{"document":{"doc_id":139363,"source":"docket_item","org":"EPA","doc_type":"report","title":"McGrath Cleaning Up","date":"2026-04-13","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2020-0107-1396","source_native_id":"EPA-HQ-OLEM-2020-0107-1396","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2020-0107"],"rins":["RIN 2050-AH39","RIN 2050-AH14","RIN 2050-AH36"],"related":[{"doc_id":128985,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; ANPRM cleared by the Office of Management and Budget on September 18, 2020","date":"2020-10-14"},{"doc_id":128986,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; ANPRM submitted to the Office of Management and Budget on July 23, 2020","date":"2020-10-14"},{"doc_id":77724,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2020-10-14"},{"doc_id":7149,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Proposed Rule CCR Legacy Rule RIA","date":"2023-05-18"},{"doc_id":7164,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 6, 2023","date":"2023-05-18"},{"doc_id":7173,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft RIA cleared by OMB 050423","date":"2023-05-18"},{"doc_id":128181,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; Proposed Rule submitted to the Office of Management and Budget on March 6, 2023","date":"2023-05-18"},{"doc_id":128182,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft Proposed Rule cleared by OMB 050423","date":"2023-05-18"},{"doc_id":77710,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2023-05-18"},{"doc_id":77697,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2023-11-14"},{"doc_id":7141,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Legacy CCR Surface Impoundments. April 2024","date":"2024-05-08"},{"doc_id":7155,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft RIA Redline cleared by OMB April 22, 2024","date":"2024-05-08"},{"doc_id":7158,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 15, 2024","date":"2024-05-08"},{"doc_id":127726,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Draft Final Rule Redline cleared by OMB April 22, 2024","date":"2024-05-08"},{"doc_id":127727,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; Risk Assessment Redline cleared by OMB April 22, 2024","date":"2024-05-08"},{"doc_id":127728,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft; Final Rule submitted to the Office of Management and Budget on March 15, 2024","date":"2024-05-08"},{"doc_id":77701,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments","date":"2024-05-08"},{"doc_id":7169,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Regulatory Economic Assessment; Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; CCR Management Unit Deadline Extension Rule","date":"2025-07-22"},{"doc_id":83074,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule","date":"2025-07-22"},{"doc_id":83077,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule","date":"2025-07-22"},{"doc_id":82616,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule; Reopening of Comment Period and Public Hearing","date":"2025-09-04"},{"doc_id":82618,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule; Withdrawal of Direct Final Rule","date":"2025-09-04"},{"doc_id":7137,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis: Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; CCR Management Unit Deadline Extension Rule","date":"2026-02-10"},{"doc_id":7161,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"Executive Order 12866 Review Draft - Regulatory Impact Analysis (RIA); redline cleared by OMB on January 30, 2026","date":"2026-02-10"},{"doc_id":127388,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Executive Order 12866 Review Draft - Final rule preamble and regulatory text; redline cleared by OMB on January 30, 2026","date":"2026-02-10"},{"doc_id":82592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule","date":"2026-02-10"},{"doc_id":2888,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy/CCRMU Amendments","date":"2026-04-13"},{"doc_id":139364,"source":"docket_item","org":"EPA","doc_type":"report","title":"FHWA Fly Ash Facts","date":"2026-04-13"},{"doc_id":139365,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EPA (2005) Guidelines for Carcinogenic Risk Assessment","date":"2026-04-13"},{"doc_id":139366,"source":"docket_item","org":"EPA","doc_type":"data","title":"TVA - John Sevier Groundwater Monitoring fact sheet 2025-05","date":"2026-04-13"},{"doc_id":139367,"source":"docket_item","org":"EPA","doc_type":"report","title":"Indiana-Kentucky Electric Corp - Clifty Creek Initial Cert Statement Bottom Ash Transport Water 2021-10-15","date":"2026-04-13"},{"doc_id":139368,"source":"docket_item","org":"EPA","doc_type":"report","title":"ASTSWMO 2021 BU of Fill-Like Materials Survey Report","date":"2026-04-13"},{"doc_id":139369,"source":"docket_item","org":"EPA","doc_type":"report","title":"Green Building Council","date":"2026-04-13"},{"doc_id":139370,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waldman et al. CLF Material","date":"2026-04-13"},{"doc_id":139371,"source":"docket_item","org":"EPA","doc_type":"report","title":"TVA - Allen Fossil West Ash Corrective Action Risk Assessment Plan Draft 2025-02-13","date":"2026-04-13"},{"doc_id":139372,"source":"docket_item","org":"EPA","doc_type":"data","title":"TVA - Kingston 5 things to know CCC environmental study 2023-05","date":"2026-04-13"},{"doc_id":139373,"source":"docket_item","org":"EPA","doc_type":"report","title":"Georgia Plant Karft Grumman Hydrogeologic Assessment Report Pages 26-50 2023-04","date":"2026-04-13"},{"doc_id":139375,"source":"docket_item","org":"EPA","doc_type":"report","title":"Ramanathan etal Com","date":"2026-04-13"},{"doc_id":139376,"source":"docket_item","org":"EPA","doc_type":"report","title":"Damage Incidents Related to CCR Structural Fills","date":"2026-04-13"},{"doc_id":139377,"source":"docket_item","org":"EPA","doc_type":"report","title":"Thomas et al. Reactivity","date":"2026-04-13"},{"doc_id":139378,"source":"docket_item","org":"EPA","doc_type":"report","title":"Haley Aldrich - Report on Joint Data Analysis and Risk Modeling 2025-09-29","date":"2026-04-13"},{"doc_id":139379,"source":"docket_item","org":"EPA","doc_type":"report","title":"Haley Aldrich - Report on Joint Data Analysis Appendices 2025-09-29","date":"2026-04-13"},{"doc_id":139380,"source":"docket_item","org":"EPA","doc_type":"report","title":"Ajwad (2023) Concrete Evolution 2023","date":"2026-04-13"},{"doc_id":139381,"source":"docket_item","org":"EPA","doc_type":"report","title":"Xcel - Beneficial Use Case Studies 2025","date":"2026-04-13"},{"doc_id":139382,"source":"docket_item","org":"EPA","doc_type":"report","title":"Georgia Grumman Road Landfill Draft Remedy Selection Report Part 2 2025-08","date":"2026-04-13"},{"doc_id":139383,"source":"docket_item","org":"EPA","doc_type":"report","title":"ASTSWMO 2012 CCR BU Survey Report","date":"2026-04-13"},{"doc_id":139384,"source":"docket_item","org":"EPA","doc_type":"report","title":"Hrach Fly ash Recla","date":"2026-04-13"},{"doc_id":139385,"source":"docket_item","org":"EPA","doc_type":"other","title":"TVA - TDEC Order Environmental Assessment Process fact sheet 2024-09","date":"2026-04-13"},{"doc_id":139386,"source":"docket_item","org":"EPA","doc_type":"report","title":"Xcel - Risk Based Site Specific Examples Cover Letter and Catch All Solution 2025","date":"2026-04-13"},{"doc_id":139387,"source":"docket_item","org":"EPA","doc_type":"report","title":"Georgia Grumman Road Landfill Draft Remedy Selection Report Part 1 2025-08","date":"2026-04-13"},{"doc_id":139388,"source":"docket_item","org":"EPA","doc_type":"report","title":"Georgia Plant Karft Grumman Hydrogeologic Assessment Report Pages 1-25 2023-04","date":"2026-04-13"},{"doc_id":139389,"source":"docket_item","org":"EPA","doc_type":"report","title":"ACAA CCP Survey Results 2000-2023","date":"2026-04-13"},{"doc_id":139390,"source":"docket_item","org":"EPA","doc_type":"report","title":"Duke Energy Phase 2","date":"2026-04-13"},{"doc_id":139391,"source":"docket_item","org":"EPA","doc_type":"publication","title":"U.S. EPA (1991) Guidelines for Developmental Toxicity Risk Assessment","date":"2026-04-13"},{"doc_id":139392,"source":"docket_item","org":"EPA","doc_type":"other","title":"TVA - John Sevier Fossil Plant Environmental Assessment Report Executive Summary","date":"2026-04-13"},{"doc_id":139393,"source":"docket_item","org":"EPA","doc_type":"report","title":"NCDEQ -Coal Ash Management Act Annual Report 2025-10-01","date":"2026-04-13"},{"doc_id":139401,"source":"docket_item","org":"EPA","doc_type":"data","title":"Memorandum to Docket - USWAG Gradient CCRMU Fill Input and Output Files","date":"2026-04-13"},{"doc_id":139402,"source":"docket_item","org":"EPA","doc_type":"report","title":"Georgia Plant Karft Grumman Hydrogeologic Assessment Report Pages 76-106 2023-04","date":"2026-04-13"},{"doc_id":139403,"source":"docket_item","org":"EPA","doc_type":"report","title":"The Use of Ternary Mixtures in Concrete","date":"2026-04-13"},{"doc_id":139404,"source":"docket_item","org":"EPA","doc_type":"report","title":"Arizona Public Service - Four Corners Upper Retention Sump Closure Plan 2025-12-17","date":"2026-04-13"}],"references":[{"citation_id":881134,"raw_reference":"Direct, indirect, and total impacts were all quantified for a specified region surrounding each power plant. 10. Direct jobs and income refer to jobs needed specifically for the project and the income generated from those jobs. Total jobs and income refer to the combination of these direct impacts along with indirect and induced impacts (additional jobs and wages created in the community due to the increased spending associated with the closure project, etc.). Values may not sum to totals due to rounding. 19. See “Harm to Human Health from Breathing and Ingesting Coal Ash Toxicants,” https://earthjustice.org/sites/default/ files/files/coal-ash-man_COMPLETE_2017-07-20_light.pdf 20. See fn 17, supra. News. Retrieved from: https://www.eenews.net/ stories/1060099817 21. 40 C.F.R. § 257.102(d). 32. South Carolina Department of Employment and Workforce (2012). “State of Workforce Report: Putting South Carolinians back to work.” South Carolina Department of Employment and Workforce Labor Market Information Division. P.7 retrieved from: http://lmi.dew.sc.gov/lmi%20 site/Documents/StateOfWorkforceReport.pdf","cited_authors":"Direct, indirect, and total impacts were all quantified for a specified region surrounding each power plant. 10. Direct jobs and income refer to jobs needed specifically for the project and the income generated from those jobs. Total jobs and income refer to the combination of these direct impacts along with indirect and induced impacts (additional jobs and wages created in the community due to the increased spending associated with the closure project, etc.). Values may not sum to totals due to rounding. 19. See “Harm to Human Health from Breathing and Ingesting Coal Ash Toxicants,” https://earthjustice.org/sites/default/ files/files/coal-ash-man_COMPLETE_2017-07-20_light.pdf 20. See fn 17, supra. News. Retrieved from: https://www.eenews.net/ stories/1060099817 21. 40 C.F.R. § 257.102(d). 32. South Carolina Department of Employment and Workforce","cited_year":"2012","cited_title":"State of Workforce Report: Putting South Carolinians back to work","cited_venue":null,"cited_doi":null,"cited_url":"https://earthjustice.org/sites/default/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881135,"raw_reference":"22. Gheorghiu, I. (2019, Aug 7). Virginia rejects Dominion bid to recover environmental spending on coal units slated for shutdown. Utility Dive. Retrieved from: https://www. utilitydive.com/news/virginia-rejects-dominion-bid-torecoverenvironmental-spending-on-coal-uni/560374/","cited_authors":"22. Gheorghiu, I","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881136,"raw_reference":"23. Weinstein, A. (2021, Jan 25). Duke Energy customers to save $1.1 billion in settlement over coal ash cleanup costs. Charlotte Observer. Retrieved from: https://www. charlotteobserver.com/news/business/article248745190. html#:~:text=Duke%20Energy%20agreed%20to%20 a,much%20of%20the%20cleanup%20costs 33. Ibid. 34. Low-income population is defined as individuals in households where the household income is less than or equal to twice the federal poverty level. Demographic estimates were generated using the 2012-2016 American Community Survey (ACS) from the U.S. Census Bureau, available in EPA’s EJSCREEN Standard Reports. EJSCREEN was designed in the context of EPA’s environmental justice policies and is a screening tool that can help identify areas that may warrant additional consideration, analysis, assistance and outreach. 24. Earthjustice (2019, June 30). Milestone Bill to Clean Up Coal Ash Pollution in Illinois Becomes Law. Retrieved from: https://earthjustice.org/news/press/2019/milestone-billto-clean-up-coal-ash-pollution-in-illinois-becomes-law","cited_authors":"23. Weinstein, A","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881137,"raw_reference":"25. IMPLAN. 2020. “Application”. Available at: https://www. implan.com/application/","cited_authors":"25. IMPLAN","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881138,"raw_reference":"35. Ellis, C. (2018, July 13). Southeast river runs part 5: Coal ash on the Waccamaw River. Southern Alliance for Clean Energy. Retrieved from: https://cleanenergy.org/blog/ southeast-river-runs-part-5-coal-ash-on-the-waccamawriver/ 26. The Colstrip economic analysis was originally conducted by Bioeconomics using the IMPLAN model. AEC reviewed these results as well for this report. 27. Applied Economics Clinic conducted the economic analysis for the Grainger and Michigan City sites. For Colstrip, this report cites data provided by the POWER Cleanup Jobs Study Research funded through the POWER grant awarded to the Montana Department of Labor and Industry. For the POWER research, KirK engineering conducted the engineering analysis and Bioeconomics conducted the economic analysis using IMPLAN.","cited_authors":"35. Ellis, C","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://cleanenergy.org/blog/","ref_kind":"news","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881139,"raw_reference":"36. Perry, C. (2019, Sept. 17). Conway leaders still looking to annex, redevelop Grainger plant site. My Horry News. Retrieved from: https://www.myhorrynews.com/news/ local/conway/conway-leaders-still-looking-to-annexredevelop-grainger-plant-site/article_31058938-d98411e9-9dc8-072c790096c0.html","cited_authors":"36. Perry, C","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.myhorrynews.com/news/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881140,"raw_reference":"37. Blondin, A. (2020, July 17). From hazardous eyesore to wetlands: Grainger power plant’s transformation nearly complete. Myrtle Beach Online. Retrieved from: https:// www.myrtlebeachonline.com/news/local/article244272297. html 28. Southern Environmental Law Center (2016, June 1). Arsenic pollution plummets at Grainger Site as coal ash is removed in South Carolina. [Press Release]. Retrieved from: https:// www.southernenvironment.org/news-and-press/pressreleases/arsenic-pollution-plummets-at-grainger-site-ascoal-ash-is-removed-in-south 38. While cap-in-place closures do create some long-term jobs, these are minimal when compared to the short-term job creation from clean closures, even taking into account the extended duration of the former by comparing job years from cap-in-place closures to job years from clean closures (see Applied Economics Clinic, “Background Report: Benefits of Coal ash Cleanup and Remediation,” for details).","cited_authors":"37. Blondin, A","cited_year":"2020","cited_title":"Background Report: Benefits of Coal ash Cleanup and Remediation","cited_venue":null,"cited_doi":null,"cited_url":"www.myrtlebeachonline.com/news/local/article244272297","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881141,"raw_reference":"Further, while cap-in-place closures require maintenance in perpetuity to maintain the safety and stability of the unit, there is no guarantee that such maintenance will occur, and it is not specifically required by federal regulations after the termination of the 30-year post-closure period. The emergency preparedness and response that would be needed in the event of a catastrophic impoundment failure would undoubtedly require a sizeable workforce for a short amount of time, but the overall economic, social, 29. Southern Environmental Law Center (2013, Nov. 19). Another South Carolina utility agrees to remove coal ash from river shared by North and South Carolina. [Press Release]. Retrieved from: https://www.southernenvironment.org/ news-and-press/press-releases/another-south-carolinautility-agrees-to-remove-coal-ash-from-river-shared 30. Details on the Grainger cleanup were confirmed with Santee Cooper spokespeople in October and November 2020.","cited_authors":"Further, while cap-in-place closures require maintenance in perpetuity to maintain the safety and stability of the unit, there is no guarantee that such maintenance will occur, and it is not specifically required by federal regulations after the termination of the 30-year post-closure period. The emergency preparedness and response that would be needed in the event of a catastrophic impoundment failure would undoubtedly require a sizeable workforce for a short amount of time, but the overall economic, social, 29. Southern Environmental Law Center","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.southernenvironment.org/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881142,"raw_reference":"31. Northey, H. & Wittenberg, A. (2018, Sept. 26). Greens see ‘tale of two utilities’ in Florence response. E&E and environmental damage of a catastrophic failure would negate any positive contribution of those dangerous jobs. https://www.nipsco.com/our-company/news-room/ news-article/nipsco-to-retire-ash-ponds-at-michigan-citygenerating-station","cited_authors":"31. Northey, H. & Wittenberg, A","cited_year":"2018","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.nipsco.com/our-company/news-room/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881143,"raw_reference":"39. Fretwell, S. (2019, Aug. 28). Coal jobs being cut at Santee Cooper as utility moves to shutter power plants. Greenville News. Retrieved from: https://www.greenvilleonline.com/ story/news/2019/08/28/coal-jobs-cut-santee-coopermoves-shutter-power-plants/2140558001/","cited_authors":"39. Fretwell, S","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.greenvilleonline.com/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881144,"raw_reference":"49. Colias-Pete, M. (2020, May 17). Environmentalists concerned about NIPSCO plan to move coal ash from Michigan City Generating Station. Chicago Tribune. Retrieved from: https://www.chicagotribune.com/suburbs/ post-tribune/ct-ptb-nipsco-coal-ash-st-0517-20200515imxzd5fsjfdujpjtyvo62rc654-story.html 40. Wood Environment & Infrastructure Solutions, Inc., 2018. NIPSCO Michigan City Generating Station Surface Impoundment Closures (CCR Final Rule and RCRA Regulated) Closure Application. Prepared for Northern Indiana Public Service Company, December 2018.","cited_authors":"49. Colias-Pete, M","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.chicagotribune.com/suburbs/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881145,"raw_reference":"Hoosier Environmental Council (2020). Michigan City coal ash closure. Webpage: https://www.hecweb.org/issues/ environmental-health-justice/coal-ash/michigan-citycoal-ash/","cited_authors":"Hoosier Environmental Council","cited_year":"2020","cited_title":"Michigan City coal ash closure","cited_venue":null,"cited_doi":null,"cited_url":"https://www.hecweb.org/issues/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881146,"raw_reference":"51. Roemer, K., Raimi, D., & Glaser, R. (2021). Coal communities in transition: A case study of Colstrip, Montana. Resources for the Future and Environmental Defense Fund. Retrieved from: https://media.rff.org/documents/RFF_Report_21-01_ Colstrip_Case_Study.pdf 42. Ibid. 52. Geosyntec Consultants (2018, January). Colstrip wastewater facility closure plan: Units 3&4 Effluent Holding Pond Site. Report prepared for Talen Montana, LLC. P. 3 – 14. 43. See: KirK Engineering & Natural Resources, Inc., “Coal Combustion Residual Closure Analysis: Cost and Jobs Associated with Different Closure Alternatives, p. 13. https://earthjustice.org/documents/report/kirkengineering-study 53. Geosyntec Consultants (2018, January). Colstrip wastewater facility closure plan: Units 1&2 Stage I&II Evaporation Pond Site. Report prepared for Talen Montana,","cited_authors":"51. Roemer, K., Raimi, D., & Glaser, R","cited_year":"2021","cited_title":"Coal communities in transition: A case study of Colstrip, Montana","cited_venue":null,"cited_doi":null,"cited_url":"https://media.rff.org/documents/RFF_Report_21-01_","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881147,"raw_reference":"LLC. P. 3 – 11. 44. For more information: Indiana Utility Regulatory Commission (2020, Aug 14). “21st Century Energy Policy Development Task Force.” P. 62. Retrieved from: https:// www.in.gov/iurc/files/2020-Report-to-the-21st-CenturyEnergy-Policy-Development-Task-Force.updated-min.pdf 54. Geosyntec Consultants (2018, January). Colstrip wastewater facility closure plan: Plant site. Report prepared for Talen Montana, LLC. P. 3 – 13. 45. U.S. Department of Labor. (2020). Bureau of Labor","cited_authors":"LLC. P. 3 – 11. 44. For more information: Indiana Utility Regulatory Commission","cited_year":"2020","cited_title":"21st Century Energy Policy Development Task Force","cited_venue":null,"cited_doi":null,"cited_url":"www.in.gov/iurc/files/2020-Report-to-the-21st-CenturyEnergy-Policy-Development-Task-Force.updated-min.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881148,"raw_reference":"Washington, D.C. Reported by Headwaters Economics’ Economic Profile System, headwaterseconomics.org/eps 55. Montana Department of Environmental Quality [DEQ] (n.d.). Colstrip Steam Electric Station Coal Ash Ponds: FAQs. Retrieved from: https://deq.mt.gov/cleanupandrec/ Programs/colstrip 46. Estimates were generated using the 2012–2016 American Community Survey (ACS) from the United States Census","cited_authors":"Washington, D.C. Reported by Headwaters Economics’ Economic Profile System, headwaterseconomics.org/eps 55. Montana Department of Environmental Quality [DEQ]","cited_year":"n.d.","cited_title":"Colstrip Steam Electric Station Coal Ash Ponds: FAQs","cited_venue":null,"cited_doi":null,"cited_url":"https://deq.mt.gov/cleanupandrec/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881149,"raw_reference":"Environmental Quality. (2012, July 30). Administrative Order on Consent regarding impacts related to wastewater facilities comprising the closed-loop system at Colstrip Steam Electric Station, Colstrip MT. Retrieved from https://deq.mt.gov/Files/DEQAdmin/MFS/Colstrip/","cited_authors":"Environmental Quality","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://deq.mt.gov/Files/DEQAdmin/MFS/Colstrip/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881150,"raw_reference":"People, Indigenous Environmental Network, & Little Village Environmental Justice Organization (2016). Coal blooded: Putting profits before people. Retrieved from: https://naacp. org/resources/coal-blooded-putting-profits-people 58. The power plant and Rosebud mine together employed approximately 800 people as of 2017. Haggerty, J., Walsh, K. B., Haggerty, M., & Rose, J. (2017). Colstrip: The status of key policies and decision processes. Montana State University. Retrieved from https://www.montana.edu/ energycommunities/documents/Colstrip_Status_ReportFINAL.pdf 48. Northern Indiana Public Service Company (NIPSCO) (2020, Apr 16). NIPSCO to retire ash ponds at Michigan City Generating Station. [Press Release]. Retrieved from: 59.","cited_authors":"People, Indigenous Environmental Network, & Little Village Environmental Justice Organization","cited_year":"2016","cited_title":"Coal blooded: Putting profits before people","cited_venue":null,"cited_doi":null,"cited_url":"https://naacp","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881151,"raw_reference":"Northern Plains Resource Council (2018). Doing it right: Job creation through Colstrip cleanup. Retrieved from: https://northernplains.org/wp-content/uploads/2018/07/ DoingItRight_FullStudy_FNL_WEB.pdf 60.","cited_authors":"Northern Plains Resource Council","cited_year":"2018","cited_title":"Doing it right: Job creation through Colstrip cleanup","cited_venue":null,"cited_doi":null,"cited_url":"https://northernplains.org/wp-content/uploads/2018/07/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881152,"raw_reference":"Northern Plains Resource Council (2019). Cleanup jobs study research. Retrieved from: https://northernplains.org/ cleanup-jobs-study-research/ 61.","cited_authors":"Northern Plains Resource Council","cited_year":"2019","cited_title":"Cleanup jobs study research","cited_venue":null,"cited_doi":null,"cited_url":"https://northernplains.org/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881153,"raw_reference":"Northern Plains Resource Council (2018). Doing it right","cited_authors":"Northern Plains Resource Council","cited_year":"2018","cited_title":"Doing it right","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881154,"raw_reference":"II: Colstrip’s bright future with cleanup. Retrieved from: https://northernplains.org/wp-content/uploads/2019/04/ DIRTII_FINAL_WEB.pdf 62. Montana Department of Environmental Quality (2020). P. 12. Retrieved from: https://deq.mt.gov/Files/DEQAdmin/MFS/ Colstrip/Colstrip/DEQ_DecisionDocument_Units1&2RER_","cited_authors":"II: Colstrip’s bright future with cleanup. Retrieved from: https://northernplains.org/wp-content/uploads/2019/04/ DIRTII_FINAL_WEB.pdf 62. Montana Department of Environmental Quality","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://northernplains.org/wp-content/uploads/2019/04/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881155,"raw_reference":"FINAL.pdf 63. U.S. Department of Commerce. 2019. Census Bureau, American Community Survey Office, Washington, D.C., reported by Headwaters Economics’ Populations at Risk, headwaterseconomics.org/par 64. Estimates were generated using the 2012–2016 American Community Survey (ACS) from the United States Census","cited_authors":"FINAL.pdf 63. U.S. Department of Commerce","cited_year":"2019","cited_title":"Census Bureau, American Community Survey Office, Washington, D.C., reported by Headwaters Economics’ Populations at Risk, headwaterseconomics.org/par 64","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":881156,"raw_reference":"Northern Plains Resource Council (2019). Cleanup jobs study research. Appendix C. Retrieved from: https:// northernplains.org/cleanup-jobs-study-research/ 67. Ibid. 68. See 40 C.F.R. § 257.102(d). Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals from Electric Utilities, 80 Fed. Reg. 21,302 (Apr. 17, 2015), hereinafter “CCR Rule.” 69. 40 C.F.R. § 257.102(d). 70. See KirK Engineering & Natural Resources, Inc. “Reuse and Economics Impacts: NIPSCO Power Generation Facility, Michigan City, IN,” https://earthjustice.org/documents/ report/kirk-engineering-reuse-study 71. Environmental Integrity Project & Earthjustice, Coal’s Poisonous Legacy: Groundwater Contaminated by Coal Ash Across the U.S. ((Mar. 2, 2019, rev. July 11, 2019) (“Coal’s Poisonous Legacy”), available at https://www. environmentalintegrity.org/reports/coals-poisonouslegacy/.","cited_authors":"Northern Plains Resource Council","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://earthjustice.org/documents/","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}