Husky Energy Refinery Explosion and Fire
Other documents for the same rulemaking (all, by stage)
References: 63 extracted, 0 linked to papers
[199] K. Study, P. Allan, A. Cozat, K. Meliefste, E. Roche and T. Wagner, "Good Till the Last Drop: How Much is Too Much Valve Leakage?," Wiley Online Library, 2015.
[200] TapcoEnpro, "FCCU Fractionator Isolation Valves," [Online]. Available: https://www.tapcoenpro.com/fccu-isolation-valves/. [Accessed 6 December 2022].
[201] Merriam-Webster.com Dictionary, "Ignite," [Online]. Available: https://www.merriam-webster.com/dictionary/ignite. [Accessed 9 December 2022]. Investigation Report
[202] Koch-Glitsch, "About | Koch-Glitsch," [Online]. Available: https://koch-glitsch.com/about. [Accessed 13 December 2022].
[203] Turbomachinery International Magazine, "Centrifugal vs reciprocating compressor," [Online]. Available: https://www.turbomachinerymag.com/centrifugal-vs-reciprocating-compressor/. [Accessed 8 May 2020]. Investigation Report Appendix A—Causal Analysis (AcciMap) Investigation Report Investigation Report Investigation Report Appendix B—Timeline Husky Superior Refinery History Prior to Incident 1950 Lake Superior Refining Company refinery built
[11] 1958 Murphy Oil acquires Husky Superior Refinery
OSHA promulgates Process Safety Management standarda Early 1990s Operations department converts operating procedures from paper to digital format; creates and rewrites new procedures as needed. 1998 Superior Plant Facility Siting Study 2006 Tank fire plans created 2007-2008
OSHA National Emphasis Program inspection of Husky Superior Refinery 2009 Facility Siting Study 2011 Calumet acquires Husky Superior Refinery
[16] 2013 Refinery PSM and RMP compliance audit 2016 Refinery PSM and RMP compliance audit 2017 Indirect subsidiary of Husky Energy acquires Husky Superior Refinery [17]
FCC Unit History 1960 FCC unit designed 1961
FCC unit constructed 1963 Turnaround and equipment inspections 1964 Turnaround and equipment inspections 1966 Turnaround and equipment inspections 1967
ASTM withdraws A-212 and A-201 specifications [142, p. 461] 1968 Turnaround and equipment inspections 1970 Turnaround and equipment inspections 1972 Turnaround and equipment inspections 1974 Turnaround and equipment inspections 1975 Turnaround and equipment inspections
[Online]. Available: https://royalsocietypublishing.org/doi/10.1098/rsta.2014.0126.