{"document":{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25","url":"https://www.federalregister.gov/documents/2011/08/25/2011-21753/pipeline-safety-safety-of-gas-transmission-pipelines","source_native_id":"2011-21753","status":"fetched","abstract":"PHMSA is considering whether changes are needed to the regulations governing the safety of gas transmission pipelines. In particular, PHMSA is considering whether integrity management (IM) requirements should be changed, including adding more prescriptive language in some areas, and whether other issues related to system integrity should be addressed by strengthening or expanding non-IM requirements. Among the specific issues PHMSA is considering concerning IM requirements is whether the definition of a high-consequence area (HCA) should be revised, and whether additional restrictions should be placed on the use of specific pipeline assessment methods. With respect to non-IM requirements, PHMSA is considering whether revised requirements are needed on new construction or existing pipelines concerning mainline valves, including valve spacing and installation of remotely operated or automatically operated valves; whether requirements for corrosion control of steel pipelines should be strengthened; and whether new regulations are needed to govern the safety of gathering lines and underground gas storage facilities. Additional issues PHMSA is considering are addressed in the SUPPLEMENTARY INFORMATION Section under background.","action":"Advance notice of proposed rulemaking (ANPRM)."},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72"],"related":[{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":7204,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis (RIA)","date":"2022-08-26"},{"doc_id":128438,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Final Rule Draft -Redline Comparison Document","date":"2022-08-26"},{"doc_id":7209,"source":"ria","org":"PHMSA","doc_type":"regulatory_flexibility_analysis","title":"2137 AF39 Final Regulatory Flexibility Analysis RIN 2","date":"2023-09-15"},{"doc_id":7214,"source":"ria","org":"PHMSA","doc_type":"benefit_cost_analysis","title":"EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses","date":"2023-09-15"},{"doc_id":7219,"source":"ria","org":"PHMSA","doc_type":"regulatory_analysis","title":"Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010","date":"2023-09-15"},{"doc_id":7224,"source":"ria","org":"PHMSA","doc_type":"economic_analysis","title":"U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis","date":"2023-09-15"},{"doc_id":2907,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction","date":"2026-04-24"}],"references":[{"citation_id":147557,"raw_reference":"NTSB, \"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994,\" PB95-916501, NTSB/PAR-95/01, January 18, 1995.","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey, March 23, 1994","cited_venue":"NTSB/PAR-95/01","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147558,"raw_reference":"DOT, RSPA, \"Remotely Controlled Valves on Interstate Natural Gas Pipelines, (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996), September 1999.","cited_authors":"DOT, RSPA","cited_year":"1999","cited_title":"Remotely Controlled Valves on Interstate Natural Gas Pipelines (Feasibility Determination Mandated by the Accountable Pipeline Safety and Partnership Act of 1996)","cited_venue":"Department of Transportation, Research and Special Programs Administration","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"fn 4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147559,"raw_reference":"\"Stress Corrosion Cracking Study,\" Report No. DTRS56, prepared by General Physics Corporation in May 1999.","cited_authors":"General Physics Corporation","cited_year":"1999","cited_title":"Stress Corrosion Cracking Study","cited_venue":"Report No. DTRS56","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"I. Corrosion Control","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147560,"raw_reference":"\"Stress Corrosion Cracking Study,\" Report No. DTRS56-02-D-70036, submitted by Michael Baker Jr., Inc., in September 2004.","cited_authors":"Michael Baker Jr., Inc.","cited_year":"2004","cited_title":"Stress Corrosion Cracking Study","cited_venue":"Report No. DTRS56-02-D-70036","cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/meetings/DocHome.mtg?doc=1","ref_kind":"research_report","section":"I. Corrosion Control","page":null,"context_sentence":null,"paper_id":73227,"paper_title":"Stress corrosion cracking studies","paper_year":2004,"paper_doi":null},{"citation_id":147561,"raw_reference":"TTO Number 5, IM Delivery Order DTRS56-02-D-70036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation, Final Report, Revision 3, April 2004.","cited_authors":"Michael Baker, Inc.; Kiefner and Associates, Inc.; CorrMet Engineering Services, PC","cited_year":"2004","cited_title":"Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation","cited_venue":"PHMSA","cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/iim/docstr/TTO5_LowFrequencyERW_FinalReport_Rev3_April2004.pdf","ref_kind":"research_report","section":"J. Pipe Manufactured Using Longitudinal Weld Seams, fn 6","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147562,"raw_reference":"Natural Gas Storage in Salt Caverns—A Guide for State Regulators","cited_authors":"Interstate Oil and Gas Compact Commission","cited_year":null,"cited_title":"Natural Gas Storage in Salt Caverns—A Guide for State Regulators","cited_venue":"Interstate Oil and Gas Compact Commission","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"K. Establishing Requirements Applicable to Underground Gas Storage","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147563,"raw_reference":"API RP 1114, \"Design of Solution-Mined Underground Storage Facilities,\" June 1994","cited_authors":"American Petroleum Institute","cited_year":"1994","cited_title":"Design of Solution-Mined Underground Storage Facilities","cited_venue":"API RP 1114","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"K. Establishing Requirements Applicable to Underground Gas Storage","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147564,"raw_reference":"API RP 1115, \"Operation of Solution-Mined Underground Storage Facilities,\" September 1994","cited_authors":"American Petroleum Institute","cited_year":"1994","cited_title":"Operation of Solution-Mined Underground Storage Facilities","cited_venue":"API RP 1115","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"K. Establishing Requirements Applicable to Underground Gas Storage","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147565,"raw_reference":"API RP 80, \"Guidelines for the Definition of Onshore Gas Gathering Lines\"","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Guidelines for the Definition of Onshore Gas Gathering Lines","cited_venue":"API Recommended Practice 80","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"O. Modifying the Regulation of Gas Gathering Lines","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147566,"raw_reference":"ASME/ANSI B31.8S, Section 5","cited_authors":"American Society of Mechanical Engineers; American National Standards Institute","cited_year":null,"cited_title":"Managing System Integrity of Gas Pipelines (ASME/ANSI B31.8S)","cited_venue":"ASME/ANSI","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"F. Strengthening Requirements for Applying Knowledge Gained Through the IM Program","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147567,"raw_reference":"NACE RP0502-2008","cited_authors":"National Association of Corrosion Engineers","cited_year":"2008","cited_title":"NACE RP0502-2008","cited_venue":"NACE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"G. Strengthening Requirements on the Selection and Use of Assessment Methods","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147568,"raw_reference":"NACE SP0204-2008 (formerly RP0204), \"Stress Corrosion Cracking Direct Assessment Methodology\"","cited_authors":"National Association of Corrosion Engineers","cited_year":"2008","cited_title":"Stress Corrosion Cracking Direct Assessment Methodology","cited_venue":"NACE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"G. Strengthening Requirements on the Selection and Use of Assessment Methods","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147569,"raw_reference":"Canadian Energy Pipeline Association (CEPA) SCC, Recommended Practices 2nd Edition, 2007","cited_authors":"Canadian Energy Pipeline Association","cited_year":"2007","cited_title":"SCC Recommended Practices, 2nd Edition","cited_venue":"CEPA","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"I. Corrosion Control, Existing Industry Practices","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":147570,"raw_reference":"ISO 8402-1986","cited_authors":"International Standards Organization","cited_year":"1986","cited_title":"ISO 8402","cited_venue":"ISO","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"M. Quality Management Systems (QMS)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}