Final rule; delay of effective date and request for comments.

This document delays the effective date of the final rule published November 30, 2011, and scheduled to take effect on May 1, 2012. The final rule mandates that roadway workers comply with specified on-track safety procedures that railroads must adopt to protect those workers from the movement of trains or other on-track equipment on "adjacent controlled track," and requests comments on the petitions for reconsideration of the final rule that FRA has received. In response to the final rule, FRA received two petitions for reconsideration that raise a number of substantive issues requiring a detailed response. Accordingly, in order to respond fully to the petitions for reconsideration and for the reasons set forth below, this document delays the effective date of the final rule until July 1, 2013. FRA is establishing a 60-day comment period in order to permit interested parties an opportunity to respond to the submitted petitions for reconsideration.

RIN 2130-AB96 · Docket FRA-2008-0059

Other documents for the same rulemaking

2008-07-23 Regulatory impact analysisU.S. DOT/FRA - Railroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway Workers, Notice of Proposed Rulemaking, Regulatory Impact Analysis
2009-11-25 Federal RegisterRailroad Workplace Safety; Adjacent-Controlled-Track On-Track Safety for Roadway Workers
2009-11-27 Regulatory impact analysisU.S. DOT/FRA - Railroad Workplace Safety;Adjacent-Controlled-Track-On-Track Safety for Roadway Workers; NPRM: Regulatory Impact Analysis
2011-11-30 Federal RegisterRailroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway Workers
2011-12-21 Regulatory impact analysisU.S. DOT/FRA - Railroad Workplace Safety; Adjacent-Track On-Track Safety for Roadway Workers FR Regulatory Impact Analysis
2012-01-09 Regulatory impact analysisU.S. FRA/DOT - RWP RIA for Adjacent Track Final Rule - Redine Including OIRA Edits
2012-01-09 Docket documentU.S. FRA/DOT - Memo to Docket Pursuant to EO 12866 (RE OIRA Suggested Edits) - 1-5-2012 final
2012-01-09 Docket documentU.S. FRA/DOT - RWP Adjacent Track Final Rule - Redline Including OIRA Edits