accuracy requirements, must be targeted to the type of failure mechanism of concern. Code Provisions Relevant to ILI In the proposed rule making for 49 CFR 192, the operator can assess the integrity of a gas pipeline by one of the following methods: 1. Internal inspection (also known as ILI) 2. Pressure testing 3. Direct assessment 4. Any other method that provides an equivalent understanding of the condition of the line pipe 49 CFR 195.452 allows the operator of a liquid pipeline to assess the integrity of the line pipe by the following methods: 1. Internal inspection 2. Pressure testing (in accordance with 49 CFR 195 Subpart E) 3. Any other method that provides an equivalent understanding of the condition of the line pipe of which direct assessment is normally considered an alternative method.","cited_authors":"ILI is an important investigation tool for determining the condition of a pipeline and is a significant part of a pipeline integrity management program recognized by codified provisions that promotes safe, efficient, and cost effective pipeline operation (NACE","cited_year":"2000","cited_title":"However, all ILI tools are not equally effective for all types of defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943664,"raw_reference":"HAZ, and hook cracking (Kiefner, 2002). Hook cracks are manufacturing defects in the longitudinal weld of the pipe, caused by inclusions at the plate edge that are turned out of the plane of the steel during the welding process. It is the turning out of the metal at the weld that gives the characteristic “hook” or “J” shape to the crack (see Figure 5.1). These cracks may pass the manufacturer’s initial hydrostatic test, but fail later due to metal fatigue. Page 38","cited_authors":"HAZ, and hook cracking (Kiefner","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943665,"raw_reference":"MFL was the first method fully developed for pipeline ILI and has been the most widely used. (Bickerstaff, and NACE, 2000). The MFL tool induces an axial magnetic flux into the pipe wall between two poles of a magnet. A uniform homogeneous steel pipe without defects creates a uniform distribution of magnetic flux. Metal loss causes a disturbance in the magnetic flux, which, in a magnetically saturated pipe wall, “leaks” out. Sensors detect this leakage caused by the metal loss. Because the measurement of metal loss is indirect, only limited quantification using complex interpretation techniques is possible. MFL can be used to measure metal loss in both gas and liquid pipelines. Based on the testing needs, varying levels of sensitivity can be used. These levels are:","cited_authors":"MFL was the first method fully developed for pipeline ILI and has been the most widely used. (Bickerstaff, and NACE","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943666,"raw_reference":"2. Brown, William H., Wilson Rivera, “ILI Data Integratrion: Pipeline Integrity Analysis Using Multiple Inspection Technologies”, 2003.","cited_authors":"2. Brown, William H., Wilson Rivera, “ILI Data Integratrion: Pipeline Integrity Analysis Using Multiple Inspection Technologies”","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943667,"raw_reference":"NACE Corrosion 2002. 4. Kiefner, John F., Willard A. Maxey, “Periodic Hydrostatic Testing Or In-Line Inspection To Prevent Failures From Pressure-Cycle-Induced Fatigue”, 2000 Page 51","cited_authors":"NACE Corrosion","cited_year":"2002","cited_title":"Periodic Hydrostatic Testing Or In-Line Inspection To Prevent Failures From Pressure-Cycle-Induced Fatigue","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943668,"raw_reference":"Energy, February 2002. 6. NACE Technical Committee Report, “In-Line Nondestructive Inspection Of Pipelines” Publication 35100, December 2000 Page 52","cited_authors":"Energy, February","cited_year":"2002","cited_title":"In-Line Nondestructive Inspection Of Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943669,"raw_reference":"1. ASTM, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”, A 370, Annual Book of Standards, 2002.","cited_authors":"1. ASTM, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”, A 370, Annual Book of Standards","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943670,"raw_reference":"Standards, 2002. 3. Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering Materials, Third Ed., J. Wiley & Sons, Inc., 1989.","cited_authors":"Standards","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943671,"raw_reference":"ASTM, 1973. 5. Newman, J. C., and Raju, I. S., “An Empirical Stress-Intensity Factor Equation for the Surface Crack”, Eng. Fracture Mechanics, v. 15, Nov. 1981.","cited_authors":"ASTM","cited_year":"1973","cited_title":"An Empirical Stress-Intensity Factor Equation for the Surface Crack","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943672,"raw_reference":"6. Rolfe, S. T., and Barson, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977. Page 78","cited_authors":"6. Rolfe, S. T., and Barson, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall","cited_year":"1977","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943673,"raw_reference":"Carmichael, Mississippi, November 1, 2007,” NTSB PAR-09/01, Adopted October 2009. See http://www.ntsb.gov/investigations/summary/par0901.htm for related documentation.","cited_authors":"Carmichael, Mississippi, November 1","cited_year":"2007","cited_title":"” NTSB PAR-09/01, Adopted October 2009","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/investigations/summary/par0901.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943674,"raw_reference":"[2] Dyck, R., 2008. NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April 2008.","cited_authors":"[2] Dyck, R","cited_year":"2008","cited_title":"NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April 2008","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943675,"raw_reference":"Leis, B. N., Zhu, H-K., Nestleroth, J. B., and Clark, E. B., 2011.“Gap Analysis and Review of NTSB Report Par 09-01,” Final Report on Project PR-218-103706 / PRCI Task IM-1-1, Pipeline Research Council International, Inc., January 2011.","cited_authors":"Leis, B. N., Zhu, H-K., Nestleroth, J. B., and Clark, E. B","cited_year":"2011","cited_title":"Gap Analysis and Review of NTSB Report Par 09-01","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943676,"raw_reference":"[4] Anon., 2009. NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA. Battelle 23 October 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_authors":"[4] Anon","cited_year":"2009","cited_title":"NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA. Battelle 23 October 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943677,"raw_reference":"[2] API STD 1163, \"In-Line Inspection Systems Qualification,\" American Petroleum Institute, 2021.","cited_authors":"[2] API STD 1163, \"In-Line Inspection Systems Qualification,\" American Petroleum Institute","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943678,"raw_reference":"[3] NACE SP0102-2017, \"In-Line Inspection of Pipelines,\" National Association of Corrosion Engineers, 2017.","cited_authors":"[3] NACE SP0102-2017, \"In-Line Inspection of Pipelines,\" National Association of Corrosion Engineers","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943679,"raw_reference":"American Petroleum Institute, 2016.","cited_authors":"American Petroleum Institute","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943680,"raw_reference":"[5] CEPA / CSA SPE-225.7:22, \"Stress Corrosion Cracking, Recommended Practices,\" Canadian Energy Pipeline Association / Canadian Standards Association, 2007.","cited_authors":"[5] CEPA / CSA SPE-225.7:22, \"Stress Corrosion Cracking, Recommended Practices,\" Canadian Energy Pipeline Association / Canadian Standards Association","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943681,"raw_reference":"[6] ASME STP-PT-011, \"ntegrity Management of Stress Corrosion Cracking in Gas Pipeline High Consequence Areas,\" American Society of Mechanical Engineers, 2008.","cited_authors":"[6] ASME STP-PT-011, \"ntegrity Management of Stress Corrosion Cracking in Gas Pipeline High Consequence Areas,\" American Society of Mechanical Engineers","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943682,"raw_reference":"[7] SCC JIP Phase 2 Final Report, \"Joint Industry Project Addressing the Integrity Management of Stress Corrosion Cracking in Gas Transmission Pipelines,\" 2013.","cited_authors":"[7] SCC JIP Phase 2 Final Report, \"Joint Industry Project Addressing the Integrity Management of Stress Corrosion Cracking in Gas Transmission Pipelines,\"","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943683,"raw_reference":"[8] PRCI. PR-460-134506-R02, \"Assessing Crack-Like Flaws in Longitudinal Seam Welds - A State of the Art Review,\" Pipeline Research Council International, 2017.","cited_authors":"[8] PRCI. PR-460-134506-R02, \"Assessing Crack-Like Flaws in Longitudinal Seam Welds - A State of the Art Review,\" Pipeline Research Council International","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943684,"raw_reference":"[9] TTO Number 8, \"Stress Corrosion Cracking Study Final Report,\" Integrity Management Program Delivery Order DTRS56-02-D-70036. Department of Transportation, Research and Special Programs Administration, Office of Pipeline Safet, 2005.","cited_authors":"[9] TTO Number 8, \"Stress Corrosion Cracking Study Final Report,\" Integrity Management Program Delivery Order DTRS56-02-D-70036. Department of Transportation, Research and Special Programs Administration, Office of Pipeline Safet","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943685,"raw_reference":"[11] J. E. Kiefner, \"Modified Ln-Secant Equation Improves Failure Prediction,\" Oil and Gas Journal 106(38):64-66, 2008.","cited_authors":"[11] J. E. Kiefner, \"Modified Ln-Secant Equation Improves Failure Prediction,\" Oil and Gas Journal 106(38):64-66","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943686,"raw_reference":"[13] API 579-1/ASME FFS-1, \"Fitness-For-Service,\" American Petroleum Institute, 2021.","cited_authors":"[13] API 579-1/ASME FFS-1, \"Fitness-For-Service,\" American Petroleum Institute","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943687,"raw_reference":"[14] T. L. Anderson, \"Development of a Modern Assessment Method for Longitudinal Seam Weld Cracks,\" Pipeline Research Council Inc., Catalog No. PR-460-134401, 2016.","cited_authors":"[14] T. L. Anderson, \"Development of a Modern Assessment Method for Longitudinal Seam Weld Cracks,\" Pipeline Research Council Inc., Catalog No. PR-460-134401","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943688,"raw_reference":"ERW and Flash-Welded Seam,\" SubTask 2.4, USDOT Agreement No. DTPH56-11-T-000003. Battelle, 2013.","cited_authors":"ERW and Flash-Welded Seam,\" SubTask 2.4, USDOT Agreement No. DTPH56-11-T-000003. Battelle","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943689,"raw_reference":"[16] W. A. Maxey, J. F. Kiefner, R. J. Eiber and A. R. Duffy, \"Ductile Fracture Initiation, Propagation and Arrest in Cylindrical Vessels,\" ASTM STP 514, American Society for Testing and Materials, 1972.","cited_authors":"[16] W. A. Maxey, J. F. Kiefner, R. J. Eiber and A. R. Duffy, \"Ductile Fracture Initiation, Propagation and Arrest in Cylindrical Vessels,\" ASTM STP 514, American Society for Testing and Materials","cited_year":"1972","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943690,"raw_reference":"[17] W. A. Maxey, J. F. Kiefner, R. J. Eiber and A. R. Duffy, \"The Failure Stress Levels of Flaws in Pressurised Cylinders,\" ASTM STP 536, American Society for Testing and Materials, 1973.","cited_authors":"[17] W. A. Maxey, J. F. Kiefner, R. J. Eiber and A. R. Duffy, \"The Failure Stress Levels of Flaws in Pressurised Cylinders,\" ASTM STP 536, American Society for Testing and Materials","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943691,"raw_reference":"[18] ASTM STP 536, \"Progress in Flaw Growth and Fracture Toughness Testing,\" ASTM International, 1973.","cited_authors":"[18] ASTM STP 536, \"Progress in Flaw Growth and Fracture Toughness Testing,\" ASTM International","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943692,"raw_reference":"ASTM Special Technical Publications Symposia Paper STP49657S, 1973.","cited_authors":"ASTM Special Technical Publications Symposia Paper STP49657S","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943693,"raw_reference":"[21] ASTM E813, \"Standard Test Method for Jic, a Measure of Fracture Toughness,\" ASTM International (superceded by ASTM E1737), 1989.","cited_authors":"[21] ASTM E813, \"Standard Test Method for Jic, a Measure of Fracture Toughness,\" ASTM International (superceded by ASTM E1737)","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943694,"raw_reference":"[22] ASTM E1737, \"Standard Test Method for J-Integral Characterization of Fracture Toughness,\" ASTM International (superceded by E1820), 1996.","cited_authors":"[22] ASTM E1737, \"Standard Test Method for J-Integral Characterization of Fracture Toughness,\" ASTM International (superceded by E1820)","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943695,"raw_reference":"[23] ASTM E1290, \"Standard Test Method for Crack-Tip Opening Displacement (CTOD) Fracture Toughness Measurement,\" ASTM International, 2008.","cited_authors":"[23] ASTM E1290, \"Standard Test Method for Crack-Tip Opening Displacement (CTOD) Fracture Toughness Measurement,\" ASTM International","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943696,"raw_reference":"[25] ISO 15653, \"Metallic Materials — Method of Test for the Determination of Quasistatic Fracture Toughness of Welds,\" ISO, 2018.","cited_authors":"[25] ISO 15653, \"Metallic Materials — Method of Test for the Determination of Quasistatic Fracture Toughness of Welds,\" ISO","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943697,"raw_reference":"[28] ISO 148, \"Metallic Materials — Charpy Pendulum Impact Test — Part 1: Test method,\" ISO, 2016.","cited_authors":"[28] ISO 148, \"Metallic Materials — Charpy Pendulum Impact Test — Part 1: Test method,\" ISO","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943698,"raw_reference":"American Petroleum Institute, 2020.","cited_authors":"American Petroleum Institute","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943699,"raw_reference":"[31] NACE SP0204-2015, \"Stress Corrosion Cracking (SCC) Direct Assessment Methodology,\" National Association of Corrosion Engineers, 2015.","cited_authors":"[31] NACE SP0204-2015, \"Stress Corrosion Cracking (SCC) Direct Assessment Methodology,\" National Association of Corrosion Engineers","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943700,"raw_reference":"[32] BS 7910, \"Guide to Methods for Assessing the Acceptability of Flaws in Metallic Structures,\" British Standards Institution (BSI), 2019.","cited_authors":"[32] BS 7910, \"Guide to Methods for Assessing the Acceptability of Flaws in Metallic Structures,\" British Standards Institution (BSI)","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943701,"raw_reference":"[33] W. Bruce, M. Gould, T. Bubenik, C. Alexander and M. Rosenfield, \"PRCI Pipeline Repair Manual, PR186-204504-R,\" Pipeline Rsearch Council International (PRCI), 2022. Appendix A: Commentary on Examination and Repair by Grinding In situ direct examination using grinding is preferred if operating conditions and pipeline conditions are safe to do so. The iterative process of measuring the remaining wall thickness, performing MPI, and exercising grinding may deliver the accuracy and empirical data needed to validate the ILI assessment results. Secondly, if the appropriate criteria are met, grinding may serve as a pipeline repair. Each pipeline operator should develop their own procedure which considers the specific details for their pipeline, operations, competency, and target defect. The following is an example of performing direct examination and repair using grinding. Other approaches can be used, and useful guidance can be found in the PRCI Repair Manual [33]. Often operators will have their own procedure that needs to be followed. Example: Safe working pressure A safe working pressure should be determined by a competent person and the appropriate pressure reduction should be in place prior to work activities. Grinding Profile The grinded area should have a minimum slope of 4:1 (length and width-to-depth ratio). If the crack defects were removed by grinding no deeper than 0.060 inch in a 0.312 inch nominally thick pipe (see","cited_authors":"[33] W. Bruce, M. Gould, T. Bubenik, C. Alexander and M. Rosenfield, \"PRCI Pipeline Repair Manual, PR186-204504-R,\" Pipeline Rsearch Council International (PRCI)","cited_year":"2022","cited_title":"Appendix A: Commentary on Examination and Repair by Grinding In situ direct examination using grinding is preferred if operating conditions and pipeline conditions are safe to do so","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943702,"raw_reference":"Hall, R.J. and M.C. McMahon. 1999. Stress Corrosion Cracking Study. General Physics Corporation for U.S. Department of Transportation, Research and Special Programs","cited_authors":"Hall, R.J. and M.C. McMahon","cited_year":"1999","cited_title":"Stress Corrosion Cracking Study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943703,"raw_reference":"NEB. 1996. Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. Report of the Inquiry. National Energy Board. MH-2-95. December. Page 4 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"NEB","cited_year":"1996","cited_title":"Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943704,"raw_reference":"SCC failures on hazardous liquid pipelines have been less frequent when compared with SCC occurrences on natural gas pipelines. However, three failures of hazardous liquid pipelines during 2003 were attributed to SCC. Another hazardous liquid pipeline operator has reported finding nearcritical1 SCC defects. Extensive industry research has been conducted related to understanding the mechanism(s) by which","cited_authors":null,"cited_year":null,"cited_title":"SCC failures on hazardous liquid pipelines have been less frequent when compared with SCC occurrences on natural gas pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943705,"raw_reference":"SCC Detection, Science, and History: Compile a report summarizing the history of SCC on pipelines, explaining the causes and factors contributing to SCC initiation and growth, and discussing methods for prevention, detection, and mitigation of SCC on pipelines, including effectiveness of in-line inspection (ILI) tools and other in-the-bell-hole examination methods to detect SCC. Research Gap Analysis: Determine SCC-related R&D issues that warrant further research. Page 6 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"SCC Detection, Science, and History: Compile a report summarizing the history of SCC on pipelines, explaining the causes and factors contributing to SCC initiation and growth, and discussing methods for prevention, detection, and mitigation of SCC on pipelines, including effectiveness of in-line inspection (ILI) tools and other in-the-bell-hole examination methods to detect SCC. Research Gap Analysis: Determine SCC-related R&D issues that warrant further research","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943706,"raw_reference":"CEPA. 1997a. Stress Corrosion Cracking—Recommended Practices. Canadian Energy Pipeline Association.","cited_authors":"CEPA","cited_year":"1997a","cited_title":"Stress Corrosion Cracking—Recommended Practices","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943707,"raw_reference":"CEPA. 1997b. The CEPA Report on Circumferential Stress Corrosion Cracking. Submitted to the National Energy Board. Canadian Energy Pipeline Association. December.","cited_authors":"CEPA","cited_year":"1997b","cited_title":"The CEPA Report on Circumferential Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943708,"raw_reference":"CEPA. 1998. Stress Corrosion Cracking—Recommended Practices. Addendum on circumferential SCC. Canadian Energy Pipeline Association.","cited_authors":"CEPA","cited_year":"1998","cited_title":"Stress Corrosion Cracking—Recommended Practices","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943709,"raw_reference":"Eiber, R. J., and B.N Leis. 1998. Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines. PRCI. Project PR-3-9403, L51864.","cited_authors":"Eiber, R. J., and B.N Leis","cited_year":"1998","cited_title":"Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943710,"raw_reference":"NACE. 2003. External Stress Corrosion Cracking of Underground Pipelines. Publication 35103.","cited_authors":"NACE","cited_year":"2003","cited_title":"External Stress Corrosion Cracking of Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943711,"raw_reference":"NACE International. October. NEB. 1996. Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. Report of the Inquiry. National Energy Board. MH-2-95. December. Page 13 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"NACE International. October. NEB","cited_year":"1996","cited_title":"Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943712,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Page 14 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943713,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study Understanding Stress Corrosion Cracking (SCC) in Pipelines Scope Statement “Compile a report summarizing the history of SCC on pipelines, explaining the causes and factors contributing to SCC initiation and growth, and discussing methods for prevention, detection and mitigation of SCC on pipelines, including effectiveness of ILI tools and other in-the-bell hole examination methods to detect SCC.” The scope statement was broken down into components of Understanding Stress Corrosion Cracking (SCC) in Pipelines (Chapter 4); Prevention of an SCC Problem (Chapter 5); Detection and Assessment of SCC (Chapter 6); and Mitigation of SCC (Chapter 7). This chapter summarizes the current state of knowledge of understanding the mechanism and characterization of SCC – both classical (high pH SCC) as well as near-neutral pH SCC. General Characterization (NEB 1996)","cited_authors":"OPS TTO8 – Stress Corrosion Cracking Study Understanding Stress Corrosion Cracking (SCC) in Pipelines Scope Statement “Compile a report summarizing the history of SCC on pipelines, explaining the causes and factors contributing to SCC initiation and growth, and discussing methods for prevention, detection and mitigation of SCC on pipelines, including effectiveness of ILI tools and other in-the-bell hole examination methods to detect SCC.” The scope statement was broken down into components of Understanding Stress Corrosion Cracking (SCC) in Pipelines (Chapter 4); Prevention of an SCC Problem (Chapter 5); Detection and Assessment of SCC (Chapter 6); and Mitigation of SCC (Chapter 7). This chapter summarizes the current state of knowledge of understanding the mechanism and characterization of SCC – both classical (high pH SCC) as well as near-neutral pH SCC. General Characterization (NEB","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943714,"raw_reference":"SCC in pipelines is further characterized as “high pH SCC” or “near-neutral pH SCC,” with the “pH” referring to the environment on the pipe surface at the crack location and not the soil pH. (pH is the measure of the relative acidity or alkalinity of water. It is defined as the negative log (base 10) of the hydrogen ion concentration. Water with a pH of 7 is neutral; lower pH levels indicate an increasing acidity, while pH levels above 7 indicate increasingly basic solutions.) Page 15 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943715,"raw_reference":"Historically, SCC has been found on onshore buried pipelines, which is consistent with the information presented in Figure 4-1. SCC cracking is usually oriented longitudinally, normal to the hoop stress of the pipeline, which is usually the dominant stress component resulting from the internal pressure (see Figure 4-2). Additional examples of SCC colonies on steel pipe are presented as Figure 4-3, Figure 4-4, Figure 4-5, and Figure 4-6. However, SCC may also occur in the circumferential direction (C-SCC) when the predominant stress is an axial stress. Incidents resulting from C-SCC have been reported due to stresses induced by soil creep and localized bending from slope movements, and rock dents. Residual stresses at girth welds may also produce a resultant axial load within a pipeline. Page 16 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc. Figure 4-2","cited_authors":null,"cited_year":null,"cited_title":"Historically, SCC has been found on onshore buried pipelines, which is consistent with the information presented in Figure 4-1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943716,"raw_reference":"SCC Colony – Example One Page 17 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"SCC Colony – Example One Page 17 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943717,"raw_reference":"SCC Colony – Example Two Figure 4-5 SCC Colony – Example Three Page 18 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"SCC Colony – Example Two Figure 4-5 SCC Colony – Example Three Page 18 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943718,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study Figure 4-9 Transgranular Cracking in Pipeline Steel (Revie 2000) Crack Characteristics There are many similarities between the two forms of SCC. Both occur as colonies of multiple parallel cracks that are generally perpendicular to the direction of the highest stress on the external pipe surface. These cracks can vary in depth and length and grow in two directions. They increase in depth and length and tend to coalesce, or link together, to form longer cracks. At some point these cracks may reach a critical depth and length combination that can result in a rupture. A leak will occur if a crack grows through the pipe wall before it reaches a critical length for rupture. Note that critical size stress corrosion cracks do not need to fully penetrate the pipe wall for a rupture to occur, i.e., a shallow crack may reach a length that becomes critical. The strength and ductility of the remaining wall determines the critical size at which the crack behavior changes from a slowly growing stress corrosion mechanism to an extremely rapid brittle or ductile stress overload. The most obvious differences between the two forms of SCC are the temperature sensitivity of high pH SCC, the fracture morphology, and the pH of the environment in contact with the pipe surface. The characteristics of high pH and near-neutral pH SCC are summarized in Table 4-1. Page 21 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc. Table 4-1","cited_authors":"OPS TTO8 – Stress Corrosion Cracking Study Figure 4-9 Transgranular Cracking in Pipeline Steel (Revie","cited_year":"2000","cited_title":"Crack Characteristics There are many similarities between the two forms of SCC. Both occur as colonies of multiple parallel cracks that are generally perpendicular to the direction of the highest stress on the external pipe surface","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943719,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study Characteristics of High pH and Near-Neutral SCC in Pipelines (NEB 1996) Factor Near-neutral pH SCC Location Temperature Associated Electrolyte Electrochemical Potential Crack Path and Morphology 4.2.4 High pH SCC (Classical) 65 percent occurred between the compressor station and the 1st downstream block valve (distances between valves are typically 16 to 30 km) 12 percent occurred between the 1st and 2nd valves 5 percent occurred between the 2 and 3 valves 18 percent occurred downstream of the 3 valve","cited_authors":"OPS TTO8 – Stress Corrosion Cracking Study Characteristics of High pH and Near-Neutral SCC in Pipelines (NEB","cited_year":"1996","cited_title":"Factor Near-neutral pH SCC Location Temperature Associated Electrolyte Electrochemical Potential Crack Path and Morphology 4.2.4 High pH SCC (Classical) 65 percent occurred between the compressor station and the 1st downstream block valve (distances between valves are typically 16 to 30 km) 12 percent occurred between the 1st and 2nd valves 5 percent occurred between the 2 and 3 valves 18 percent occurred downstream of the 3 valve","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943720,"raw_reference":"Beavers, J.A. 1993. On the Mechanism of Stress Corrosion Cracking of Natural Gas Pipelines. Eighth Line Pipe Symposium. PRCI. L51680. Paper 17.","cited_authors":"Beavers, J.A","cited_year":"1993","cited_title":"On the Mechanism of Stress Corrosion Cracking of Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943721,"raw_reference":"Beavers, J.A., and K.C. Garrity. 2001. 100 mV Polarization Criterion and External SCC of Underground Pipelines. NACE International CORROSION/2001. Paper No. 01592. Page 30 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Beavers, J.A., and K.C. Garrity","cited_year":"2001","cited_title":"100 mV Polarization Criterion and External SCC of Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943722,"raw_reference":"Beavers, J.A., C.L. Durr, B.S. Delanty, D.M. Owen, and R.L. Sutherby. 2001. Near-Neutral pH","cited_authors":"Beavers, J.A., C.L. Durr, B.S. Delanty, D.M. Owen, and R.L. Sutherby","cited_year":"2001","cited_title":"Near-Neutral pH","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943723,"raw_reference":"CORROSION/2001. Paper No. 01217. Beavers, J.A. and W.V. Harper. 2004. Stress Corrosion Cracking Prediction Model. NACE International CORROSION/2004. Paper 04189.","cited_authors":"CORROSION/2001. Paper No. 01217. Beavers, J.A. and W.V. Harper","cited_year":"2004","cited_title":"Stress Corrosion Cracking Prediction Model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943724,"raw_reference":"Danielson, M.J., and R.H. Jones. 2001. Effect of Microstructure and Microchemistry on the","cited_authors":"Danielson, M.J., and R.H. Jones","cited_year":"2001","cited_title":"Effect of Microstructure and Microchemistry on the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943725,"raw_reference":"SCC Behavior of Archival and Modern Pipeline Steels in a High pH Environment. NACE International CORROSION/2001. Paper No. 01211.","cited_authors":null,"cited_year":null,"cited_title":"SCC Behavior of Archival and Modern Pipeline Steels in a High pH Environment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943726,"raw_reference":"Delanty, B.S., and J.E. Marr. 1992. Stress Corrosion Cracking Severity Rating Model. In Proceedings from the International Conference on Pipeline Reliability. CANMET. June.","cited_authors":"Delanty, B.S., and J.E. Marr","cited_year":"1992","cited_title":"Stress Corrosion Cracking Severity Rating Model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943727,"raw_reference":"Delanty, B.S., and J. O’Beirne. 1991. Low-pH Stress Corrosion Cracking. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. L30175.","cited_authors":"Delanty, B.S., and J. O’Beirne","cited_year":"1991","cited_title":"Low-pH Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943728,"raw_reference":"Delanty, B.S., and J. O’Beirne. 1992. Major Field Study Compares Pipeline SCC with Coatings. Oil and Gas Journal 90, 24.","cited_authors":"Delanty, B.S., and J. O’Beirne","cited_year":"1992","cited_title":"Major Field Study Compares Pipeline SCC with Coatings","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943729,"raw_reference":"Fessler, R.R. 1969. Stress-Corrosion-Cracking. In Proceedings from the Fourth Symposium on Line Pipe Research. PRCI. L30075. p. F-1 to F-18.","cited_authors":"Fessler, R.R","cited_year":"1969","cited_title":"Stress-Corrosion-Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943730,"raw_reference":"Fessler, R.R, T. Groeneveld, and A. Elsea. 1973. Stress-Corrosion and Hydrogen-Stress Cracking in Buried Pipelines. International Conference on Stress Corrsoion Cracking and Hydrogen Embrittlement of Iron Base Alloys. June. Published in Stress Corrosion Cracking and Hydrogen Embrittlement of Iron Base Alloys. NACE. 1977","cited_authors":"Fessler, R.R, T. Groeneveld, and A. Elsea","cited_year":"1973","cited_title":"Stress-Corrosion and Hydrogen-Stress Cracking in Buried Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943731,"raw_reference":"Marr, J.E. 1990. The Relationship Between External Pipeline Stress Corrosion Cracking and the Environment Within TCPL’s Facilities Across Canada. Unpublished TCPL Research Report. May.","cited_authors":"Marr, J.E","cited_year":"1990","cited_title":"The Relationship Between External Pipeline Stress Corrosion Cracking and the Environment Within TCPL’s Facilities Across Canada","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943732,"raw_reference":"Mercer, W.L. 1979. Stress Corrosion Cracking — Control Through Understanding. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. L30175","cited_authors":"Mercer, W.L","cited_year":"1979","cited_title":"Stress Corrosion Cracking — Control Through Understanding","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943733,"raw_reference":"NACE. 2003. External Stress Corrosion Cracking of Underground Pipelines. NACE International. Publication 35103. October.","cited_authors":"NACE","cited_year":"2003","cited_title":"External Stress Corrosion Cracking of Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943734,"raw_reference":"NEB. 1996. Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. Report of the Inquiry. National Energy Board. MH-2-95. December.","cited_authors":"NEB","cited_year":"1996","cited_title":"Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943735,"raw_reference":"Revie, R. Winston, ed. 2000. Uhlig’s Corrosion Handbook. 2nd Edition. Sponsored by the Electrochemical Society, Inc. John Wiley & Sons, Inc.","cited_authors":"Revie, R. Winston, ed","cited_year":"2000","cited_title":"Uhlig’s Corrosion Handbook","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943736,"raw_reference":"Wenk, R.L. 1974. Field Investigation of Stress Corrosion Cracking. In Proceedings of the Fifth Symposium on Line Pipe Research. PRCI. L30174. Page 31 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Wenk, R.L","cited_year":"1974","cited_title":"Field Investigation of Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943737,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Page 32 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943738,"raw_reference":"SCC. Near-neutral pH SCC is more frequently found with coatings that shield CP current, such as tape coatings. In the case of high pH SCC, the potential range for SCC lies between the native Page 33 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"SCC. Near-neutral pH SCC is more frequently found with coatings that shield CP current, such as tape coatings","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943739,"raw_reference":"SCC performance (CEPA 1997): Liquid Epoxy Urethane Extruded Polyethylene Multi-Layer or Composite Coatings Page 34 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"SCC performance (CEPA","cited_year":"1997","cited_title":": Liquid Epoxy Urethane Extruded Polyethylene Multi-Layer or Composite Coatings Page 34 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943740,"raw_reference":"CP ineffective. Page 36 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"CP ineffective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943741,"raw_reference":"Barlo, T. J. 1979. Stress Corrosion Cracking Steel Susceptibility. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. L30175.","cited_authors":"Barlo, T. J","cited_year":"1979","cited_title":"Stress Corrosion Cracking Steel Susceptibility","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943742,"raw_reference":"Barlo, T. J., and R. R. Fessler. 1981. Shot Peening, Grit Blasting Make Pipe Steels More Resistant to Stress-Corrosion Cracking. The Oil and Gas Journal 79, 46: p. 68.","cited_authors":"Barlo, T. J., and R. R. Fessler","cited_year":"1981","cited_title":"Shot Peening, Grit Blasting Make Pipe Steels More Resistant to Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943743,"raw_reference":"Beavers, J. A. and R. N. Parkins. 1986. Recent Advances in Understanding Factors Affecting Stress-Corrosion Cracking of Line-Pipe Steels. In Proceedings from the 7th Symposium on Line Pipe Research. PRCI. L51495.","cited_authors":"Beavers, J. A. and R. N. Parkins","cited_year":"1986","cited_title":"Recent Advances in Understanding Factors Affecting Stress-Corrosion Cracking of Line-Pipe Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943744,"raw_reference":"Beavers, J. A. 1992. Assessment of the Effects of Surface Preparation and Coating on the Susceptibility of Line Pipe to Stress Corrosion Cracking. PRCI. L51666.","cited_authors":"Beavers, J. A","cited_year":"1992","cited_title":"Assessment of the Effects of Surface Preparation and Coating on the Susceptibility of Line Pipe to Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943745,"raw_reference":"Beavers, J. A., N. G. Thompson, and K. E. W. Coulson. 1993a. Effects of Surface Preparation and Coatings on SCC Susceptibility of Line Pipe: Phase 1—Laboratory Studies.","cited_authors":"Beavers, J. A., N. G. Thompson, and K. E. W. Coulson","cited_year":"1993a","cited_title":"Effects of Surface Preparation and Coatings on SCC Susceptibility of Line Pipe: Phase 1—Laboratory Studies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943746,"raw_reference":"CORROSION/1993, Paper No. 93597. Beavers, J. A., N. G. Thompson, and K. E. W. Coulson. 1993b. Effects of Surface Preparation and Coatings on SCC Susceptibility of Line Pipe: Phase 2—Field Studies. Proceedings of the 12th International Conference on Offshore Mechanics and Arctic Engineering, June. Page 39 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"CORROSION/1993, Paper No. 93597. Beavers, J. A., N. G. Thompson, and K. E. W. Coulson","cited_year":"1993b","cited_title":"Effects of Surface Preparation and Coatings on SCC Susceptibility of Line Pipe: Phase 2—Field Studies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943747,"raw_reference":"Beavers, J. A., and C.E. Jaske. 1998. Near-Neutral-pH SCC In Pipelines: Effects of Pressure Fluctuations on Crack Propagation. CORROSION/1998, Paper No. 98257.","cited_authors":"Beavers, J. A., and C.E. Jaske","cited_year":"1998","cited_title":"Near-Neutral-pH SCC In Pipelines: Effects of Pressure Fluctuations on Crack Propagation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943748,"raw_reference":"Beavers, J. A., J. T. Johnson, R. L. Sutherby. 2000. Materials Factors Influencing the Initiation of Near-Neutral-pH SCC on Underground Pipelines.","cited_authors":"Beavers, J. A., J. T. Johnson, R. L. Sutherby","cited_year":"2000","cited_title":"Materials Factors Influencing the Initiation of Near-Neutral-pH SCC on Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943749,"raw_reference":"Beavers, J. A., and B.A. Harle. 2001. Mechanisms of High pH and Near Neutral pH SCC of Underground Pipelines. Journal of Offshore Mechanics and Arctic Engineering. August.","cited_authors":"Beavers, J. A., and B.A. Harle","cited_year":"2001","cited_title":"Mechanisms of High pH and Near Neutral pH SCC of Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943750,"raw_reference":"Beavers, J.A. and W.V. Harper. 2004. Stress Corrosion Cracking Prediction Model. NACE International CORROSION/2004. Paper 04189.","cited_authors":"Beavers, J.A. and W.V. Harper","cited_year":"2004","cited_title":"Stress Corrosion Cracking Prediction Model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943751,"raw_reference":"Berry, W. E. 1974. Stress Corrosion Cracking Laboratory Experiments. In Proceedings from the Fifth Symposium on Line Pipe Research. PRCI. L30174.","cited_authors":"Berry, W. E","cited_year":"1974","cited_title":"Stress Corrosion Cracking Laboratory Experiments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943752,"raw_reference":"CEPA. 1997. Stress Corrosion Cracking – Recommended Practices. Canadian Energy Pipeline Association.","cited_authors":"CEPA","cited_year":"1997","cited_title":"Stress Corrosion Cracking – Recommended Practices","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943753,"raw_reference":"Delanty, B. S. and J. O’Beirne. 1991. Low-pH Stress Corrosion Cracking. In Proceedings from the 18th World Gas Conference.","cited_authors":"Delanty, B. S. and J. O’Beirne","cited_year":"1991","cited_title":"Low-pH Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943754,"raw_reference":"Fessler, R. R. 1979. Stress Corrosion Cracking Temperature Effects. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. L30175.","cited_authors":"Fessler, R. R","cited_year":"1979","cited_title":"Stress Corrosion Cracking Temperature Effects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943755,"raw_reference":"NACE No. 1/SSPC-SP 5 (Reaffirmed 1999). White Metal Blast Cleaning. NACE International.","cited_authors":"NACE No. 1/SSPC-SP 5 (Reaffirmed","cited_year":"1999","cited_title":"White Metal Blast Cleaning","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943756,"raw_reference":"NACE No. 2/SSPC-SP 10 (Reaffirmed 1999). Near-White Metal Blast Cleaning. NACE International.","cited_authors":"NACE No. 2/SSPC-SP 10 (Reaffirmed","cited_year":"1999","cited_title":"Near-White Metal Blast Cleaning","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943757,"raw_reference":"NACE Standard RP 0204. 2004. Stress Corrosion Cracking (SCC) Direct Assessment Methodology. NACE International.","cited_authors":"NACE Standard RP 0204","cited_year":"2004","cited_title":"Stress Corrosion Cracking (SCC) Direct Assessment Methodology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943758,"raw_reference":"Parkins, R. N. 1974. The Controlling Parameters in Stress Corrosion Cracking. In Proceedings of the Fifth Symposium on Line Pipe Research. PRCI. L30174.","cited_authors":"Parkins, R. N","cited_year":"1974","cited_title":"The Controlling Parameters in Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943759,"raw_reference":"Parkins, R. N., and B. S. Greenwell. 1977. The Interface Between Corrosion Fatigue and Stress Corrosion Cracking. Metal Science Volume 11: p. 405.","cited_authors":"Parkins, R. N., and B. S. Greenwell","cited_year":"1977","cited_title":"The Interface Between Corrosion Fatigue and Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943760,"raw_reference":"Parkins, R. N., P. W. Slattery, B. S. Poulson. 1981. The Effects of Alloying Additions to Ferritic Steels upon Stress-Corrosion Cracking Resistance. Corrosion 37, 11: p.650.","cited_authors":"Parkins, R. N., P. W. Slattery, B. S. Poulson","cited_year":"1981","cited_title":"The Effects of Alloying Additions to Ferritic Steels upon Stress-Corrosion Cracking Resistance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943761,"raw_reference":"Surkov, J. P. et al. 1994. Corrosion Crack Initiation in Gas Pipelines. The Physics of Metals and Metallography 78, 1: p. 102.","cited_authors":"Surkov, J. P. et al","cited_year":"1994","cited_title":"Corrosion Crack Initiation in Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943762,"raw_reference":"Wenk, R. L. 1974. Field Investigation of Stress Corrosion Cracking. In Proceedings of the Fifth Symposium on Line Pipe Research. PRCI. L30174. Page 40 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Wenk, R. L","cited_year":"1974","cited_title":"Field Investigation of Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943763,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Page 41 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943764,"raw_reference":"SMYS for 1 hour) to remove long flaws capable of producing a rupture, followed by a long duration low-pressure test (e.g., 90 percent of SMYS for 24 hours) to locate leaks in the pipeline (Brongers, et al. 2000). The purpose of pressurizing to a high level for one hour is to remove potentially deleterious defects, while the purpose of holding at a reduced pressure for a long period is to avoid pressure reversals. A pressure reversal is where a defect survives hydrostatic testing at a high pressure only to subsequently fail at a lower pressure upon repressurization. PRCI studies (Kiefner 1986) have shown that a rupture at MAOP/MOP, as a result of a pressure reversal, is highly unlikely (<1/10,000) when the test pressure is at least 1.25 times the MAOP/MOP. If MAOP/MOP equals 72 percent of SMYS, this implies a minimum test pressure of 90 percent of SMYS. Furthermore, experimental fracture mechanics studies of specimens from ERW API 5L X52 and X65 steel line pipe showed that the amount of ductile crack tearing (crack advance) at loads up to 110 percent of","cited_authors":"SMYS for 1 hour) to remove long flaws capable of producing a rupture, followed by a long duration low-pressure test (e.g., 90 percent of SMYS for 24 hours) to locate leaks in the pipeline (Brongers, et al","cited_year":"2000","cited_title":"The purpose of pressurizing to a high level for one hour is to remove potentially deleterious defects, while the purpose of holding at a reduced pressure for a long period is to avoid pressure reversals","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943765,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study assessment method. In the case of crack-like defects, such as fatigue cracks and stress corrosion cracks, hydrostatic testing also will blunt and impart a compressive residual stress at the crack tip of sub-critical defects that remain in the pipeline following testing. The blunting and compressive residual stresses will inhibit subsequent fatigue or SCC crack growth (Hohl and Knauf 1999, Beavers and Hagedorn 1996). However, some of the blunted stress corrosion cracks may eventually re-initiate and therefore periodic retesting is required to ensure integrity of pipelines containing","cited_authors":"OPS TTO8 – Stress Corrosion Cracking Study assessment method. In the case of crack-like defects, such as fatigue cracks and stress corrosion cracks, hydrostatic testing also will blunt and impart a compressive residual stress at the crack tip of sub-critical defects that remain in the pipeline following testing. The blunting and compressive residual stresses will inhibit subsequent fatigue or SCC crack growth (Hohl and Knauf","cited_year":"1999","cited_title":"Beavers and Hagedorn 1996)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943766,"raw_reference":"API 5L X60 0.012 in/yr growth rate 1400 1500 1600 1700 1800 1900 2000 2100 2200 Hydrotest Pressure, psig Figure 6-1 Example of Remaining Life versus Hydrostatic Test Pressure (Using CorLASTM) Hydrostatic testing is not effective against circumferential flaws because the maximum axial stress produced by internal pressurization is less than one-half the circumferential stress. While hydrostatic testing is capable of locating leaks, it is not effective in removing short flaws that ultimately will produce leaks. Leaks can occur shortly after a hydrostatically tested line has been returned to service. Additional factors are worthy of consideration. Hydrostatic testing may be relatively expensive compared to the number of flaws that are removed, since the pipeline must be taken out of service.","cited_authors":null,"cited_year":null,"cited_title":"API 5L X60 0.012 in/yr growth rate 1400 1500 1600 1700 1800 1900 2000 2100 2200 Hydrotest Pressure, psig Figure 6-1 Example of Remaining Life versus Hydrostatic Test Pressure (Using CorLASTM) Hydrostatic testing is not effective against circumferential flaws because the maximum axial stress produced by internal pressurization is less than one-half the circumferential stress","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943767,"raw_reference":"Beavers, J.A. and E.L. Hagerdorn. 1996. Low pH SCC; Mechanical Effects on Crack Propagation. PRCI. L51760. Page 68 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Beavers, J.A. and E.L. Hagerdorn","cited_year":"1996","cited_title":"Low pH SCC; Mechanical Effects on Crack Propagation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943768,"raw_reference":"Brongers, M.P.H., J.A. Beavers, C.E. Jaske, and B.S. Delanty. 2000. Effect of Hydrostatic Testing on Ductile Tearing of X-65 Line Pipe Steel with Stress Corrosion Cracks. NACE International CORROSION/2000. Paper No. 00355.","cited_authors":"Brongers, M.P.H., J.A. Beavers, C.E. Jaske, and B.S. Delanty","cited_year":"2000","cited_title":"Effect of Hydrostatic Testing on Ductile Tearing of X-65 Line Pipe Steel with Stress Corrosion Cracks","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943769,"raw_reference":"CEPA. 1997. Stress Corrosion Cracking—Recommended Practices. Canadian Energy Pipeline Association.","cited_authors":"CEPA","cited_year":"1997","cited_title":"Stress Corrosion Cracking—Recommended Practices","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943770,"raw_reference":"Donald, J.K. and J. Ruschau. 1991. \"Direct Current Potential Difference Fatigue Crack Measurement Techniques\" Fatigue crack measurement: techniques and applications K J Marsh, R A Smith and R O Ritchie (eds), EMAS, Warley, West Midlands, 11-38.","cited_authors":"Donald, J.K. and J. Ruschau","cited_year":"1991","cited_title":"Direct Current Potential Difference Fatigue Crack Measurement Techniques","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943771,"raw_reference":"Francini, R.B., B.N. Leis, J.B. Nestleroth, and David W. Detly. 2000. Stress Corrosion Crack Depth Measurement. Final Report to PRCI on Project PR-3-8718.","cited_authors":"Francini, R.B., B.N. Leis, J.B. Nestleroth, and David W. Detly","cited_year":"2000","cited_title":"Stress Corrosion Crack Depth Measurement","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943772,"raw_reference":"Hohl, G. and G. Knauf. 1999. Field Hydrotesting and its Significance to Modern Pipelines. In Proceedings EPRG/PRCI 12th Biennial Joint Technical meeting on Pipeline Research. Paper 32. May.","cited_authors":"Hohl, G. and G. Knauf","cited_year":"1999","cited_title":"Field Hydrotesting and its Significance to Modern Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943773,"raw_reference":"Jaske, C.E. and J.A. Beavers. 2002a. Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines. In Proceedings of IPC 2002. Paper IPC02-27027.","cited_authors":"Jaske, C.E. and J.A. Beavers","cited_year":"2002a","cited_title":"Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943774,"raw_reference":"Kiefner, J.F., W.A. Maxey, R.J. Eiber, and A.R. Duffy. 1973. Failure Stress Levels of Flaws in Pressurized Cylinders. Progress in Flaw Growth and Fracture Toughness Testing, STP 536,","cited_authors":"Kiefner, J.F., W.A. Maxey, R.J. Eiber, and A.R. Duffy","cited_year":"1973","cited_title":"Failure Stress Levels of Flaws in Pressurized Cylinders","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943775,"raw_reference":"Kiefner, J.F. 1986. Evaluating Pipeline Integrity – Flaw Behavior During and Following High Pressure Testing. In Proceedings from the Seventh Symposium on Line Pipe Research, PRCI. L51495.","cited_authors":"Kiefner, J.F","cited_year":"1986","cited_title":"Evaluating Pipeline Integrity – Flaw Behavior During and Following High Pressure Testing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943776,"raw_reference":"Kiefner, J.F., and P.H. Vieth. 1993. The Remaining Strength of Corroded Pipe. In Proceedings of the Eighth Symposium on Line Pipe Research. PRCI. L51680.","cited_authors":"Kiefner, J.F., and P.H. Vieth","cited_year":"1993","cited_title":"The Remaining Strength of Corroded Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943777,"raw_reference":"Leis, B.N. and N.D. Ghadiali. 1994. Pipe Axial Flaw Failure Criteria---PAFFC, Version 1.0 User’s Manual and Software. PRCI. L51720.","cited_authors":"Leis, B.N. and N.D. Ghadiali","cited_year":"1994","cited_title":"Pipe Axial Flaw Failure Criteria---PAFFC, Version 1.0 User’s Manual and Software","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943778,"raw_reference":"NACE. 2000. In-Line Nondestructive Inspection of Pipelines, NACE International. Publication 35100.","cited_authors":"NACE","cited_year":"2000","cited_title":"In-Line Nondestructive Inspection of Pipelines, NACE International","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943779,"raw_reference":"NACE Standard RP 0104. 2004. Internal Corrosion Direct Assessment (ICDA) Methodology for Pipelines Carrying Normally Dry Natural Gas. NACE International.","cited_authors":"NACE Standard RP 0104","cited_year":"2004","cited_title":"Internal Corrosion Direct Assessment (ICDA) Methodology for Pipelines Carrying Normally Dry Natural Gas","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943780,"raw_reference":"NACE Standard RP0204. 2004. Stress Corrosion Cracking (SCC) Direct Assessment Methodology. NACE International.","cited_authors":"NACE Standard RP0204","cited_year":"2004","cited_title":"Stress Corrosion Cracking (SCC) Direct Assessment Methodology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943781,"raw_reference":"NACE Standard RP0502. 2002. Pipeline External Corrosion Direct Assessment Methodology.","cited_authors":"NACE Standard RP0502","cited_year":"2002","cited_title":"Pipeline External Corrosion Direct Assessment Methodology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943782,"raw_reference":"NACE International. Page 69 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"NACE International","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943783,"raw_reference":"Norris, J.D., B.P. Ashworth, M. Yeomans and N.I. Uzelac. 2001. Reconfirming the Integrity of a Gas Transmission Pipeline Following an SCC Induced Incident. NACE International","cited_authors":"Norris, J.D., B.P. Ashworth, M. Yeomans and N.I. Uzelac","cited_year":"2001","cited_title":"Reconfirming the Integrity of a Gas Transmission Pipeline Following an SCC Induced Incident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943784,"raw_reference":"CORROSION/2001. Paper No. 01631. Paris, P.C., H. Tada, A. Zahoor, and H. Ernst. 1979. The Theory of Instability of the Tearing Mode of Elastic-Plastic Crack Growth. Elastic-Plastic Fracture, STP 668, ASTM International, West Conshohocken, PA, pp. 5-36.","cited_authors":"CORROSION/2001. Paper No. 01631. Paris, P.C., H. Tada, A. Zahoor, and H. Ernst","cited_year":"1979","cited_title":"The Theory of Instability of the Tearing Mode of Elastic-Plastic Crack Growth","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943785,"raw_reference":"Selby, G. and J. Spanner. 2000. Sizing Stress Corrosion Cracking in Pipeline Specimens. GRI00/0064.","cited_authors":"Selby, G. and J. Spanner","cited_year":"2000","cited_title":"Sizing Stress Corrosion Cracking in Pipeline Specimens","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943786,"raw_reference":"Shih, C.F., and J.W. Hutchinson. 1975. Fully Plastic Solutions and Large Scale Yielding Estimates for Plane Stress Crack Problems. Report No. DEAP S-14, Harvard University,","cited_authors":"Shih, C.F., and J.W. Hutchinson","cited_year":"1975","cited_title":"Fully Plastic Solutions and Large Scale Yielding Estimates for Plane Stress Crack Problems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943787,"raw_reference":"Cambridge, MA. Zhou, J., M.C. Lugg and R. Collins. 1999. A Nonuniform Model for Alternating Current Field Measurement of Fatigue Cracks in Metals. Int. J. Appl. Electromag. Mech. 10 221-235. Page 70 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Cambridge, MA. Zhou, J., M.C. Lugg and R. Collins","cited_year":"1999","cited_title":"A Nonuniform Model for Alternating Current Field Measurement of Fatigue Cracks in Metals","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943788,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Page 71 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943789,"raw_reference":"API Standard 1160, Managing System Integrity for Hazardous Liquid Pipelines, presents a summary of commonly used permanent pipeline repairs in Table 9-2 for various anomaly types and locations, and describes numerous repair strategies in Appendix B. However, note 9 to Table 9-2 states: “Other repair methods may be used provided they are based on sound engineering practice,” and section 9.7 states: “The information in this standard should not be considered a complete summary of every type of repair, but an overview of some of the more frequently used techniques in the industry today.” The standard goes on to state: “In the absence of detailed company procedures for pipe replacement or repair the “Pipeline In-service Repair Manual” should be consulted.” The PRCI Pipeline Repair Manual (Kiefner, et al. 1999) presents a summary of repair applications in Table 1. The methods listed for repair of SCC are: Grinding (requires inspection as well); Deposited metal (requires grinding and inspection as well); Type A sleeve; Type B sleeve; Page 72 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"API Standard 1160, Managing System Integrity for Hazardous Liquid Pipelines, presents a summary of commonly used permanent pipeline repairs in Table 9-2 for various anomaly types and locations, and describes numerous repair strategies in Appendix B. However, note 9 to Table 9-2 states: “Other repair methods may be used provided they are based on sound engineering practice,” and section 9.7 states: “The information in this standard should not be considered a complete summary of every type of repair, but an overview of some of the more frequently used techniques in the industry today.” The standard goes on to state: “In the absence of detailed company procedures for pipe replacement or repair the “Pipeline In-service Repair Manual” should be consulted.” The PRCI Pipeline Repair Manual (Kiefner, et al","cited_year":"1999","cited_title":"presents a summary of repair applications in Table 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943790,"raw_reference":"CSA Z662-03 provides requirements for coating selection (Clause 4.1.7), coating properties, application and inspection (Clause 9.2.7), and a guide for test methods for the evaluation of coating properties (Annex L). Page 74 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc. 7.1.4","cited_authors":null,"cited_year":null,"cited_title":"CSA Z662-03 provides requirements for coating selection (Clause 4.1.7), coating properties, application and inspection (Clause 9.2.7), and a guide for test methods for the evaluation of coating properties (Annex L)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943791,"raw_reference":"Barlo, T.J. 1979. Effects of Hydrostatic Retests on Stress-Corrosion Cracking. In Proceedings from the Sixth Symposium on Line Pipe Research. PRCI. L30175.","cited_authors":"Barlo, T.J","cited_year":"1979","cited_title":"Effects of Hydrostatic Retests on Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943792,"raw_reference":"Keifner, J.F., W.A. Bruce, and D.R. Stephens. 1994, revised 1999. Pipeline Repair Manual.","cited_authors":"Keifner, J.F., W.A. Bruce, and D.R. Stephens","cited_year":"1994","cited_title":"revised 1999","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943793,"raw_reference":"PRCI. L51716. December. Koch, G.H., T.J. Barlo, W.E. Berry, and R.R. Fessler. 1983. Effects of Shot Peening and Grit Blasting on the Stress-Corrosion-Cracking Behavior of Line-Pipe. PRCI. L51451. April.","cited_authors":"PRCI. L51716. December. Koch, G.H., T.J. Barlo, W.E. Berry, and R.R. Fessler","cited_year":"1983","cited_title":"Effects of Shot Peening and Grit Blasting on the Stress-Corrosion-Cracking Behavior of Line-Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943794,"raw_reference":"Leis, B.N., and R.E. Kurth. 1999. Hydrotest Parameters to Help Control High pH SCC in Gas Transmission Lines. PRCI Project PR-3 9404. Page 77 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Leis, B.N., and R.E. Kurth","cited_year":"1999","cited_title":"Hydrotest Parameters to Help Control High pH SCC in Gas Transmission Lines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943795,"raw_reference":"VIII of B31.4 details minimum requirements and procedures for protection of ferrous line pipe from external and internal corrosion; however, it too does not explicitly discuss SCC. Although SCC is not specifically discussed in B31.4, multiple requirements relating to design, construction, operation and maintenance of pipelines have a direct or indirect effect on preventing SCC. Page 78 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"VIII of B31.4 details minimum requirements and procedures for protection of ferrous line pipe from external and internal corrosion; however, it too does not explicitly discuss SCC. Although SCC is not specifically discussed in B31.4, multiple requirements relating to design, construction, operation and maintenance of pipelines have a direct or indirect effect on preventing SCC. Page 78 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943796,"raw_reference":"API Recommended Practice 579 (RP579). 2000. Fitness-For-Service.","cited_authors":"API Recommended Practice 579 (RP579)","cited_year":"2000","cited_title":"Fitness-For-Service","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943797,"raw_reference":"API Recommended Practice 1160 (RP1160). 2001. Managing System Integrity of Hazardous Liquid Pipelines.","cited_authors":"API Recommended Practice 1160 (RP1160)","cited_year":"2001","cited_title":"Managing System Integrity of Hazardous Liquid Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943798,"raw_reference":"APIA. 2003. Revision to AS 2885.1 – Issue Paper No. 6.1, Stress Corrosion Cracking. by Geoff Cope. APIA. April 3, 2003.","cited_authors":"APIA","cited_year":"2003","cited_title":"Revision to AS 2885.1 – Issue Paper No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943799,"raw_reference":"AS 2885.1-2001. Pipelines–Gas and liquid petroleum. Part 1:Design and Construction. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. May 5, 1997. (Amdt 1-2001. April 19, 2001).","cited_authors":"AS 2885.1-2001. Pipelines–Gas and liquid petroleum. Part 1:Design and Construction. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. May 5","cited_year":"1997","cited_title":"(Amdt 1-2001","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943800,"raw_reference":"AS 2885.2-2002. Pipelines–Gas and liquid petroleum. Part 2:Welding Pipelines. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. June 21, 2002 Page 88 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"AS 2885.2-2002","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943801,"raw_reference":"AS 2885.3-2001. Pipelines–Gas and liquid petroleum. Part 3:Operations and Maintenance. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. August 6, 2001.","cited_authors":"AS 2885.3-2001. Pipelines–Gas and liquid petroleum. Part 3:Operations and Maintenance. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. August 6","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943802,"raw_reference":"AS 2885.4-2003: Pipelines–Gas and liquid petroleum. Part 4:Offshore submarine pipeline systems. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. December 22, 2003.","cited_authors":"AS 2885.4-2003: Pipelines–Gas and liquid petroleum. Part 4:Offshore submarine pipeline systems. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. December 22","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943803,"raw_reference":"AS/NZS 2885.5-2002. Pipelines–Gas and liquid petroleum. Part 5:Field pressure testing. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. April 4, 2002.","cited_authors":"AS/NZS 2885.5-2002. Pipelines–Gas and liquid petroleum. Part 5:Field pressure testing. Prepared by Committee ME-038, Petroleum Pipelines. Standards Australia International Ltd. April 4","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943804,"raw_reference":"ASME B31.4-2002, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids.","cited_authors":null,"cited_year":null,"cited_title":"ASME B31.4-2002, Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943805,"raw_reference":"ASME B31.8-2003, Gas Transmission and Distribution Piping Systems.","cited_authors":null,"cited_year":null,"cited_title":"ASME B31.8-2003, Gas Transmission and Distribution Piping Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943806,"raw_reference":"ASME B31.8S-2001, Managing System Integrity of Gas Pipelines.","cited_authors":null,"cited_year":null,"cited_title":"ASME B31.8S-2001, Managing System Integrity of Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943807,"raw_reference":"ASME B31G-1991, Manual for Determining the Remaining Strength of Corroded Pipelines.","cited_authors":null,"cited_year":null,"cited_title":"ASME B31G-1991, Manual for Determining the Remaining Strength of Corroded Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943808,"raw_reference":"NEB. 1996. Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. Report of the Inquiry. National Energy Board. MH-2-95. December. Page 89 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc. Research Gap Analysis Scope Statement","cited_authors":"NEB","cited_year":"1996","cited_title":"Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943809,"raw_reference":"SCC in several areas: Mechanisms of SCC Causes of SCC Page 90 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"SCC in several areas: Mechanisms of SCC Causes of SCC Page 90 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943810,"raw_reference":"Jeglic, F. 2004. Analysis of Ruptures and Trends on Major Canadian Pipeline Systems. In Proceedings of IPC 2004.","cited_authors":"Jeglic, F","cited_year":"2004","cited_title":"Analysis of Ruptures and Trends on Major Canadian Pipeline Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943811,"raw_reference":"NEB. 1996. Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. Report of the Inquiry. National Energy Board. MH-2-95. December. Page 115 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"NEB","cited_year":"1996","cited_title":"Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943812,"raw_reference":"ASME/ANSI B31.8S, Appendix A3. iii. Verify that the operator addresses missing data by either using conservative assumptions or assigning a higher priority to the segments affected by the missing data, as required by ASME/ANSI B31.8S, Appendix A3.2. Page 116 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"ASME/ANSI B31.8S, Appendix A3","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943813,"raw_reference":"Eiber, R. J., and B.N Leis. 1998. Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines. PRCI. Project PR-3-9403, L51864. Page 122 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":"Eiber, R. J., and B.N Leis","cited_year":"1998","cited_title":"Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943814,"raw_reference":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Page 123 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943815,"raw_reference":"RSPA/OPS. By 1970, OPS had adopted core requirements for the gas pipeline industry, with regulations for liquefied natural gas following in 1980, interstate hazardous liquid in 1981, and intrastate hazardous liquid in 1985.","cited_authors":"RSPA/OPS. By","cited_year":"1970","cited_title":"OPS had adopted core requirements for the gas pipeline industry, with regulations for liquefied natural gas following in 1980, interstate hazardous liquid in 1981, and intrastate hazardous liquid in 1985","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943816,"raw_reference":"Generally, in the event of a significant pipeline accident, it is understood that the NTSB will take primary charge of the incident and accident report itself, while the OPS will take primary charge of oversight of the return-to-service of the pipeline. Normally representatives from both agencies respond to the scene of a pipeline rupture as soon as practical to ensure data collection and dissemination to the various technical disciplines involved. 12.3 Initial Report The Accident Report form for liquid lines is available on-line from the OPS. Form No. 7000-1 (012001) “Accident Report – Hazardous Liquid Pipeline Systems,” which also has a companion document: “Instructions for Form RSPA F 7000-1 (01-2001). Accident Report – Hazardous Liquid Pipe Systems.” Similarly, for gas lines there is Form 7100.2 (01-2002) “Incident Report-Gas Page 124 of 135 SCC_Report_FINAL_REPORT_w_DB.doc 2/3/2005 Michael Baker Jr., Inc.","cited_authors":null,"cited_year":null,"cited_title":"Accident Report – Hazardous Liquid Pipeline Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943817,"raw_reference":"Asahi, H., T. Kushida, M. Kimura, H. Fukai, and S. Okano. 1996. The Investigation on Stress Corrosion Cracking in a Carbonate-Bicarbonate Solution and Its Mechanism for Metallurgical Aspects. In Proceedings from the Ninth Symposium on Pipeline Research. PRCI. Catalogue No. L1746. pp.17-1 to 17-18.","cited_authors":"Asahi, H., T. Kushida, M. Kimura, H. Fukai, and S. Okano","cited_year":"1996","cited_title":"The Investigation on Stress Corrosion Cracking in a Carbonate-Bicarbonate Solution and Its Mechanism for Metallurgical Aspects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943818,"raw_reference":"Baker, T.R., G.G. Rochfort, and R.N. Parkins. 1986. Investigations Relating to Stress Corrosion Cracking on the Pipeline Authority’s Moomba to Sydney Pipeline. In Proceedings from the Seventh Symposium on Line Pipe Research. PRCI. Catalogue No. L51495. pp. 27-1 to 27-25.","cited_authors":"Baker, T.R., G.G. Rochfort, and R.N. Parkins","cited_year":"1986","cited_title":"Investigations Relating to Stress Corrosion Cracking on the Pipeline Authority’s Moomba to Sydney Pipeline","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943819,"raw_reference":"Barlo, T. 1979. Factors that Influence the Susceptibility of a Steel to Stress-Corrosion Cracking. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI Catalogue No. L0175. pp. P-1 to P-17.","cited_authors":"Barlo, T","cited_year":"1979","cited_title":"Factors that Influence the Susceptibility of a Steel to Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943820,"raw_reference":"Beavers, J.A. and W.V. Harper. 2004. Stress Corrosion Cracking Prediction Model. NACE International CORROSION 2004. Paper 04189.","cited_authors":"Beavers, J.A. and W.V. Harper","cited_year":"2004","cited_title":"Stress Corrosion Cracking Prediction Model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943821,"raw_reference":"Beavers, J.A., and C.L. Durr. 2001. Cathodic Protection Conditions Conducive to SCC. Final Report to PRCI on Project PR 186-9807.","cited_authors":"Beavers, J.A., and C.L. Durr","cited_year":"2001","cited_title":"Cathodic Protection Conditions Conducive to SCC. Final Report to PRCI on Project PR 186-9807","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943822,"raw_reference":"Beavers, J.A., and C. Jaske. 2002. Effects of Pressure Fluctuations on SCC Propagation. Final Report to PRCI on Project PR 186-9706. Catalogue No. L51872.","cited_authors":"Beavers, J.A., and C. Jaske","cited_year":"2002","cited_title":"Effects of Pressure Fluctuations on SCC Propagation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943823,"raw_reference":"Beavers, J.A., C.L. Durr, and S.S. Shademan. 1998. Mechanistic Studies of Near-neutral pH","cited_authors":"Beavers, J.A., C.L. Durr, and S.S. Shademan","cited_year":"1998","cited_title":"Mechanistic Studies of Near-neutral pH","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943824,"raw_reference":"DB.doc 2/3/2005 Michael Baker Jr., Inc. OPS TTO8 – Stress Corrosion Cracking Study","cited_authors":null,"cited_year":null,"cited_title":"DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943825,"raw_reference":"Beavers, J.A., J.T. Johnson, and R.L. Sutherby. 2000. Materials Factors Influencing the Initiation of Near-Neutral pH SCC on Underground Pipelines. In 2000 Proceedings of International Pipeline Conference. ASME. pp. 979-988.","cited_authors":"Beavers, J.A., J.T. Johnson, and R.L. Sutherby","cited_year":"2000","cited_title":"Materials Factors Influencing the Initiation of Near-Neutral pH SCC on Underground Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943826,"raw_reference":"Beavers, J.A., and W.V. Harper. 2004. Stress Corrosion Cracking Prediction Model. Corrosion 2004, Paper 04189.","cited_authors":"Beavers, J.A., and W.V. Harper","cited_year":"2004","cited_title":"Stress Corrosion Cracking Prediction Model","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943827,"raw_reference":"CEPA. 1998. CEPA Stress Corrosion Cracking Database: First Trending Report. Submitted to Canadian National Energy Board. January 1998.","cited_authors":"CEPA","cited_year":"1998","cited_title":"CEPA Stress Corrosion Cracking Database: First Trending Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943828,"raw_reference":"Christman, T.K. 1988a. Evaluation of Stress-Corrosion Cracking Resistance of Newly Developed Grade X70 and X80 Line Pipe Steels. NG-18 Report 173 to PRC. PRCI. Catalogue No. L51563.","cited_authors":"Christman, T.K","cited_year":"1988a","cited_title":"Evaluation of Stress-Corrosion Cracking Resistance of Newly Developed Grade X70 and X80 Line Pipe Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943829,"raw_reference":"Christman, T.K. 1988b. Prediction of SCC Susceptibility Based on Mechanical Properties of Line Pipe Steels. NG-18 Report 180. Catalogue No. L51577.","cited_authors":"Christman, T.K","cited_year":"1988b","cited_title":"Prediction of SCC Susceptibility Based on Mechanical Properties of Line Pipe Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943830,"raw_reference":"Chu, R., W. Chen, S.H. Wang, F. King, and R.R. Fessler. 2004. Microstructure Dependence of Stress Corrosion Cracking Initiation in X-65 Pipeline Steel Exposed to a Near-Neutral pH Soil Environment. Corrosion. 60. pp. 275-283.","cited_authors":"Chu, R., W. Chen, S.H. Wang, F. King, and R.R. Fessler","cited_year":"2004","cited_title":"Microstructure Dependence of Stress Corrosion Cracking Initiation in X-65 Pipeline Steel Exposed to a Near-Neutral pH Soil Environment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943831,"raw_reference":"Danielson, M.J., R.H. Jones, and P. Dusek. 2001. Effect of Microstructure and Microchemistry on the SCC Behavior of Archival and Modern Pipeline Steels in a High pH Environment. NACE International Corrosion 2001. Paper 01211.","cited_authors":"Danielson, M.J., R.H. Jones, and P. Dusek","cited_year":"2001","cited_title":"Effect of Microstructure and Microchemistry on the SCC Behavior of Archival and Modern Pipeline Steels in a High pH Environment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943832,"raw_reference":"Danielson, M.J., R.H. Jones, and K. Krist. 2000. Effect of Microstructure and Microchemistry on the SCC Behavior of Pipeline Steels in a High pH Environment. NACE International Corrosion 2000. Paper 00359.","cited_authors":"Danielson, M.J., R.H. Jones, and K. Krist","cited_year":"2000","cited_title":"Effect of Microstructure and Microchemistry on the SCC Behavior of Pipeline Steels in a High pH Environment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943833,"raw_reference":"Delanty, B., and J. O’Beirne. 1992. Major Field Study Compares Pipeline SCC with Coatings. The Oil and Gas Journal. June 15. pp. 39-44.","cited_authors":"Delanty, B., and J. O’Beirne","cited_year":"1992","cited_title":"Major Field Study Compares Pipeline SCC with Coatings","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943834,"raw_reference":"Dupuis, B.R. 1998. The Canadian Energy Pipeline Association Stress Corrosion Cracking Database. In 1998 Proceedings of International Pipeline Conference. ASME. pp. 589-594.","cited_authors":"Dupuis, B.R","cited_year":"1998","cited_title":"The Canadian Energy Pipeline Association Stress Corrosion Cracking Database","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943835,"raw_reference":"Eiber, R.J. 1998. Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines. Report to PRCI on Project PR-3-9403.","cited_authors":"Eiber, R.J","cited_year":"1998","cited_title":"Protocol to Prioritize Sites for High pH Stress-Corrosion Cracking on Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943836,"raw_reference":"Elboujdaini, M., Y. Z. Wang, R.W. Revie, R.N. Parkins, and M.T. Shehata. 2000. Stress Corrosion Crack Initiation Processes: Pitting and Microcrack Coalescence. NACE International Corrosion 2000. Paper No. 00379.","cited_authors":"Elboujdaini, M., Y. Z. Wang, R.W. Revie, R.N. Parkins, and M.T. Shehata","cited_year":"2000","cited_title":"Stress Corrosion Crack Initiation Processes: Pitting and Microcrack Coalescence","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943837,"raw_reference":"Fessler, R.R. 1976. Combination of Conditions Causes Stress-Corrosion Cracking. The Oil and Gas Journal. Vol. 74. No. 7. pp.81-83.","cited_authors":"Fessler, R.R","cited_year":"1976","cited_title":"Combination of Conditions Causes Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943838,"raw_reference":"Fessler, R.R. 1979. Stress-Corrosion Cracking Temperature Effects. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. Catalogue No. L30175. pp. R-1 to R-10.","cited_authors":"Fessler, R.R","cited_year":"1979","cited_title":"Stress-Corrosion Cracking Temperature Effects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943839,"raw_reference":"Fessler, R.R., and T.J. Barlo. 1984. Threshold-Stress Determination Using Tapered Specimens and Cyclic Stresses. Environment-Sensitive Fracture: Evaluation and Comparison of Test Methods. ASTM STP 821. pp. 368-382. Page A-32 SCC_Report_FINAL_REPORT_w_","cited_authors":"Fessler, R.R., and T.J. Barlo","cited_year":"1984","cited_title":"Threshold-Stress Determination Using Tapered Specimens and Cyclic Stresses","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943840,"raw_reference":"Fessler, R.R., and K. Krist. 2000. Research Challenges Regarding Stress-Corrosion Cracking of Pipelines. NACE International Corrosion 2000. Paper No. 00370.","cited_authors":"Fessler, R.R., and K. Krist","cited_year":"2000","cited_title":"Research Challenges Regarding Stress-Corrosion Cracking of Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943841,"raw_reference":"Fessler, R.R., T. Groeneveld, and A. Elsea. 1973. Stress-Corrosion and Hydrogen-Stress Cracking in Buried Pipelines. International Conference on Stress Corrosion Cracking and Hydrogen Embrittlement of Iron Base Alloys. Unieux-Firminy. France. June. 1973. Published in Stress Corrosion Cracking and Hydrogen Embrittlement of Iron Base Alloys. NACE. 1977.","cited_authors":"Fessler, R.R., T. Groeneveld, and A. Elsea","cited_year":"1973","cited_title":"Stress-Corrosion and Hydrogen-Stress Cracking in Buried Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943842,"raw_reference":"McGary, and R.R. Fessler. 1982. A Study of Interrupted Cathodic Protection As It Relates to Stress-Corrosion Cracking and Corrosion of Buried Pipelines. NG-18 Report No. 127. Catalogue No. L51425.","cited_authors":"McGary, and R.R. Fessler","cited_year":"1982","cited_title":"A Study of Interrupted Cathodic Protection As It Relates to Stress-Corrosion Cracking and Corrosion of Buried Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943843,"raw_reference":"Foroulis, Z., and H. Uhlig. 1964. Effect of Cold-Work on Corrosion of Iron and Steel in Hydrochloric Acid. Journal of Electrochemistry Society. Vol. 111. pp. 522-528.","cited_authors":"Foroulis, Z., and H. Uhlig","cited_year":"1964","cited_title":"Effect of Cold-Work on Corrosion of Iron and Steel in Hydrochloric Acid","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943844,"raw_reference":"Harle, B.A., J.A. Beavers, and C.E. Jaske. 1994. Low-pH Stress Corrosion Cracking of Natural Gas Pipelines. NACE International Corrosion 94. Paper No. 242.","cited_authors":"Harle, B.A., J.A. Beavers, and C.E. Jaske","cited_year":"1994","cited_title":"Low-pH Stress Corrosion Cracking of Natural Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943845,"raw_reference":"Hunt, C.P. 1988. The Effect of Impurities on the Intergranular Stress Corrosion Cracking of a C/Mn Steel. Corrosion Science. 28. pp. 901-922.","cited_authors":"Hunt, C.P","cited_year":"1988","cited_title":"The Effect of Impurities on the Intergranular Stress Corrosion Cracking of a C/Mn Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943846,"raw_reference":"Jack, T.R., B. Erno, K. Krist, and R.R. Fessler. 2000. Generation of Near Neutral pH and High pH SCC Environments on Buried Pipelines. NACE International Corrosion 2000. Paper No. 00362.","cited_authors":"Jack, T.R., B. Erno, K. Krist, and R.R. Fessler","cited_year":"2000","cited_title":"Generation of Near Neutral pH and High pH SCC Environments on Buried Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943847,"raw_reference":"Jack, T.R., G. Van Boven, M. Wilmott, and R.L. Sutherby. 1994. Parameters Affecting the Growth of Low pH Stress Corrosion Cracking of Pipeline Steels. In Proceedings of NACE Western Regional Conference. Calgary. AB. pp. 504-526.","cited_authors":"Jack, T.R., G. Van Boven, M. Wilmott, and R.L. Sutherby","cited_year":"1994","cited_title":"Parameters Affecting the Growth of Low pH Stress Corrosion Cracking of Pipeline Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943848,"raw_reference":"Dusek. 2001. Development of Predictive Model for the Initiation and Early-Stage Growth of Near-Neutral pH SCC of Pipeline Steels. NACE International Corrosion 2001. Paper 01214.","cited_authors":"Dusek","cited_year":"2001","cited_title":"Development of Predictive Model for the Initiation and Early-Stage Growth of Near-Neutral pH SCC of Pipeline Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943849,"raw_reference":"Krishnamurthy, R.M., R.W. MacDonald, and P.M. Marreck. 1996. Stress Corrosion Cracking of a Liquid Transmission Line. In 1996 Proceedings of International Pipeline Conference. ASME. pp. 495-506.","cited_authors":"Krishnamurthy, R.M., R.W. MacDonald, and P.M. Marreck","cited_year":"1996","cited_title":"Stress Corrosion Cracking of a Liquid Transmission Line","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943850,"raw_reference":"Krishnamurthy, R.M., B. Martens, S. Feser, P. Marreck, and R. MacDonald. 2000. Liquid Pipeline Stress Corrosion Cracking. In 2000 Proceedings of International Pipeline Conference.","cited_authors":"Krishnamurthy, R.M., B. Martens, S. Feser, P. Marreck, and R. MacDonald","cited_year":"2000","cited_title":"Liquid Pipeline Stress Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943851,"raw_reference":"ASME. pp. 1439-1449. Kushida, T., K. Nose, H. Asahi, M. Kimura, Y. Yamane, S. Endo, and H. Kawano. 2001. Effects of Metallurgical Factors and Test Conditions on Near Neutral pH SCC of Pipeline Steels.","cited_authors":"ASME. pp. 1439-1449. Kushida, T., K. Nose, H. Asahi, M. Kimura, Y. Yamane, S. Endo, and H. Kawano","cited_year":"2001","cited_title":"Effects of Metallurgical Factors and Test Conditions on Near Neutral pH SCC of Pipeline Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943852,"raw_reference":"NACE International Corrosion 2001. Paper No. 01213. Page A-33 SCC_Report_FINAL_REPORT_w_","cited_authors":"NACE International Corrosion","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943853,"raw_reference":"Lambert, S.B., J.A. Beavers, B. Delanty, R. Sutherby, and A. Plumtree. 2000. Mechanical Factors Affecting Stress Corrosion Crack Growth Rates in Buried Pipelines. In 2000 Proceedings of International Pipeline Conference. ASME. pp. 961-966.","cited_authors":"Lambert, S.B., J.A. Beavers, B. Delanty, R. Sutherby, and A. Plumtree","cited_year":"2000","cited_title":"Mechanical Factors Affecting Stress Corrosion Crack Growth Rates in Buried Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943854,"raw_reference":"Leis, B.N. 1995. Characterization of Axial Flaws in Pipelines, with a Focus on Stress-Corrosion Cracking. Volume I: Summary. NG-18 Report No. 212.","cited_authors":"Leis, B.N","cited_year":"1995","cited_title":"Characterization of Axial Flaws in Pipelines, with a Focus on Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943855,"raw_reference":"Leis, B.N. 1997. Validation of a High pH Stress-Corrosion Cracking Life Prediction Model (SCCLPM) for Gas-Transmission Pipelines. Report to PRCI on Project PR-3-9531.","cited_authors":"Leis, B.N","cited_year":"1997","cited_title":"Validation of a High pH Stress-Corrosion Cracking Life Prediction Model (SCCLPM) for Gas-Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943856,"raw_reference":"Leis, B.N., and R.E. Kurth. 1999. Hydrotest Parameters to Help Control High pH SCC on Gas Transmission Pipelines. Final Report to PRCI on Project PR-3-9404.","cited_authors":"Leis, B.N., and R.E. Kurth","cited_year":"1999","cited_title":"Hydrotest Parameters to Help Control High pH SCC on Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943857,"raw_reference":"Leis, B.N., and R.N. Parkins. 1993. Modeling Stress-Corrosion Cracking of High-Pressure Gas Pipelines. In Proceedings from the Eighth Symposium on Line Pipe Research. PRCI. Catalogue No. L51680. pp. 19-1 to 19-24.","cited_authors":"Leis, B.N., and R.N. Parkins","cited_year":"1993","cited_title":"Modeling Stress-Corrosion Cracking of High-Pressure Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943858,"raw_reference":"Leis, B.N., and R.N. Parkins. 1998. Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking. Fatigue and Fracture of Eng. Materials and Structures. 21. (1998) to be published.","cited_authors":"Leis, B.N., and R.N. Parkins","cited_year":"1998","cited_title":"Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943859,"raw_reference":"Leis, B.N., T. Forte, and N.D. Ghadiali. 1995. Stress-Corrosion Cracking Life Prediction Model – SCCLPM: Users Manual and Software. Version 1.0. NG-18 Report No. 217. PRCI. Catalogue No. L51808.","cited_authors":"Leis, B.N., T. Forte, and N.D. Ghadiali","cited_year":"1995","cited_title":"Stress-Corrosion Cracking Life Prediction Model – SCCLPM: Users Manual and Software","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943860,"raw_reference":"Mao, S.X., J.L. Luo, B. Gu, and W. Yu. 1998. Hydrogen Facilitated Anodic Dissolution Type Stress Corrosion Cracking of Pipeline Steels in Coating Disbondment Chemistry. In 1998 Proceedings of International Pipeline Conference. ASME. pp. 485-492.","cited_authors":"Mao, S.X., J.L. Luo, B. Gu, and W. Yu","cited_year":"1998","cited_title":"Hydrogen Facilitated Anodic Dissolution Type Stress Corrosion Cracking of Pipeline Steels in Coating Disbondment Chemistry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943861,"raw_reference":"Marshall, C.W. 1984. Kinetics of Stress-Corrosion Cracking in Pipe Steels at 175F. NG-18 Report No. 143. Catalogue No. L51464.","cited_authors":"Marshall, C.W","cited_year":"1984","cited_title":"Kinetics of Stress-Corrosion Cracking in Pipe Steels at 175F. NG-18 Report No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943862,"raw_reference":"Martinez, F.H., and S.W. Stafford. 1994. EPNG Develops Model to Predict Potential Locations for SCC. Pipeline Industry. July 1994. pp. 29-33","cited_authors":"Martinez, F.H., and S.W. Stafford","cited_year":"1994","cited_title":"EPNG Develops Model to Predict Potential Locations for SCC. Pipeline Industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943863,"raw_reference":"Mercer, W.L. 1979. Stress Corrosion Cracking – Control Through Understanding. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. Catalogue No. L30175.","cited_authors":"Mercer, W.L","cited_year":"1979","cited_title":"Stress Corrosion Cracking – Control Through Understanding","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943864,"raw_reference":"Meyer, M., and M. Pontremoli. 2001. Comparing of Laboratory Behaviour of Different Pipeline Steels Regarding Their Near-Neutral SCC Susceptibility. PRCI-EPRG Joint Technical Meeting. New Orleans. Paper 20. May 2001.","cited_authors":"Meyer, M., and M. Pontremoli","cited_year":"2001","cited_title":"Comparing of Laboratory Behaviour of Different Pipeline Steels Regarding Their Near-Neutral SCC Susceptibility","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943865,"raw_reference":"Meyer, M., L. Scoppio, B. Rudd, E. Lo Piccolo, S. Matthews, and J.P. Jansen. 2003. NearNeutral pH SCC Resistance of Pipeline Steels: Effect of Some Material and Mechanical Parameters (EPRG-Report). EPRG/PRCI 14th Biennial Joint Technical Meeting on Pipeline Research. Berlin. pp. 5-1 to 5-21.","cited_authors":"Meyer, M., L. Scoppio, B. Rudd, E. Lo Piccolo, S. Matthews, and J.P. Jansen","cited_year":"2003","cited_title":"NearNeutral pH SCC Resistance of Pipeline Steels: Effect of Some Material and Mechanical Parameters (EPRG-Report)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943866,"raw_reference":"NEB. 1996. Public Inquiry Concerning Stress Corrosion Cracking on Canadian Oil and Gas Pipelines. by Canadian National Energy Board. November. 1996. Page A-34 SCC_Report_FINAL_REPORT_w_","cited_authors":"NEB","cited_year":"1996","cited_title":"Public Inquiry Concerning Stress Corrosion Cracking on Canadian Oil and Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943867,"raw_reference":"Oriani, R.A., and P.H. Josephic. 1981. The Effects of Hydrogen on the Room-Temperature Creep of Spheroidized 1040-Steel. Acta Metallurgica. Vol. 29. p. 669.","cited_authors":"Oriani, R.A., and P.H. Josephic","cited_year":"1981","cited_title":"The Effects of Hydrogen on the Room-Temperature Creep of Spheroidized 1040-Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943868,"raw_reference":"Parkins, R.N. 1979. Stress-Corrosion Cracking Strain Aging Effects. In Proceedings from the 6th Symposium on Line Pipe Research. PRCI. Catalogue No. L30175.","cited_authors":"Parkins, R.N","cited_year":"1979","cited_title":"Stress-Corrosion Cracking Strain Aging Effects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943869,"raw_reference":"Parkins, R.N. 1987. Factors Influencing Stress Corrosion Crack Growth Kinetics. Corrosion. Vol. 43. pp. 130-138.","cited_authors":"Parkins, R.N","cited_year":"1987","cited_title":"Factors Influencing Stress Corrosion Crack Growth Kinetics","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943870,"raw_reference":"Parkins, R.N. 1988. Localized Corrosion and Crack Initiation. Material Science Engineering A. 103(1). pp. 143-156.","cited_authors":"Parkins, R.N","cited_year":"1988","cited_title":"Localized Corrosion and Crack Initiation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943871,"raw_reference":"Parkins, R.N. 1994. Overview of Intergranular Stress Corrosion Cracking Research Activities. Report on PR-232-9401 to PRCI. Catalogue No. L51719.","cited_authors":"Parkins, R.N","cited_year":"1994","cited_title":"Overview of Intergranular Stress Corrosion Cracking Research Activities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943872,"raw_reference":"Parkins, R.N. 1998. The Influence of Hydrogen on Crack Growth in Pipelines. In Materials for Resource Recovery and Transport. L. Collins, ed. The Metallurgical Society of CIM. pp. 35-49.","cited_authors":"Parkins, R.N","cited_year":"1998","cited_title":"The Influence of Hydrogen on Crack Growth in Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943873,"raw_reference":"Parkins, R.N. 1999. The Involvement of Hydrogen in Low pH Stress Corrosion Cracking of Pipeline Steels. Presented at PRCI/EPRG Meeting. Groningen, The Netherlands. May 17-21, 1999.","cited_authors":"Parkins, R.N","cited_year":"1999","cited_title":"The Involvement of Hydrogen in Low pH Stress Corrosion Cracking of Pipeline Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943874,"raw_reference":"Parkins, R.N. 2000. A Review of Stress Corrosion Cracking of High Pressure Gas Pipelines.","cited_authors":"Parkins, R.N","cited_year":"2000","cited_title":"A Review of Stress Corrosion Cracking of High Pressure Gas Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943875,"raw_reference":"NACE International Corrosion 2000. Paper No. 00363.","cited_authors":"NACE International Corrosion","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943876,"raw_reference":"Parkins, R.N. 2002. Some Effects of Strain Rate on the Transgranular Stress Corrosion Cracking of Ferritic Steels in Dilute Near-Neutral pH Solutions. Topical Report submitted to PRCI.","cited_authors":"Parkins, R.N","cited_year":"2002","cited_title":"Some Effects of Strain Rate on the Transgranular Stress Corrosion Cracking of Ferritic Steels in Dilute Near-Neutral pH Solutions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943877,"raw_reference":"Parkins, R.N., and B.S. Delanty. 1996. The Initiation and Early Stages of Growth of Stress Corrosion Cracks in Pipeline Steel Exposed to a Dilute Near-Neutral pH Solution. In Proceedings from the Ninth Symposium on Pipeline Research. PRCI. Catalogue No. L51746. pp. 19-1 to 19-14.","cited_authors":"Parkins, R.N., and B.S. Delanty","cited_year":"1996","cited_title":"The Initiation and Early Stages of Growth of Stress Corrosion Cracks in Pipeline Steel Exposed to a Dilute Near-Neutral pH Solution","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943878,"raw_reference":"Parkins, R.N., and R.R. Fessler. 1978. Stress Corrosion Cracking of High-Pressure Gas Transmission Pipelines. In Materials in Engineering Applications. Vol. 1. No. 2. pp. 80-96.","cited_authors":"Parkins, R.N., and R.R. Fessler","cited_year":"1978","cited_title":"Stress Corrosion Cracking of High-Pressure Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943879,"raw_reference":"Parkins, R.N., and R.R. Fessler. 1986. Line Pipe Stress Corrosion Cracking – Mechanisms and Remedies. NACE Corrosion 86. Paper No. 320.","cited_authors":"Parkins, R.N., and R.R. Fessler","cited_year":"1986","cited_title":"Line Pipe Stress Corrosion Cracking – Mechanisms and Remedies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943880,"raw_reference":"Parkins, R.N., and S. Zhou. 1997. The Stress Corrosion Cracking of C-Mn Steel in CO2-HCO3 ¯CO32¯ Solutions I: Stress Corrosion Data. Corrosion Science. Vol. 39. pp. 159-173.","cited_authors":"Parkins, R.N., and S. Zhou","cited_year":"1997","cited_title":"The Stress Corrosion Cracking of C-Mn Steel in CO2-HCO3 ¯CO32¯ Solutions I: Stress Corrosion Data","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943881,"raw_reference":"Parkins, R.N., E. Belhimer, and W.K. Blanchard Jr. 1993. Stress Corrosion Cracking Characteristics of a Range of Pipeline Steels in Carbonate-Bicarbonate Solutions. Corrosion. Vol. 49. pp. 951-966.","cited_authors":"Parkins, R.N., E. Belhimer, and W.K. Blanchard Jr","cited_year":"1993","cited_title":"Stress Corrosion Cracking Characteristics of a Range of Pipeline Steels in Carbonate-Bicarbonate Solutions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943882,"raw_reference":"Parkins, R.N., W.K. Blanchard Jr., and B.S. Delanty. 1994. Transgranular Stress Corrosion Cracking of High-Pressure Pipelines in Contact with Solutions of Near Neutral pH. Corrosion. Vol. 50. pp. 394-408.","cited_authors":"Parkins, R.N., W.K. Blanchard Jr., and B.S. Delanty","cited_year":"1994","cited_title":"Transgranular Stress Corrosion Cracking of High-Pressure Pipelines in Contact with Solutions of Near Neutral pH. Corrosion","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943883,"raw_reference":"Parkins, R.N., P.W. Slattery, and P.S. Poulson. 1981. The Effects of Alloying Additions to Ferritic Steels upon Stress Corrosion Cracking Resistance. Corrosion. 37. pp. 650-664. Page A-35 SCC_Report_FINAL_REPORT_w_","cited_authors":"Parkins, R.N., P.W. Slattery, and P.S. Poulson","cited_year":"1981","cited_title":"The Effects of Alloying Additions to Ferritic Steels upon Stress Corrosion Cracking Resistance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943884,"raw_reference":"Tyson, W. 1979. Hydrogen in Metals. Canadian Metallurgical Quarterly. Vol. 18. pp. 1-11.","cited_authors":"Tyson, W","cited_year":"1979","cited_title":"Hydrogen in Metals","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943885,"raw_reference":"Uhlig, H. 1976. Effect of Surface Dissolution on Plastic Deformation of Iron and Steel. Journal of Electrochemistry Society. Vol. 123. pp. 1699-1701.","cited_authors":"Uhlig, H","cited_year":"1976","cited_title":"Effect of Surface Dissolution on Plastic Deformation of Iron and Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943886,"raw_reference":"Wang, J.Q., A. Atrens, and D.R.G. Mitchell. 2001. Grain Boundary Characterization of X42 Pipeline Steel in Relation to IGSCC. NACE International Corrosion 2001. Paper No. 01210.","cited_authors":"Wang, J.Q., A. Atrens, and D.R.G. Mitchell","cited_year":"2001","cited_title":"Grain Boundary Characterization of X42 Pipeline Steel in Relation to IGSCC. NACE International Corrosion 2001","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943887,"raw_reference":"Wang, S.H., W. Chen, T. Jack, F. King, R.R. Fessler, and K. Krist. 2000. Role of Prior Cyclic Loading in the Initiation of Stress-Corrosion Cracks in Pipeline Steels Exposed to Near-Neutral pH Environment. In Proceedings of 2000 International Pipeline Conference. ASME. pp. 10051009.","cited_authors":"Wang, S.H., W. Chen, T. Jack, F. King, R.R. Fessler, and K. Krist","cited_year":"2000","cited_title":"Role of Prior Cyclic Loading in the Initiation of Stress-Corrosion Cracks in Pipeline Steels Exposed to Near-Neutral pH Environment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943888,"raw_reference":"Wells, D.B. 1993. SCC Threshold Stress in Line Pipe Steels. In Proceedings from the Eighth Symposium on Line Pipe Research. PRCI. Catalogue No. L51680. pp. 18-1 to 18-15.","cited_authors":"Wells, D.B","cited_year":"1993","cited_title":"SCC Threshold Stress in Line Pipe Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943889,"raw_reference":"Zhang, B., J. Fan, Y. Gogotsi, A. Chudnovsky, and A. Teitsma. 2000. Theoretical and Experimental Study of Stress Corrosion Cracking of Pipeline Steel in Near Neutral pH Environments. In Proceedings of 2000 International Pipeline Conference. ASME. pp. 10131020.","cited_authors":"Zhang, B., J. Fan, Y. Gogotsi, A. Chudnovsky, and A. Teitsma","cited_year":"2000","cited_title":"Theoretical and Experimental Study of Stress Corrosion Cracking of Pipeline Steel in Near Neutral pH Environments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943890,"raw_reference":"Zhang, X.Y., S.B. Lambert, R. Sutherby, and A. Plumtree. 1999. Transgranular Stress Corrosion Cracking of X-60 Pipeline Steel in Simulated Ground Water. Corrosion. Vol. 55. pp. 297-305. Page A-36 SCC_Report_FINAL_REPORT_w_","cited_authors":"Zhang, X.Y., S.B. Lambert, R. Sutherby, and A. Plumtree","cited_year":"1999","cited_title":"Transgranular Stress Corrosion Cracking of X-60 Pipeline Steel in Simulated Ground Water","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943891,"raw_reference":"DB.doc 2/3/2005 Michael Baker Jr., Inc. OPS TTO8 – Stress Corrosion Cracking Study Attachment A – Operator Questionnaire SCC_Report_FINAL_REPORT_w_","cited_authors":null,"cited_year":null,"cited_title":"DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943892,"raw_reference":"DB.doc 2/3/2005 Michael Baker Jr., Inc. OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. SCC_Report_FINAL_REPORT_w_","cited_authors":null,"cited_year":null,"cited_title":"DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943893,"raw_reference":"DB.doc 2/3/2005 Michael Baker Jr., Inc. OPS TTO8 – Stress Corrosion Cracking Study This page intentionally left blank. Attachment A – Page 2 SCC_Report_FINAL_REPORT_w_","cited_authors":null,"cited_year":null,"cited_title":"DB.doc 2/3/2005 Michael Baker Jr., Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943894,"raw_reference":"Winkler, R. L., 1972, Introduction to Bayesian Inference and Decision, Holt, Rinehart & Winston, Inc., New York","cited_authors":"Winkler, R. L","cited_year":"1972","cited_title":"Introduction to Bayesian Inference and Decision, Holt, Rinehart & Winston, Inc., New York","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":943895,"raw_reference":"Harper, W.V., and K. Majidzadeh, „Stochastic Optimization of a Network Level Bridge Management System“, Proceedings of the Sixth Conference of the Road Engineering Association of Asia and Australia, Volume 3, March 4-10, 1990, Kuala Lumpur, Malaysia. IPC2016-64348 (Susceptibility of Stress Corrosion Cracking in Liquid and Gas Pipelines) Authors Table 12: Trends in Cracking Likelihood","cited_authors":"Harper, W.V., and K. Majidzadeh, „Stochastic Optimization of a Network Level Bridge Management System“, Proceedings of the Sixth Conference of the Road Engineering Association of Asia and Australia, Volume 3, March 4-10","cited_year":"1990","cited_title":"Kuala Lumpur, Malaysia","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}